Skip to content
ElmerisSwitchgear · KasselExample company

head office: Kassel, Germany · since 1949 · 1,400 people · 3 plantsElmeris UK Limited · Manchester

Getting started with AI · Electrical Engineering & Switchgear

How a panel builder gets started with AI

Elmeris doesn’t exist. Everything else on this page will feel familiar.

demi turns your systems into one record, carries over your rights and lets AI agents prepare the routine work. First the data, then the rights, then the AI. A person always approves.

ElmerisRating plate
Head office
Kassel
Since
1949
People
1,400
Plants
3

What five use cases free up

+1,191 h per yearEstimate, not a promise≈ €77,415 per year, a cautious estimate
  • IEC 61439-2
  • 400 V 50 Hz
  • InA 250 A
  • IP54
Schematic, sheet 47 of 186, of control cabinet SWS-1200: supply L1, L2, L3 and PE, motor protection breaker -Q12, contactor -K12, frequency inverter -T4, terminal strip -X3 and the filler’s motor -M4, plus the 24 V control circuit. In red pen from commissioning: -T4 at 5.5 instead of 4.0 kW, -Q12 set to 13 instead of 10 A, a new wire from -K12:14 to X3:22 and a new bridge from X3:23 to X3:24. demi has ringed two spots: X3:22 is already in use, and the new inverter is missing from the parts list.0123456789SupplyFiller drive M4Control 24 V DCL1L2L3PE/46.9/48.0I>-Q1210 A-K12/47.7-T4VFD4.0 kWDI1123PE-X3-W47 4G2,5M3~-M44.0 kW+24 V0 V1314-K12Enable21222324-X3from PLC -A3:Q0.4-K12-S3 /52.2guard doorSpare13 A5.5 kWnewbridgeComm. 12.11.X3:22 already in useby -S3, sheet 52-T4 at 5.5 kWnot in the parts listControl voltage 24 V DCCross-sections in mm², Cu=A1187+SWS1 · sheet 47

demi’s change list, extract

Changes from the red pen, with sheet and column
47.3-T4 5.5 instead of 4.0 kW, not in the parts list
47.2-Q12 setting 13 instead of 10 A
47.6New wire -K12:14 to X3:22, terminal in use
47.9New bridge X3:23 to X3:24
52.2Cable -W52 renumbered
61.5Wire moved from -A3:5 to -A3:7
88.3-Q31 setting 2.5 instead of 2.2 A
Cabinet
1,200 × 2,000 × 600 mm
Rating
400 V 50 Hz, InA 250 A
Protection
IP54
Standard
IEC 61439-2

Revisions

Revision table of the schematic
A05/2026Released for production
B09/2026Two more drives, customer change
C11/2026As built, after commissioning
Elmeris
TitleSchematic, filler drive M4
Parts listSL-1187 index B
Serial numberSN 26-04471
Sheet47/186
Rev.B
Sheet 47 of the SWS-1200 schematic, just as it came back from commissioning. The red pen is the commissioning engineer’s, the rings are demi’s. Every value leads to its source.

The payoff

Example calculation: five use cases free up 1,191 hours a year

≈ €77,415 per yearEstimate, not a promise
StartUse caseVolume per monthShareToday per yearFreed upValue per year
1Red-pen markups back into the schematicEngineering, electrical engineering12 × 8 h30%1,152 h207 h€13,455
2Design and routine verification to IEC 61439Quality & test bay30 × 2 h30%720 h130 h€8,450
3Build quotes from similar past ordersSales & proposal engineering80 × 3 h30%2,880 h518 h€33,670
4Spot missing parts before you release an orderProduction, production planning400 × 10 min40%800 h192 h€12,480
5Find your installed base by serial numberService300 × 10 min40%600 h144 h€9,360
Total6,152 h1,191 h€77,415

Of 6,152 hours, we count 1,191: volume times time times twelve months, then only the cautious share of that, times 0.6 for partly digital processes. That is about 0.7 full-time roles. Calculated at €65 per hour: €49.50 labour cost in manufacturing according to Destatis, plus workplace, IT and overheads. A number doesn’t fit your company? You can change every one of them in the configurator.

The problem

Monday, 7:10 am: the SWS-1200 schematic comes back in red

Commissioning of filling line 3 at customer #2208 finished on Thursday. On Friday at 16:40 the return reached the mailbox: 23 pages marked in red out of 186 sheets, 17 as scans and 6 as phone photos. On them: rewired conductors, new bridges, changed settings and a swapped inverter.

The customer gets the as-built documentation, and only with it does the final invoice go out. The electrical engineer who drew the cabinet has long moved on to the next order. For every change she needs three sources:

In the mailbox23 pages, no sheet number in the file name. The photos are called IMG_4471.jpg.

In E-CADProject =A1187 as it stood before commissioning, revision B.

In the ERPParts list SL-1187 with the old inverter, shipped long ago.

It takes three weeks until all the changes are in E-CAD. That is how long the final invoice waits, and service works from the old drawing.

Commissioning mailbox16 since Tuesday, 6 returns
  1. REDSWS-1200, filling line 3, customer #220823 pages: 17 scans, 6 photos · =A1187
  2. PHOTONHV-1600, hospital, section 3Insulation test sent on later
  3. REDMCC-4000, desalination plantSections 2 to 9, from Dubai · =A0994
  4. QUERYUV-400, office buildingWhich revision applies on site?
  5. REDSWS-800, packaging machine4 pages · =A1152
  6. PHOTOMCC-3200, sewage works, unit 4BRating plate of the motor protection relay
  7. REDSWS-1600, test rig, to UL 508A11 pages, from Pittsburgh · =A1139

+ 9 more: photos, queries, test reports

What happens in Kassel every month

  1. 12red-pen returns from commissioning
  2. 30main switchboards and MCCs with routine verification
  3. 80quotes with their own engineering
  4. 400production orders in Kassel
  5. 300serial number lookups

Together 6,152 hours a year, about 3.5 full-time roles. Most of it falls on electrical engineering and proposal engineering: the same people who should be drawing the next cabinet and pricing the next quote.

Where it hurts

  1. 01
    The red pen stays in the cabinet

    At every commissioning, wires are moved, bridged and swapped. It takes weeks until the changes are in E-CAD. Until then the drawing does not match the cabinet, and the final invoice waits.

  2. 02
    Every swap touches the design verification

    A circuit breaker has a 26-week lead time, purchasing proposes another make. Whether the main switchboard still sits within its design verification is checked by hand today, if someone remembers.

  3. 03
    Quotes depend on two people

    Which earlier MCC comes closest to a new enquiry, and where the wiring hours ran away, is known by two proposal engineers. The big quotes wait for them.

What demi does · Example run

The next day: revision C at the customer, two conflicts cleared first

  1. The pages

    demi reads the 17 scans and 6 photos and matches every page to its sheet. For the photos without a sheet number, what is in the picture helps: columns, devices and terminals.

    Commissioning mailboxMail #5521
  2. The changes

    41 markups, each with sheet, column, device, old and new state: 17 rewired conductors, 9 new bridges, 6 settings on motor protection breakers, 8 new cable numbers and one swapped inverter.

    =A1187 rev. B186 sheets
  3. The conflicts

    The new wire from -K12:14 is meant for X3:22, and that terminal is already in use: by guard door switch -S3 on sheet 52. Inverter -T4 at 5.5 kW is not in the parts list.

    X3:22SL-1187 index B
  4. The verification

    The larger inverter adds 61 W of power loss to the cabinet: 1,087 instead of 1,026 W. The limit is 1,150 W at 35 °C. The temperature rise stays within the design verification.

    BN-SWS-12Temperature rise
  5. The takeover

    The electrical engineer accepts 39 changes in one morning and enters them in E-CAD. She clears two with commissioning: the new wire goes to X3:25, and the rating plate photo shows -T4 is the 5.5 kW type.

    E-CADRev. C
  6. The approval

    The head of electrical engineering approves revision C, with parts list index C. The as-built documentation goes to the customer, the final invoice the same day.

    A person approvesLog

Not every return is this thick. On average a commissioning at Elmeris brings 15 to 20 changes, and the table above counts that average, not the three weeks SWS-1200 would have waited.

ElmerisSwitchgear · KasselExample company

One feeder is swapped, the plant keeps running. Since 1949.

Elmeris: switchgear from Kassel, family-owned in the third generation

Elmeris builds control cabinets, main low-voltage switchboards, motor control centres and distribution boards for machine builders, the process industry and buildings. In withdrawable motor control centres for the process industry, Elmeris is the world market leader.

From switch panel to withdrawable unit

  1. An electrician sets up a workshop for switch panels in Kassel. The town’s factories are starting up again and need power at every machine.

  2. The first motor control centre with withdrawable units, for a chemical plant. One feeder can be swapped while the others keep running.

  3. The second generation takes over. The withdrawable units become a series with fixed sizes, tested like a device.

  4. The Brno plant for withdrawable units and sheet metal. Since 2004 the Wrocław plant has wired control cabinets.

  5. Sales in Dubai and Saudi Arabia: MCCs for desalination plants and refineries. Then Pittsburgh, with service and cabinets to UL 508A.

  6. The third generation leads, together with a managing director from outside the family. Now demi arrives, first in electrical engineering in Kassel.

Company profile

Founded
1949 in Kassel, as a workshop for switch panels
People
1,400 in seven areas. All in the org chart
Plants
Kassel 820, Brno 300, Wrocław 220 people; plus 60 in sales and service abroad
Owners
The founding family, in the third generation
Customers
Process industry 45%, machinery and plant engineering 30%, buildings and infrastructure 25%
Exports
62% of revenue
Revenue
€290 million
Per year
Around 3,200 cabinets and sections, including 900 MCC sections with 14,000 withdrawable units
Systems
ERP, E-CAD, file storage, test bay database, production control, CRM, service tool and mailboxes

Locations

  • ManchesterUnited KingdomSalesElmeris UK Limited
  • KasselGermanyHead office and plantElmeris Elektrotechnik GmbH & Co. KG
  • BrnoCzechiaPlantElmeris CZ, s.r.o.
  • WrocławPolandPlantElmeris Polska Sp. z o.o.
  • PittsburghUnited StatesSales and serviceElmeris USA, LLC
  • DubaiUnited Arab EmiratesSalesElmeris Middle East FZE
  • RiyadhSaudi ArabiaSalesElmeris Saudi Arabia LLC

Four product lines

  • SWSControl cabinetsto IEC 61439-2, for North America to UL 508A
  • NHVMain switchboardslow voltage up to 6,300 A
  • MCCMotor control centreswithdrawable, for the process industry
  • UVDistribution boardsup to 630 A, for industry and buildings

Office Floor <=> Shop Floor

Where demi works at Elmeris: nine of 14 stations

demi can work at all 14 stations. Pick a use case and see which ones it touches.

Office Floor

  1. O1Sales & proposal engineering3
  2. O2Project management 
  3. O3Electrical engineering1
  4. O4Standards & verification2
  5. O5Purchasing & scheduling4
  6. O6Production planning4
  7. O8Service & spare parts5
One record. Every fact runs both ways.

Shop Floor

  1. S1Goods in & stores 
  2. S4Test bay2
  3. S5Commissioning1
  4. S6Installed at the customer5
  • demi works here
  • Next at Elmeris
  • demi can work here too
  • Path of cabinet SN 26-04471: from the quote through schematic, routine verification and commissioning to the plant at the customer

The start

How Elmeris starts: red pen first, then the verifications

Which systems and use cases come in during the first 90 days
The first 90 daysDay 1Week 1Weeks 2 to 4Months 2 and 3
Systems
Mailboxes, E-CADCommissioning mailbox and the E-CAD projects with parts lists, read-only, through a small connector in your own network
ERP, file storageRead-only
Test bay database, production controlRead-only
CRM, service toolRead-only
Use cases
1 Red penWith approval. Part of daily work from day 30
2 Design verificationWith approval. Readings from week 2
3 QuotesWith approval
4 Missing partsWith approval
5 Plants by serial numberWith approval
Writing back
Into the ERPParts list with a new index, after approval

Why the red pen comes first

Every return that sits waiting holds up a final invoice, and until then service works from a drawing that does not match the cabinet. The use case only needs reading: the commissioning mailbox and the E-CAD projects are in the record from day 1, orders and design verifications from the ERP and file storage from week 1. That is why demi also checks every swap against the verification from week 1, and the test bay readings join from week 2.

What Elmeris does itself

  • Head of ITTwo days for the connections
  • Head of electrical engineeringOne hour a week
  • Electrical engineeringTwo weeks of checking change lists, alongside normal work
  • Standards & verificationCheck the limits of the system verifications with demi once

1Data

Eight systems become one record

1,213Entries
1,293Links
8Systems

An extract from Elmeris’s record.

AConnected

  • ERP
    Orders, parts lists, stock, purchase orders, post-calculationEvery cabinet is its own item, named after the customer
  • E-CAD
    Schematics, terminal and cable plans, devices, article dataThe state after commissioning is missing until someone enters it
  • File storage
    Project folders, makers’ system verifications, specifications, data sheetsWhich verification belongs to which section is in the folder name
  • Test bay database
    Routine verification reports, readings, test equipmentReports start on paper and get typed up
  • Production control
    Production orders, feedback, wiring hours per cabinetIts own database, export only as CSV
  • CRM
    Customers, enquiries, quotes, specificationsGulf projects run through the sales company, with their own customer number
  • Service tool
    Commissionings, call-outs, spare parts per serial numberThe serial number is sometimes only in the free text
  • Mailboxes
    Commissioning mailbox with scans and photos, customer emailsThe photos are named by the camera, not by the sheet

Nothing gets replaced. Running a different ERP? demi connects to everything, from SAP and Oracle to the specialist software from the next town. At first, demi only reads. A person connects a system after seeing who will read what.

BHeld

The same cabinet. Eight systems. Now one entry.
SN 26-04471ERP, rating plate, built in week 41/2026
Type SWS-1200ERP, E-CAD
Schematic =A1187E-CAD: built to rev. B, rev. C today
Parts list SL-1187ERP: index B, index C after approval
Terminal X3:22E-CAD, terminal plan: used by -S3
Inverter -T4Red pen on sheet 47, rating plate photo, mailboxes
Design verification BN-SWS-12File storage: system verification and temperature-rise calculation
Routine verification SP-26-04471Test bay database, 09.10.2026
Customer #2208, specification LH-2208CRM, specification from an email
Commissioning IB-26-0311Service tool, 09 to 12.11.2026
Target, design verification BN-SWS-12≤ 1,150 WPower loss in the cabinet at 35 °C
Actual, with the new -T41,087 WTemperature-rise calculation for rev. C

CLinked

Customer #2208 runs control cabinet SN 26-04471, an SWS-1200 with schematic rev. C, on its filling line 3.

Who?

Customers, contacts, teams

  • Customer #2208 Beverage bottler, customer since 2009
  • P-2208-01 Plant engineer, person
  • OE-EK-KS Electrical engineering Kassel

CRMrun by customer #2208

What kind?

Types and drawings

  • SWS-1200 Control cabinet, IP54
  • =A1187 Schematic, 186 sheets
  • SL-1187 Parts list, index B as built
  • -T4 Frequency inverter, 5.5 kW today

E-CAD, ERPis an SWS-1200, rev. B

Made from?

Production and testing

  • FA-26-08812 Production order, wiring Kassel
  • SP-26-04471 Routine verification, 48 test items
  • P2 Test station in the test bay

Production control, test baybuilt in week 41/2026

What’s open?

Commissioning and service

  • IB-26-0311 Commissioning, 09 to 12.11.
  • T-26-0418 Query: spare inverter in stock?

Service toolcall-out on this cabinet

Which one exactly?

SN 26-04471

Control cabinet SWS-1200, rev. C, line 3

  • The serial number tells you which schematic and which parts list this exact cabinet was built to, and what changed at commissioning.

ERPcabinet by serial number

What applies?

Quote, order, specification

  • #26-0233 Quote, line 3
  • A-26-1187 Order
  • LH-2208 Specification: 20% spare, IP54

CRM, ERPcontract for this cabinet

What’s written?

Emails, scans, reports

  • Mail #5521 Return with 23 pages
  • SP-26-04471 Routine verification report
  • BN-SWS-12 Design verification, temperature rise

Mailboxes, file storage, test bayis about this cabinet

What should be?

Requirements

  • IEC 61439-2 Design and routine verification
  • IEC 81346 Reference designations
  • LH-2208 20% spare per terminal strip

File storage, CRMapplies to this cabinet

What do we think?

Findings

  • F-26-207 X3:22 used twice, -T4 missing from the parts list

demifinding on this cabinet

At the pump maker the centre is the pump with its serial number, at the sensor maker the device. At Elmeris it is the cabinet, wired as it really is after commissioning. The grid stays, the centre changes.

DWhat it can do

  • Recognise

    -T4 on the phone photo, the item in the parts list and the article in the ERP are the same device.

  • Unify

    mm², AWG and kcmil from drawings for North America become one cross-section.

  • Prove

    Every value shows its source, place and version. Unclear markups are kept too.

  • Look back

    The schematic SN 26-04471 was built to: rev. B, not rev. C after commissioning.

  • Write back

    After approval, the parts list with its new index lands in the ERP.

2Rights

The org chart becomes the rights system

What only purchasing sees in the ERP, only purchasing sees in demi. Only electrical engineering changes schematics; only standards & verification and the test bay change verifications and test reports.

1,400 people, seven areas, three plants

Each area works with what the one before delivers: electrical engineering with the order from sales, purchasing with the parts list, wiring with the released schematic, the test bay with the finished cabinet, commissioning with the tested SWS-1200.

Management and administration 96Management 3 · Finance and controlling 30 · HR 22 · IT 24 · Legal and export control 7 · Assistants 10
  • 1Sales & proposal engineering 168
    • Sales Germany 34
    • Sales companies 46
    • Proposal engineering 58
    • Project management 30
  • 2Engineering 236
    • Electrical engineering 150
    • Mechanics & copper 38
    • Standards & verification 18
    • MCC development 30
  • 3Purchasing and logistics 120
    • Purchasing & scheduling 64
    • Stores & shipping 56
  • 4Production 610
    • Production planning 24
    • Sheet metal & copper 120
    • Assembly & withdrawable units 206
    • Wiring 260
  • 5Quality & test bay 80
    • Test bay 56
    • Quality management 24
  • 6Service 90
    • Commissioning 52
    • Service & spare parts 38

96 + 168 + 236 + 120 + 610 + 80 + 90 = 1,400 people

Who opens which room

WhoSchematics & parts listsVerifications & test reportsCosting & pricesSuppliers & purchase pricesPlants at the customerHRApproves
Proposal engineeringreadsreadsedits–reads–Quote, price
Electrical engineeringeditsreads––reads–Schematic and parts list, change by change
Standards & verificationreadsedits––––Design verification
Test bayreadsedits––––Routine verification, by the test engineer
Purchasing & schedulingreads––edits––Purchase order, another make only with verification
Commissioningreadsreads––edits–Red pen, commissioning report
Service & spare partsreadsreadsspare parts–edits–Call-out, spare parts quote
HR–––––edits–
Customer #2208 in the portalownown––own––
Red-pen agent, AI coworkerreadsreads––reads–Never
Quote agent, on behalfAs much as the person who starts it. Never more.Never

Every room has keys. They come from your systems and never multiply on their own.

Only sales sees prices, only purchasing sees purchase prices. Purchasing orders another make only once standards & verification has checked it against the design verification.

An agent carries the keys of the person it works for. An AI coworker has its own, and always a person who is accountable for it. Every access is in the log.

3Intelligence

Five agents do the work, people approve

  1. Red-pen agent

    AI coworker, accountable: head of electrical engineering

    TriggerA new return in the commissioning mailbox: scans or photos of marked-up pages
    ReadsScans and photos, the E-CAD project with terminal and cable plans, parts list and order
    DoesMatches every markup to sheet, column and device, checks it against terminal plan, parts list and ratings, reports conflicts. What it cannot read with certainty, it shows with the image detail
    ApprovalElectrical engineering, change by change
  2. Verification agent

    AI coworker, accountable: standards & verification

    TriggerParts list released or a component swapped
    ReadsParts list and section layout, makers’ system verifications, data sheets, test bay readings
    DoesChecks every component by order number against the design verification, calculates the power loss per section, sets up the routine verification report
    ApprovalTest engineer in the test bay
  3. Quote agent

    Works for the person who starts it

    TriggerSomeone in proposal engineering starts it on an enquiry with a specification, such as an MCC for a desalination plant
    ReadsEarlier quotes and orders, schematics, post-calculation and wiring hours
    DoesFinds the closest orders, puts plan and actual side by side and drafts the cost structure, every line with its origin. That an MCC in the Gulf needed a fifth more wiring is right there
    ApprovalProposal engineering, above the limit the head of sales
  4. Release agent

    AI coworker, accountable: head of production planning

    TriggerEvery morning at 5:30, for the orders of the next ten working days
    ReadsStock, reservations, open purchase orders, release status of the schematics, test equipment
    DoesChecks every production order against a fixed checklist. For week 48: 81 of 96 ready, 9 waiting for material with a date, 6 for a released schematic
    ApprovalProduction planning
  5. Installed-base agent

    Works for the person who starts it

    TriggerSomeone in service asks about a serial number or a component series, for example from Pittsburgh
    ReadsDeliveries, as-built parts lists, commissioning and service reports, customers and sites
    DoesAnswers questions per cabinet and lists every withdrawable unit with a given motor protection relay, every statement with its source
    ApprovalService

A fixed, versioned method calculates the power loss from data sheets, enclosure and ambient temperature, not the language model. Standards & verification decides which method applies.

Calculations run on Elmeris’s own rules and data. Anything that goes out or is written back to a system is approved by a person.

The roadmap

Next: copper, wiring and complaints

  1. Busbars from the schematic

    Rated current and section layout are in the drawing. demi prepares the cutting and bending list for every copper busbar from them, and sheet metal & copper approves instead of redrawing.

    S2
  2. Wire list for the wiring shop

    Every wire with cross-section, colour, length, destination and ferrule, per cabinet from E-CAD. What the red pen changes is already in the list for the next cabinet of the same series.

    S3
  3. Complaints by serial number

    Every complaint hangs on the cabinet and its as-built parts list. So quality management sees which other orders carry the same component before the next customer calls.

    O7

Sources

Why data first, then rights, then AI

60%

Through 2026, Gartner expects organisations to abandon 60% of AI projects that lack AI-ready data.

Gartner · 2025 · on step 1, dataOpen the source (opens in a new tab)
Least privilege

Share sensitive data in LLM apps on a least-privilege basis only, meaning just what a user or process needs.

OWASP GenAI Security Project · 2025 · on step 2, rightsOpen the source (opens in a new tab)
70%

70% of AI’s potential value sits in core functions such as sales, manufacturing and supply chain.

Boston Consulting Group · 2025 · on step 3, intelligenceOpen the source (opens in a new tab)
ElmerisSwitchgear · KasselExample company

Elmeris doesn’t exist. Your company does.

In 20 minutes we show you demi on a case like yours: bring the data together, set the rights, let AI do the work.

Elmeris does not exist: a made-up example company in Electrical Engineering & Switchgear, not a real firm. An estimate from our assumptions, not a promise. You can change every number in the configurator.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases