Skip to content
WattarisEnergy · Senftenberg plantExample company

Wattaris Energy UK Limited · London, since 1957, 18,000 people, 14 sites in 13 countries

Getting started with AI · Energy & Utilities

How an energy technology maker gets started with AI

Wattaris doesn’t exist. Everything else on this page will feel familiar.

demi turns your systems into one record, carries over your rights and lets AI agents prepare the routine work. First the data, then the rights, then the AI. A person always approves.

What five use cases free up

+893 h per yearEstimate, not a promise≈ €58,045 per year, calculated cautiously
Single-line diagram of secondary substation ONS 4711 “Am Sportplatz”: medium voltage 20 kV with two cable panels K1 and K2 and transformer panel T1, transformer AT 630/20 rated 630 kVA, low voltage 0.4 kV with eight feeders. Highlighted is the path from cable K1 through the transformer to feeder 3.MEDIUM VOLTAGE 20 kV · SWITCHGEAR RS 24 · 630 A · 20 kA 1 s · SF6-FREEK1K2T1FPIto ONS 4710Cable 3 × 1 × 150FPIto ONS 4712Cable 3 × 1 × 150HV fuse 40 AT1 · AT 630/20630 kVA · 20/0.4 kV · Dyn5uk 4% · ONAN · Ecodesign Tier 2CT 1,000/5 ALOW VOLTAGE 0.4 kV · INCOMER 1,000 A123 · Schulstraße45678SECONDARY SUBSTATIONONS 4711 “Am Sportplatz”Compact substation KS 630 · Serial no. S 26-0472IAC AB 20 kA 1 s · Telecontrol via LTE 450Switchgear RS 24, SN R 26-0933 · Fault passage indicator 400 A8 feeders, NH size 2 fuse switch-disconnectors, 400 A
Wattaris
TitleSingle-line diagram ONS 4711
RevisionB,
Order26-0561
Customer#1520, call-off 9
The single-line diagram of secondary substation ONS 4711, in customer #1520’s grid since 19 November 2026. It hangs like this inside every substation door. Every value leads to its source.

The problem

Monday, 6:40 am: the calibration certificate in the test bay expires on Friday

Test bay schedule, week 48Loss measurement system LMS-2 · Calibration certificate KAL-25-118 · 31 routine tests

Mon

5units

  • 26-1288 to 26-1292
  • Municipal utility #1307

Tue

6units

  • 26-1293 to 26-1298
  • Solar park, transformer stations in the field

Wed

4units

  • 26-1299, 26-1300
  • 26-1284, 26-1285: voltage-regulated, with on-load tap changer

Thu

12units

Acceptance by the inspector from #1520

  • 26-1301 to 26-1312
  • Framework agreement RV-2025-17, call-off 10

Fri

4units

  • 26-1313 to 26-1316
  • Two charging hubs, 2 × 1,000 kVA each
LMS-2 calibrated until 27 Nov

from Mon

28units

  • Rest of call-off 10
  • No instrument within its calibration interval, no measurement

Every transformer gets a routine test to IEC 60076-1: no-load and load losses, ratio, winding resistance, dielectric tests. LMS-2 measures the losses.

The head of the test bay walks through the bay before the shift starts. The calibration sticker on the LMS-2 loss measurement system reads: valid until 27 November 2026. That is Friday.

Until Friday, the calibration still covers 31 routine tests, twelve of them on Thursday, witnessed by the inspector from grid operator #1520. From Monday, 28 more transformers from the same call-off are waiting, and no customer accepts a test report made with an instrument out of calibration.

Three people spend two days phoning round calibration labs. The first free slot is in December. Call-off 10 slips by two weeks.

In the CAQ systemInstrument LMS-2, next calibration 27 Nov 2026. In October, the reminder went to a shared mailbox that nobody reads any more.

In the technical specificationTL-1520 Rev. 7, section 8.4.2 on page 61: every instrument must be within its calibration interval on the test day, and its calibration certificate must be attached to the test report.

In someone’s headThe metrology coordinator who books the dates with the lab has been on parental leave for three weeks.

What happens here every month

  1. 300questions about a substation
  2. 80inspection deadlines
  3. 250spare-part requests
  4. 10tenders
  5. 400manual questions

Together that is 3,600 hours a year, about 2 full-time roles. The test bay, on which every calibration deadline and every acceptance test depends, loses four of its 14 people to retirement by 2030.

What hurts there

  1. 01
    Certificates for every grid connection

    Type test reports, evidence for the VDE-AR-N 4110 plant certificate at grid connection substations, declarations of conformity: for every project, someone has to pull together the versions that are valid.

  2. 02
    Tenders under utilities procurement rules

    Grid operators and municipal utilities list hundreds of requirements. Each one is checked by hand against data sheets, type test reports and certificates.

  3. 03
    Variants and software versions

    Power ratings, converters, protection relays, firmware versions: only a few people in the company know which combination is certified for which project.

What demi does · An example

The calibration deadline is flagged a good six weeks ahead

  1. The deadline

    demi reads the CAQ system every morning. The next calibration of LMS-2 is due on 27 November, in 46 days.

    LMS-2KAL-25-118
  2. What depends on it

    The test bay schedule already lists 31 routine tests for week 48, plus the acceptance of call-off 10 on Thursday. TL-1520 requires an instrument within its calibration interval on the test day.

    RV-2025-17TL-1520 Rev. 7
  3. The draft

    An appointment request to the calibration lab for Tuesday, 24 November, in the morning. The test bay schedule moves that day’s six transformers to the afternoon. The head of the test bay approves.

    Mail #5102Human approves
  4. The calibration

    The lab calibrated LMS-2 in the test bay in the morning. From 13:40, the day’s six transformers are on test. The new certificate KAL-26-131 goes into the CAQ system as soon as the head of the test bay approves it. Next calibration: 24 November 2027.

    KAL-26-131
  5. The acceptance

    The inspector from #1520 accepts the twelve transformers 26-1301 to 26-1312. Every test report carries the new certificate.

    SP-26-1301SP-26-1312
  6. Call-off 10 carries on

    The remaining 28 transformers go into the test bay from Monday. The delivery date in the framework agreement holds.

    Call-off 10Log

Service visits under maintenance contracts and periodic inspections at grid connection substations make up most of the deadlines. Nobody spends two days phoning calibration labs for those, as with LMS-2, so the calculation below counts each deadline at its routine effort only.

WattarisEnergy · Senftenberg plantExample company

Every substation has two numbers: the grid operator’s and ours.

At the Senftenberg plant the 24 kV range now does without SF6, and around 38,000 Wattaris substations are already in the grid

From the Ruhr via Lusatia to the grid of the energy transition

  1. Founded in Essen: meters and distribution transformers for the Ruhr’s municipal utilities.

  2. The Senftenberg plant is born: the Lusatian pits that are still working need their mobile 30/6 kV substations converted. Electricians and engineers from the open-cast mines’ power supply take on the job. In 1993 the first compact substation for eastern Germany’s newly built distribution grids leaves the hall.

  3. Stock market listing. Senftenberg gets its own winding shop, and the 630 kVA transformer becomes the plant’s standard unit.

  4. After the wind farms (since 2004), now solar parks too: grid connection substations on former mining land. Sales and project companies in Europe, North America, Asia and Africa.

  5. Since 1 January, the entire 24 kV range leaves the factory free of SF6, with vacuum and dry air.

Profile

Group
Wattaris Energie SE, Essen: 14 sites in 13 countries, a European public limited company
Founded
1957 in Essen, Senftenberg plant since 1991
People
18,000 in the group, 410 at the Senftenberg plant in eight departments, 214 of them in production and 14 in the test bay. All departments in the org chart
Plant
Senftenberg: winding shop, tank and switchgear fabrication, substation assembly, test bay
Customers
Grid operators and municipal utilities 60%, wind and solar farms 25%, charging and storage sites 10%, industry 5%
Plant revenue
€118 million
In the grid
Around 38,000 substations and 61,000 transformers at some 140 grid operators and municipal utilities
Per month
Around 140 routine tests, 10 tenders, 250 spare-part requests
Systems
ERP, CRM, E-CAD, DMS, test bay system, CAQ, service planning and the inbound channels (mailboxes, tender portals)

Locations

  • LondonUnited KingdomTradingWattaris Energy UK Limited
  • EssenGermanyHeadquartersWattaris Energie SE
  • ParisFranceSalesWattaris Energy France SAS
  • MadridSpainSalesWattaris Energy España S.L.U.
  • WarsawPolandSales and operationsWattaris Energy Polska Sp. z o.o.
  • CopenhagenDenmarkOffshore windWattaris Energy Danmark A/S
  • OsloNorwayTradingWattaris Energy Norge AS
  • StockholmSwedenSalesWattaris Energy Sverige AB
  • HoustonUnited StatesTradingWattaris Energy North America, Inc.
  • ShanghaiChinaSalesWattaris Energy (Shanghai) Co., Ltd.
  • Hong KongHong KongTradingWattaris Energy (Hong Kong) Limited
  • Abu DhabiUAEProjectsWattaris Energy Middle East L.L.C.
  • JohannesburgSouth AfricaProjectsWattaris Energy South Africa (Pty) Ltd
  • NairobiKenyaProjectsWattaris Energy Kenya Limited

Four product lines

  • KSCompact substationsDistribution and grid connection, up to 36 kV
  • ATDistribution transformers100 to 2,500 kVA, Ecodesign Tier 2
  • RS 24Switchgear24 kV, 630 A, SF6-free
  • LSCharging and storage stations1 to 4 MVA in one enclosure

Office Floor <=> Shop Floor & Test Bay

Where demi works at Wattaris: in eight of 14 steps

demi can work in all 14 steps. Pick a use case and see which ones it touches.

Office Floor

  1. O1Market & grid operators 
  2. O2Tender & specification4
  3. O3Quote & costing3 4
  4. O4Framework & call-off2
  5. O5Engineering & diagrams1
  6. O6Docu­mentation & certificates2 4 5
One record. Every fact runs both ways.

Shop Floor & Test Bay

  1. S3Test bay2
  2. S4Shipping & loading 
  3. S5Service, installation & commissioning1 2 3 5
  4. S6Substations in the customer’s grid1
  • demi works here
  • Next at Wattaris
  • demi can work here too
  • Path of deadline KAL-25-118: from the test bay via the calibration certificate to call-off 10

The payoff

Example calculation: five use cases free up 893 hours a year

≈ €58,045 per yearEstimate, not a promise
StartUse caseVolume per monthShareToday per yearFreed upValue per year
1Find your installed base by serial numberService300 × 10 min40%600 h144 h€9,360
2Stay on top of inspections and maintenance proofService80 × 20 min40%320 h77 h€5,005
3Spare-part quote from a nameplate photoService250 × 20 min40%1,000 h240 h€15,600
4Match tenders to your productsSales10 × 4 h50%480 h144 h€9,360
5Manual answers right at the machineKnowledge400 × 15 min40%1,200 h288 h€18,720
Total3,600 h893 h€58,045

Of 3,600 hours, we count 893: volume times time times twelve months, then only the cautious share of that, times 0.6 for partly digital processes. That is about 0.5 full-time roles. Calculated at €65 per hour: €49.50 labour cost in manufacturing according to Destatis, plus workplace, IT and overheads. A number doesn’t fit your company? You can change every one of them in the configurator.

The start

How Wattaris starts: the substations first, then the deadlines

Which systems and use cases join in the first 90 days
The first 90 daysDay 1Week 1Weeks 2 to 4Months 2 and 3
Systems
ERP, mailboxesDeliveries and serial numbers, read-only
E-CAD, CAQ, test bay systemRead-only, via a small connector in their own network
DMS, service planningRead-only
CRM, tender portalsRead-only
Use cases
1 Installed baseWith approval. Part of daily work from day 30
2 Inspection deadlinesWith approval
3 Spare-part quoteWith approval
4 TenderWith approval
5 Manual on siteWith approval
Writing back
Into the CAQ system and service planningAfter approval

Why the substation file comes first

Use case 1 creates it. Use cases 2, 3 and 5 build on it. Only once demi knows that ONS 4711 at the grid operator and S 26-0472 in the ERP are the same substation does the spare part find its variant, the answer its manual and the maintenance its substation. Reading is enough for that: ERP and mailboxes from day 1, E-CAD from week 1. The next calibration deadline is already in the calendar, so for the inspection deadlines demi also reads the CAQ and test bay systems from week 1. Technical specifications and maintenance contracts join from week 2, with the DMS and service planning.

What Wattaris does itself

  • Head of ITTwo days for the connections
  • Head of serviceOne hour a week
  • Head of test bayTwo weeks of reviewing drafts, alongside normal work

1Data

Eight systems become one record

1,255entries
1,371links
8systems

An excerpt from Wattaris’ record.

AConnected

  • ERP
    Orders, call-offs, deliveries, as-built BOMs, serial numbersThe ERP knows the serial number, not the grid operator’s substation number
  • CRM
    Grid operators, municipal utilities, project developers, contacts, opportunitiesThe same customer as a group, as a grid company and as a purchasing consortium
  • E-CAD
    Single-line diagrams, circuit diagrams, terminal diagramsThe substation number appears only in the title block
  • DMS
    Type test reports, data sheets, declarations of conformity, operating manualsEvery variant has its manual, every revision its PDF
  • Test bay system
    Routine test reports per serial number, measured valuesThe report names the instrument, but not its calibration certificate
  • CAQ
    Instruments, calibration certificates, complaintsReminders go to a shared mailbox
  • Service planning
    Maintenance contracts, field jobs, commissioningsDeadlines per substation in a separate list
  • Mailboxes, tender portals
    Requests, nameplate photos, tendersRequests often call the substation by its local name, such as “Am Sportplatz”

Nothing gets replaced. Running a different ERP? demi connects to everything, from SAP and Oracle to the specialist software from the next town. At first, demi only reads. A person connects a system after seeing who will read what.

BHeld together

The same single-line diagram, scaled down: cable panels K1 and K2, transformer panel T1, low voltage LV. Every label leads to its row in the entry.FPIFPIHV fuse 40 A12345678K1K2T1LVONS 4711= S 26-0472
The same substation. Eight systems. Now one entry.
ONS 4711 “Am Sportplatz”E-CAD, title block of ÜS-26-0561-01 (call-off 9 under RV-2025-17); CRM, customer #1520
KS 630, S 26-0472ERP, order 26-0561
ÜS-26-0561-01 Rev. BE-CAD
AT 630/20, serial no. 26-1187Test bay system, SP-26-1187
RS 24, SN R 26-0933ERP, as-built BOM
LV, 8 feeders, 400 AE-CAD, circuit diagram
IAC AB 20 kA 1 sDMS, TP-23-044, page 12
LMS-2, KAL-25-118CAQ
Maintenance WV-1520-03Service planning
Mail #5174Mailboxes, question about the fault passage indicator
Required value, Ecodesign Tier 2P0 ≤ 540 WNo-load losses at 630 kVA
Measured value, routine testP0 512 WSP-26-1187, , measured with LMS-2

CLinked

Customer #1520 calls it ONS 4711, Wattaris calls it S 26-0472: a KS 630 with transformer 26-1187.

Who?

Customers, contacts, teams

  • Customer #1520Grid operator, organisation with a framework agreement since 2025
  • K-1520-3Network supervisor, person
  • OE-PFTest bay

CRMoperated by customer #1520

What kind?

Series and BOMs

  • KS 630Compact substation, non-walk-in
  • AT 630/20Transformer, Dyn5, ONAN
  • RS 24Switchgear, SF6-free

ERP, DMSis a KS 630

Where?

Sites and grids

  • ONS 4711“Am Sportplatz”, #1520’s network area
  • MV ring 7between ONS 4710 and ONS 4712

CRM, E-CADsits on ring 7

What’s going on?

Field jobs and tests

  • IBN-26-0472Commissioning on 19 Nov 2026
  • SP-26-1187Routine test of the transformer

Service planning, test bay systemjob at this substation

Which one exactly?

ONS 4711 = S 26-0472

The substation in the customer’s grid, in service since 19 Nov 2026

  • Two numbers, one thing. demi knows both.
  • ONS 4711 is the grid operator’s number, S 26-0472 the one in the ERP.

ERP, CRMbuilt under order 26-0561

What applies?

Contracts, opportunities, quotes

  • RV-2025-17Framework agreement, call-off 9
  • WV-1520-03Maintenance contract
  • CH-26-0352Opportunity: follow-on contract 2028
  • #26-0904Quote for tender V-26-117

CRM, ERPcontract for this substation

What’s in writing?

Diagrams, reports, emails

  • ÜS-26-0561-01Single-line diagram, Rev. B
  • TP-23-044Type test report, internal arc
  • Mail #5174Network supervisor asks about K2

E-CAD, DMS, mailboxesabout this substation

What should it be?

Requirements

  • TL-1520Rev. 7, 8.4.2: instrument within its calibration interval on the test day
  • Tier 2P0 ≤ 540 W, Pk ≤ 4,600 W

DMSrequirement for this substation

What do we make of it?

Findings

  • F-26-112Calibrate LMS-2 before call-off 10, or the test bay stands still

demifinding on the instrument that tests its transformer

At the pump maker, the pump with its serial number sits in the middle; at the machine builder, the line at the customer’s site; at the space supplier, the flight unit in orbit. At Wattaris, it is the substation in the customer’s grid. The layout stays, the middle changes.

DWhat it can do

  • Recognise

    ONS 4711 at the grid operator, S 26-0472 in the ERP and “Sportplatz” in the service report are the same substation.

  • Unify

    Load losses in W, kW or per cent become one value in watts, referred to 75 °C.

  • Trace

    Every value shows its source, exact location and version. Unclear rows are kept too.

  • Look back

    The substation as delivered, revision B, not as quoted.

  • Write back

    After approval, the new calibration certificate lands in the CAQ system and the maintenance in service planning.

2Rights

The org chart becomes the permission system

Only the quotes & tenders team sees margins in the ERP, and only that team sees them in demi. And a grid operator sees its own substations, diagrams and test reports in the portal, never anyone else’s.

Senftenberg plant: 410 people, eight departments

ONS 4711 passed through the departments in turn: call-off 9 in sales, the diagram in engineering, the transformer and switchgear from production, the routine test in the test bay, commissioning by service on 19 Nov 2026.

Management and staff functions 26Management 2 · Finance and controlling 9 · HR 5 · IT 6 · Assistants 4
  • 1Sales 32
    • Grid operators & utilities 12
    • Wind & solar 6
    • Quotes & tenders 9
    • Inside sales 5
  • 2Engineering 44
    • Substations 14
    • Transformers 12
    • E-CAD & diagrams 10
    • Technical docs 8
  • 3Purchasing and logistics 24
    • Purchasing 10
    • Stores 8
    • Shipping & loading 6
  • 4Production 214
    • Transformers 92
    • Switchgear & LV 64
    • Substation assembly 58
  • 5Test bay 14
    • Test engineers 4
    • Test technicians 8
    • Metrology 2
  • 6Service 44
    • Installation & commissioning 20
    • Maintenance 12
    • Spare parts 6
    • Hotline 6
  • ·Quality and environment 12
    • Quality management 5
    • Environment & safety 3
    • Certificates & type tests 4

26 + 32 + 44 + 24 + 214 + 14 + 44 + 12 = 410 people

Who opens which room

WhoSubstations in the gridDiagrams & docsQuotes & pricesCosting & marginsTest bay & reportsHRApproves
Sales, grid operatorsown customersreadsown customers–reads–Technical content of the quote
Quotes & tendersreadsreadseditseditsreads–Quote, price
Engineeringreadseditsreads–reads–Diagram, deviation
Test bay–reads––edits–Test report, instrument
Service & commissioningeditsreadsreads–reads–Spare-part quote, maintenance
HR–––––edits–
Grid operator #1520 in the portalownown diagramsown–own reports–Acceptance in the test bay
Deadline agent, AI coworkerreadsreads––reads–Never
Tender agent, on someone’s behalfAs much as the person who starts it. No more.Never

Every room has keys. They come from your systems and never multiply on their own.

Only the quotes & tenders team opens the costing & margins room, price adjustment clause for copper and core steel included. In sales, the team for grid operators and utilities sees the quotes and prices for those accounts, not the ones for wind and solar farms.

An agent carries the keys of the person it works for. An AI coworker has its own, and always a person who is accountable for it. Every access is in the log.

The roadmap

Next up: purchasing, the winding shop and substation assembly

The four steps shown dashed in the band above. Each one builds on data demi already knows.

  1. Purchasing and suppliers

    Copper, core steel, transformer oil and vacuum interrupters: prices, delivery dates and successor parts per call-off. Purchasing sees which framework agreement draws which quantity before the purchase order goes out.

    O7
  2. Production planning and winding

    Winding data, drying and oil filling per serial number go into the record. Planning sequences the transformers of a call-off so that the test bay can test them at a steady pace.

    O8S1
  3. Switchgear and substation assembly

    The substation as built: torque values, photos and final assembly checks per serial number. Then service knows every bolt before it opens the door.

    S2

3Intelligence

Five agents do the work, people approve

  1. Substation agent

    AI coworker, accountable: head of service

    TriggerA question with a substation number or serial number
    ReadsERP deliveries, single-line diagrams, as-built BOMs, field jobs
    DoesLinks the grid operator’s substation number to the serial number and keeps the file on each substation. Finds, say, every RS 24 from 2019 to 2021 with the old fault passage indicator
    ApprovalService confirms gaps
  2. Deadline agent

    AI coworker, accountable: head of test bay

    TriggerEvery morning at 6:00 and with every new deadline
    ReadsInstruments and calibration certificates in the CAQ system, test bay schedule, technical specifications, maintenance contracts
    DoesFlags every deadline at least six weeks ahead, lists the tests and call-offs that depend on it and drafts the appointment request
    ApprovalHead of test bay, service
  3. Spare-parts agent

    AI coworker, accountable: head of service

    TriggerEmail with a nameplate photo in the service inbox
    ReadsSubstation file, as-built BOM, stock, successor parts, terms
    DoesReads the serial number and year of manufacture from the plate, finds the variant and the successor part, even for switchgear from 1998, and drafts the quote
    ApprovalService, spare parts
  4. Tender agent

    Works for the person who starts it

    TriggerSomeone from quotes & tenders starts it on a tender
    ReadsTechnical specification, data sheets, type test reports, certificates, earlier deviation lists
    DoesChecks every requirement. For V-26-117: 412 requirements, 371 met, 29 with a deviation, 12 open for engineering
    ApprovalHead of quotes. Management decides whether to bid
  5. Manual agent

    AI coworker, accountable: technical documentation

    TriggerA question from a mobile phone, at the substation or in the solar park
    ReadsThe operating manual for exactly this variant, service bulletins, the substation’s diagram
    DoesAnswers with page and image, for example how to set the fault passage indicator in K2 to 400 A
    ApprovalTechnical documentation checks every new answer

Every price in a quote is the one Wattaris’ own costing in the ERP produces; for a transformer, it includes the price adjustment clause for copper and core steel. Switching at a substation is done only by a qualified electrician holding the grid operator’s switching authorisation.

Calculations run on Wattaris’ own rules and data, not in the language model. Anything that goes out or is written back to a system is approved by a person.

Sources

Why data first, then rights, then AI

60%

Through 2026, Gartner expects organisations to abandon 60% of AI projects that lack AI-ready data.

Gartner · 2025 · Forecast · on step 1, dataOpen the source (opens in a new tab)
Least privilege

Share sensitive data in LLM apps on a least-privilege basis only, meaning just what a user or process needs.

OWASP GenAI Security Project · 2025 · on step 2, rightsOpen the source (opens in a new tab)
70%

70% of AI’s potential value sits in core functions such as sales, manufacturing and supply chain.

Boston Consulting Group · 2025 · on step 3, intelligenceOpen the source (opens in a new tab)
WattarisEnergy · Senftenberg plantExample company

Wattaris doesn’t exist. Your company does.

In 20 minutes we show you demi on a case like yours: bring the data together, set the rights, let AI do the work.

Wattaris Energie SE is made up: a typical group in Energy & Utilities, not a real one. An estimate from our assumptions, not a promise. You can change every number in the configurator.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases