Who?
Customers, contacts, teams
Customer #3115Constellation operator, an organisation with the relation “customer since 2019”K-3115-4Integration lead, a personOE-PA-EEEProduct Assurance, EEE parts
ERPoperated by customer #3115
Rennhardt Aerospace UK Limited · Bristol·, since 1936·, 14,000 people·, 15 locations in 15 countries
Getting started with AI · Aerospace
Rennhardt Aerospace doesn’t exist. Everything else on this page will feel familiar.
demi turns your systems into one record, carries over your rights and lets AI agents prepare the routine work. First the data, then the rights, then the AI. A person always approves.
In orbitSAT-114540 km, 97.5°, sun-synchronous
Customer #3115
LCL board B, one of four in this unit
Tantalum chip capacitor C214, batch 2433-117
Manufacturer notice, Tuesday 9:10The problem
A manufacturer reports: tantalum chip capacitors from a later lot failed surge current screening, and date code 2433 is under suspicion too. Rennhardt Aerospace bought 1,100 pieces with this date code, batch 2433-117.
Three customers want to know by tomorrow morning whether their satellites are affected. Nine units with this lot are already flying. No single source knows which satellites have the lot on board:
In the ERPBatch 2433-117. Serial numbers are booked as batches there, and there is no as-built list.
In Excel23 as-built lists, one per unit, kept up to date by one colleague.
In the mailboxWhich satellite carries which unit is written in the customers’ emails.
A trace normally takes two hours. This one takes two days, because the lot sits in 23 units.
| ERP, goods receipt 11/2024 | Batch 2433-117 |
|---|---|
| CoC-24-3381, page 1 | Lot 117, D/C 2433 |
| ABCL-0043.xlsx, row 214 | DC2433 |
Together that is 3,080 hours a year, about 1.8 full-time roles. And many EEE parts have lead times of 26 to 52 weeks: put a lot on hold and you may wait up to a year for replacements.
212 documents per unit from eight sources. One wrong date code stops the delivery.
The NRB meets on Wednesdays. Until then, whatever is on hold stands still.
The verification matrix lives in exports and spreadsheets, updated by hand before every review.
What demi does · An example
T+0:00
demi reads email #5512 and the PDF: part, manufacturer, date code 2433. Rennhardt Aerospace bought exactly this lot, batch 2433-117, 1,100 pieces.
T+0:02
180 pieces are still in stock. demi proposes putting them on hold.
T+0:05
920 pieces are fitted, on 64 LCL boards in 23 units. demi reads this from 23 as-built lists, including where DC2433 is written without a space.
T+0:08
Nine units are flying, six are built into satellites at the customer, eight are still at Rennhardt Aerospace. For the 15 with customers, demi names the satellite and the customer.
T+0:41
Product Assurance checks the list, puts the batch on hold, opens NCR-26-0187 and approves three customer notices, each showing only that customer’s own units.
T+0:55
Three customers have their answer before noon. Approvals and every access are in the log.
This time the lot sits in 23 units; normally it is one or two. In that case the search takes two hours, and according to the calculation below, demi saves just under 29 minutes of that per trace.
From lot to orbit.
Aircraft builders found a workshop for fuselage parts and fittings in Bremen, Germany. The group grows out of it.
The Neumarkt plant in Bavaria adds space: precision parts and fixtures, soon the first flight parts for satellite structures and the first clean room.
Rennhardt Aerospace builds complete units at the Neumarkt plant: power distribution units, hold-down mechanisms, harnesses. One-offs turn into series production. The group lists on the stock exchange, with plants in several countries.
The group builds aerostructures and space systems. About 1,400 units from the Neumarkt plant are flying, each carrying its file with it, from the component lot into orbit.
The payoff
| Start | Use case | Volume per month | Share | Today per year | Freed up | Value per year |
|---|---|---|---|---|---|---|
| 1 | Trace batches and serial numbers | 10 × 2 h | 40% | 240 h | 58 h | €3,770 |
| 2 | Check material certificates against the order | 400 × 10 min | 50% | 800 h | 240 h | €15,600 |
| 3 | Spot component discontinuations early | 30 × 90 min | 40% | 540 h | 130 h | €8,450 |
| 4 | Trace requirements to the test evidence | 200 × 15 min | 30% | 600 h | 108 h | €7,020 |
| 5 | Compile the production file per lot | 100 × 45 min | 40% | 900 h | 216 h | €14,040 |
| Total | 3,080 h | 752 h | €48,880 |
Of 3,080 hours, we count 752: volume times time times twelve months, then only the cautious share of that, times 0.6 for partly digital processes. That is about 0.4 full-time roles. Calculated at €65 per hour: €49.50 labour cost in manufacturing according to Destatis, plus workplace, IT and overheads. Not counted: a delivery date that holds. A number doesn’t fit your company? You can change every one of them in the configurator.
Office Floor <=> Clean Room
demi can work at all 14 stations. Pick a use case and see which ones it touches.
The start
| The first 90 days | Day 1 | Week 1 | Weeks 2 to 4 | Months 2 and 3 |
|---|---|---|---|---|
| Systems | ||||
| Mailboxes | EEE parts mailbox, read-only | |||
| Programme mailboxes | Read-only, separated by customer | |||
| ERP, spreadsheets, file share | Read-only, via a small connector in their own network | |||
| CAQ, PLM | Read-only | |||
| Goods receipt mailbox | Read-only, certificates and CoCs | |||
| Requirements, test data | Read-only | |||
| Use cases | ||||
| 1 Traceability | With approval. Part of daily work from day 30 | |||
| 2 Certificates | With approval | |||
| 3 Discontinuations | With approval | |||
| 4 Requirements | With approval | |||
| 5 Production file | With approval | |||
| Writing back | ||||
| Hold and NCR into the ERP and the CAQ | After approval | |||
Ten traces a month is not many, but a single suspect lot can stop a delivery. Each trace adds to the family tree: which lot sits on which board, in which unit and on which satellite. Most of the hours go into the certificates and production files. Those cases come later, because every certificate and every file is tied to a lot in the family tree.
1 Data
An excerpt from Rennhardt Aerospace’s record.
Nothing gets replaced. Running a different ERP? demi connects to everything, from SAP and Oracle to the specialist software from the next town. At first, demi only reads. A person connects a system after seeing who will read what.
| In orbit | |
|---|---|
| SAT-114, 540 km, 97.5° | Mailboxes, integration report from customer #3115 |
| Customer #3115 | ERP, customer master data |
| Unit | |
| RA-PDU-28-0043 | ERP, booked as a batch |
| Flight model FM3 | File share, delivery note LS-25-0874 |
| PDU-28 | PLM, bill of materials rev. C |
| 28 V, 12 LCL up to 5 A | PLM, PDU-28 datasheet, page 3 |
| 3.9 kg | PLM, PDU-28 datasheet, page 1 |
| Assembly | |
| LB-0043-2, LCL board B | Spreadsheets, ABCL-0043.xlsx, row 38 |
| Component lot | |
| DC 2433 | Spreadsheets, ABCL-0043.xlsx, row 214 |
| Batch 2433-117 | ERP, goods receipt 11/2024 |
| CoC-24-3381 | File share, delivery from manufacturer #L-118 |
Customer #3115 operates the satellite SAT-114, with the unit RA-PDU-28-0043 on board, a PDU-28 as flight model FM3.
Who?
Customer #3115Constellation operator, an organisation with the relation “customer since 2019”K-3115-4Integration lead, a personOE-PA-EEEProduct Assurance, EEE partsERPoperated by customer #3115
What kind?
PDU-28Power distribution unit, 28 V, 12 LCLSTL-PDU28-CBill of materials rev. CTC-47-25Tantalum chip capacitor 47 μF, 25 V, on the 12 V auxiliary railPLM, ERPis a PDU-28
Where?
SAT-114Satellite, 540 km, sun-synchronousRR-2Clean room 2 in Neumarkt, ISO 7Mailboxesflying on SAT-114 since March 2026
What is running?
FA-25-0442Production orderTV-25-0311Thermal vacuum, four cyclesERP, test databuilt and tested in 2025
Which one exactly?
RA-PDU-28-0043
ERP, spreadsheetsunit with a serial number
What applies?
V-3115-03Supply contract, 24 FM and 2 FSRFW-0087Waiver for 20 unitsB-24-0912Purchase order to manufacturer #L-118ERP, CAQdelivered under V-3115-03
What is written down?
Email #5512The manufacturer’s noticeABCL-0043As-built listEIDP-0043Data package, 212 documentsMailboxes, spreadsheets, file sharedescribes this unit
What should it be?
REQ-PDU-063Current per output up to 5 ADRL-3115The customer’s document listRequirementsREQ-PDU-063 applies here
What do we conclude?
F-26-058Batch 2433-117 fitted, unit is flyingdemifinding on this unit
At the pump maker, the pump with its serial number sits in the middle; at the machine builder, the line at the customer’s site; at the logistics company, the shipment. At Rennhardt Aerospace, it is the flight unit in orbit. The grid stays, the middle changes.
Batch 2433-117, Lot 117 and DC2433 are one lot. RA-PDU-28-0043 is the same unit in the ERP, in Excel and in the customer’s email.
Date codes, batches and serial numbers get one format. Every old spelling is kept as a source.
Every value shows its source, exact location and version. Unclear rows are kept too.
The unit as it was built, not as the bill of materials looks today.
After approval, the hold and the NCR land in the ERP and the CAQ.
2 Rights
What a customer writes about its satellite is never seen by a team that works for another customer.
Programmes, development and supply chain
Hardware and quality
22 + 24 + 78 + 14 + 22 + 106 + 26 + 40 + 8 = 340 people
| Who | Units and as-built | Engineering | Customer programmes | Prices and margins | NCR and NRB | Controlled data | HR | Approves |
|---|---|---|---|---|---|---|---|---|
| Programme management | own programme | reads | own programme | own programme | reads | – | – | Customer notice, delivery |
| Development | reads | edits | own programme | – | reads | after clearance | – | Drawing, bill of materials |
| Configuration and docs | edits | reads | own programme | – | reads | after clearance | – | Configuration baseline, as-built list |
| Purchasing and supply chain | reads | reads | – | – | reads | – | – | Purchase order |
| Product Assurance | edits | reads | reads | – | edits | after clearance | – | Hold, NCR, customer notice, data package |
| Legal and export control | reads | reads | reads | – | – | edits | – | Export approval |
| HR | – | – | – | – | – | – | edits | – |
| Customer #3115 in the portal | own | own | own | – | own | – | – | Waiver |
| Traceability agent, AI coworker | reads | reads | assignment only | – | reads | – | – | Never |
| Data package agent, acting for a person | As much as the person who starts it. No more. | Never | ||||||
Every room has keys. They come from your systems and never multiply on their own.
Controlled data is seen only by those whom export control has cleared. That applies to people and to every agent.
An agent carries the keys of the person it works for. An AI coworker has its own, and always a person who is accountable for it. Every access is in the log.
3 Intelligence
AI coworker, accountable: head of Product Assurance
AI coworker, accountable: head of Product Assurance
AI coworker, accountable: head of purchasing
Works for the person who starts it
Works for the person who starts it
demi checks limits and radiation hardness against Rennhardt Aerospace’s versioned lists.
Calculations run on Rennhardt Aerospace’s own rules and data, not in the language model. Anything that goes out or is written back to a system is approved by a person.
The roadmap
RFW-0087 allows a known deviation for 20 units. Unit 21 shows it too: before acceptance, demi sees that it is no longer covered and drafts the new request to the customer.
The thermal vacuum chamber is booked for weeks. demi matches the test slots against delivery dates and milestones and warns early when a test will push back acceptance.
When a customer reports something unusual in the telemetry, the unit’s as-built list, test curves and NCRs are ready in minutes.
Sources
Gartner expects that by the end of 2026, companies will abandon 60% of AI projects that lack AI-ready data.
Gartner · 2025 · on step 1, dataOpen the source (opens in a new tab)Share sensitive data in LLM apps only on a least-privilege basis: only what the user or the process needs.
OWASP GenAI Security Project · 2025 · on step 2, rightsOpen the source (opens in a new tab)70% of AI’s potential lies in core functions such as sales, production and the supply chain.
Boston Consulting Group · 2025 · on step 3, intelligenceOpen the source (opens in a new tab)In 20 minutes we show you demi on a case like yours: bring the data together, set the rights, let AI do the work.
Rennhardt Aerospace SE (Germany) is made up: a typical group in aerospace, not a real company. An estimate from our assumptions, not a promise. You can change every number in the configurator.