Component makers send change and end-of-life notices that are read late or not at all. What follows is a line stop or a redesign under time pressure.
An example
Wallner+Hardt Sensortechnik receives a discontinuation notice for a microcontroller. demi finds it on 3 boards, in the WS-410 pressure sensor (IO-Link, 0–10 bar) and the ST-220 controller, and in about 1,200 units in the field. The agent calculates a last-time buy that covers service for the contracted years.
Your data, wherever it lives
Today discontinuation and change notices arrive as PDFs by e-mail or sit in supplier portals, BOMs and where-used lists in the PLM, stock, open orders and demand in the ERP, and units in the field in a service spreadsheet. demi reads, understands and links them per manufacturer part number, with your rights. For every notice the AI finds all affected BOMs, orders and units in minutes and calculates the remaining demand, instead of the notice going unread, and management decides on the last-time buy.
Where the data lives today
- PDFs
- E-mails
- Web & portals
- PLM
- ERP
- Office files
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
The case needs data from the ERP, PLM, e-mail and supplier portals. demi replaces nothing and links every notice to BOMs, where-used lists, open orders, stock, demand forecasts and the installed base. demi writes a last-time buy into the ERP only after approval.
- 2 · PermitPermission Layer
Purchasing and engineering see the risk list. Management decides on a last-time buy, the final order before the part disappears, and that approval is recorded.
- 3 · ActIntelligence Layer
The agent matches each notice by exact manufacturer part number and ranks risk by usage and stock coverage. It calculates the last-time-buy quantity from recorded demand including service, step by step with sources, and proposes successors for review.
How it runs
- 1
Collect notices from e-mail and supplier portals
- 2
Find affected BOMs, products and installed units by manufacturer part number
- 3
Rank the risk and calculate remaining demand, service included
- 4
Propose possible successors for review, with every data-sheet difference
- 5
Approve a last-time buy or a redesign and set it in motion
What changes
Discontinuations seen while there is still time
Planned last-time buys instead of panic orders
Redesigns started in time
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+216 hfreed per year
Assumptions and calculation
demi shows the affected bills of materials, orders and remaining demand for each notice; you decide.
90 min → 54 min per case
How we calculate
30 discontinuation notices × 90 min × 40% × 1.0 (manual) × 12 months = 12,960 min = 216 h
Value per year, before demi costs
Freed per year+216 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€14,040
gained per year
216 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Where do the discontinuation notices come from?
From the channels they already arrive through: e-mails to purchasing or engineering, supplier portals and documents on file shares. demi reads them there and maps them to parts. You do not need a new process with every supplier.
How is the last-time-buy quantity calculated?
From data you already record: open orders, forecasts, stock and spare-part demand of the installed base. The agent shows the calculation step by step with every input. The quantity is a proposal; you decide.
Does it take service obligations into account?
Yes, if the promised service periods are in contracts or the ERP. demi links them to the delivered units and adds the spare-part demand up to the end of the commitment.
What if there is no suitable successor?
demi says so plainly and lists the affected products for a redesign. Possible alternatives go to engineering for review, with every data-sheet difference listed.