Skip to content
Ebert & LorenzMachine buildingExample company

Ebert & Lorenz Maschinenbau GmbH & Co. KG · Villingen-Schwenningen (Germany), family-owned, since 1971, 4,200 people, 8 sites in 8 countries

Getting started with AI · Machinery & Plant Engineering

How a machine builder gets started with AI

Ebert & Lorenz doesn’t exist. Everything else on this page will feel familiar.

demi turns your systems into one record, carries over your rights and lets AI agents prepare the routine work. First the data, then the rights, then the AI. A person always approves.

What five use cases free up in one business unit

+1,183 h per yearEstimate, not a promise≈ €76,895 per year, calculated cautiously
Layout plan of line 23-077, top view: six stations OP10 to OP60 on a workpiece carrier loop, a safety fence with two doors, two light curtains at the operator stations in front of the fence, the control cabinet behind the line. Overall size 14,400 by 5,200 millimetres.+S1 control cabinetLight curtainOP10Load, measureOP20Fit gearHP-400OP30Fit bearingHP-100OP40Retaining ringOP50TestOP60MarkLoading stationUnloading station1440052002200

Station list

Stations of line 23-077
OP10Load, measure shaftMeasuring station
OP20Press-fit gearAssembly press HP-400
OP30Press-fit bearingAssembly press HP-100
OP40Fit retaining ringRobot
OP50TestEnd-of-line test rig
OP60Mark, unloadLaser
Cycle time
18 s
Output
200 shafts/h
PLC version
2.4.1
Ebert & Lorenz
TitleAssembly line MZ-6, shaft W-40
Customer#2207, Plant 2
Drawing no.23-077-000-001
Rev.C
Scale1:50
The layout plan of line 23-077, running at customer #2207 since 2024. Every value leads to its source.
Ebert & LorenzMachine buildingExample company

World leader in press-fit joining. Family-owned since 1971.

4,200 people build press-fit and assembly lines to spec, around 14,000 run worldwide

From clockmaking town to world leader

  1. Werner Ebert, a toolmaker from the clock industry, and Rudolf Lorenz, a master electrician at a Schwenningen clock factory, start a business together. Ebert builds the fixtures and Lorenz the controls the clock factories use to assemble their movements.

  2. The quartz watch arrives and the clock factories shrink. Ebert & Lorenz switches to automatic assembly machines, and its new customers are car-parts suppliers between the Black Forest and the Swabian Jura.

  3. The first assembly press with force-displacement monitoring. It grows into the HP series, to this day the heart of almost every line.

  4. The first plant abroad, in Shanghai, close to the customers. Plants in Poznań and Brno follow, plus sales and service in Chicago, Lyon, Modena and Dubai.

  5. The founders have handed over to the next generation: Katrin Ebert and Jonas Lorenz run the group. With the servo-electric HP series, Ebert & Lorenz is the world market leader in press-fit and assembly lines for makers of e-drives and sensors, each line built to a customer’s requirement specification.

Profile

Founded
1971 in Schwenningen am Neckar, by Werner Ebert and Rudolf Lorenz. Still owned by both families
People
4,200 in the group, 3,150 of them at the main plant. 420 in the assembly-line business this page is about, every one of its departments in the org chart
Market position
World market leader in servo-electric press-fit and assembly lines for e-drive and sensor production
Sites
Main plant in Villingen-Schwenningen with engineering, parts manufacturing and six assembly halls. Plants in Shanghai, Poznań and Brno; sales and service in Chicago, Lyon, Modena and Dubai
Customers
E-drives and e-mobility 45%, sensors and electronics 25%, industrial goods 15%, medical technology 5%, other 10%
Export
Customers in 48 countries, 74% of revenue outside Germany
Revenue
€880 million (group)
In the field
Around 14,000 presses, machines and lines
Per month
In the main plant’s assembly-line business: around 110 inquiries, 80 quotes, 8 to 10 new jobs
Systems
ERP, CRM, PDM, E-CAD, PLC archive, job files, mailboxes

Locations

  • Villingen-SchwenningenGermany · Headquarters and main plantEbert & Lorenz Maschinenbau GmbH & Co. KG
  • ShanghaiChina · Plant and salesEbert & Lorenz (Shanghai) Co., Ltd.
  • PoznańPoland · PlantEbert & Lorenz Polska Sp. z o.o.
  • BrnoCzechia · PlantEbert & Lorenz CZ, s.r.o.
  • ChicagoUnited States · Sales and serviceEbert & Lorenz USA, LLC
  • LyonFrance · SalesEbert & Lorenz France SAS
  • ModenaItaly · SalesEbert & Lorenz Italia S.r.l.
  • DubaiUnited Arab Emirates · SalesEbert & Lorenz Middle East FZE

This page calculates the five use cases and every figure for one business unit: assembly lines at the main plant in Villingen-Schwenningen.

Four product lines

  • HPAssembly presses100 to 800 kN
  • MZAssembly cells and linesCycle time from 6 s
  • SMSpecial machines and test rigsOne-offs
  • RZRobot cellswith safety fencing and machine vision

The problem

Monday, 7:15 am: customer #2207 wants line 23-077 again, only faster

The purchasing team of a drive manufacturer writes to Ebert & Lorenz’s sales team. They need a second line like 23-077, for the new shaft W-48 with a second gear, at a cycle time of 16 instead of 18 seconds. Quote due by 27 November.

The requirement specification runs to 240 pages. Everyone here knows line 23-077. What it really cost and what was changed afterwards are spread across three places:

In the ERPThe 2023 quote, costed at 2,950 assembly hours.

In the job files14 changes after the factory acceptance test and an acceptance report with a three-week delay.

In one person’s headThe project manager from back then is commissioning a line in Mexico until the end of the month.

Three engineers search for three hours each. The quote goes out on day 9, at the 2023 price, which wasn’t enough even back then.

FromPurchasing, customer #2207
ToEbert & Lorenz sales
SubjectSecond line like 23-077, cycle time 16 s, quote by 27 Nov
Mail #6208Good morning, we need a second line like 23-077, for shaft W-48 and with a 16-second cycle time. Requirement specification attached. Please send your quote by 27 November.

LH-2207-W48.pdf240 pages

What happens every month in the assembly-line business

  1. 80quotes
  2. 40design changes
  3. 100part searches
  4. 300questions about a machine
  5. 250spare-part requests

Together that is 6,040 hours a year, about 3.4 full-time roles. Many of the people who commission a line on their own at a customer’s site are PLC and robot programmers from engineering, where 17 of the 112 reach retirement age by 2030.

What hurts there

  1. 01
    Project knowledge seeps away

    Line 23-077, the changes that followed, the job costing: it’s all there, but spread across the ERP, PDM and job folders. The next similar quote still starts from zero.

  2. 02
    Feasibility questions block sales

    “Can OP20 manage 16 seconds too? Can the second gear be press-fitted?” An experienced engineer knows the answer, and right now that engineer is at a line on a customer’s site.

  3. 03
    Knowledge retires with your experts

    Thirty years of press-fitting and testing know-how rest with a few individuals. When they leave, the knowledge leaves with them.

What demi does · An example

The quote is ready on day 4, not 9, costed on actuals

  1. The inquiry

    demi reads the email and the requirement specification: 240 pages, 612 requirements. Cycle time 16 seconds, shaft W-48 with a second gear.

    Mail #6208LH-2207-W48
  2. The predecessors

    Three similar jobs, found by stations, cycle time and part family. The closest is 23-077, the same line at the same customer.

    23-07722-04124-018
  3. What was really built

    The as-built BOM, revision C: 14 changes after the factory acceptance test. The customer runs PLC version 2.4.1.

    STL-23-077-CÄM-23-077-14
  4. Planned versus actual

    Assembly costed at 2,950 hours, actual 3,420. Commissioning at OP20 took three weeks longer.

    NK-23-077SAT-23-077
  5. The draft

    Costing and scope of supply, every line item with its source job. New: station OP25 for the second gear. The 23 requirements that 23-077 doesn’t meet are at the top, starting with the cycle time: 17.6 s at factory acceptance, 16 s required.

    Quote #26-0846
  6. The sign-off

    Engineering confirms that OP20 can manage 16 s. The sales engineer and costing change two items and approve. The quote goes out on day 4.

    A person approvesLog

The three engineers only spend nine hours searching when a whole line like 23-077 is on the table. The day-to-day business is quotes for single presses and cells, and in the calculation below each of them gives the engineers 32 minutes back.

Office Floor <=> Assembly Floor

Where demi works at Ebert & Lorenz: seven of 14 stations

demi can work at all 14 stations. Pick a use case and see which ones it touches.

Office Floor

  1. O1Market & leads next
  2. O2Inquiry1next
  3. O3Requirements & specs1next
  4. O4Quote & costing1 5next
  5. O5Order & project next
  6. O6Engineering & PLC2 3next
  7. O7Purchasing & suppliers2next
One record. Every fact runs both ways.

Assembly Floor

  1. S4Goods in, warehouse & shipping next
  2. S5Service & spare parts4 5next
  3. S6Machines at customers4next
  • demi works here
  • Next at Ebert & Lorenz
  • demi can work here too
  • Path of inquiry A-26-1162: via line 23-077 at the customer and back into the quote

The payoff

Example calculation for the assembly-line business: five use cases free up 1,183 hours a year

≈ €76,895 per yearEstimate, not a promise
StartUse caseVolume per monthShareToday per yearFreed upValue per year
1Build quotes from similar past ordersSales80 × 3 h30%2,880 h518 h€33,670
2See what a design change affectsEngineering40 × 2 h30%960 h173 h€11,245
3Find existing parts instead of designing newEngineering100 × 30 min30%600 h108 h€7,020
4Find your installed base by serial numberService300 × 10 min40%600 h144 h€9,360
5Spare-part quote from a nameplate photoService250 × 20 min40%1,000 h240 h€15,600
Total6,040 h1,183 h€76,895

Of 6,040 hours, we count 1,183: volume times time times twelve months, then only the cautious share of that, times 0.6 for partly digital processes. That is about 0.7 full-time roles. Calculated at €65 per hour: €49.50 labour cost in manufacturing according to Destatis, plus workplace, IT and overheads. A number doesn’t fit your company? You can change every one of them in the configurator.

The start

How Ebert & Lorenz starts: quotes first, then engineering

Which systems and use cases join in the first 90 days
The first 90 daysDay 1Week 1Weeks 2 to 4Months 2 and 3
Systems
Mailboxes, job filesSales and service mailboxes, job folders, read-only
ERP, PDMRead-only, via a small connector in their own network
CRM, E-CADRead-only
PLC archiveRead-only
Use cases
1 QuotesWith sign-off. Part of daily work from day 30
2 Design changeWith sign-off
3 Existing partsWith sign-off
4 Installed baseWith sign-off
5 Spare-part quoteWith sign-off
Writing back
Into the ERPAfter sign-off

Why quotes first

They are the biggest item, 518 hours a year. They only need read access: mailbox and job files from day 1, ERP and PDM from week 1. Everyone already knows every line by its job number. And every draft stays in-house until sales and costing approve it. Engineering follows in week 2, once demi knows the as-built BOMs.

The entry plan for your company

What Ebert & Lorenz does itself

  • Head of ITTwo days for the connections
  • Head of quotes & costingOne hour a week
  • CostingTwo weeks of reviewing drafts, alongside normal work

1 Data

Seven systems become one record

1,273entries
1,385links
7systems

An excerpt from Ebert & Lorenz’s record.

Connected

  • ERP
    Jobs, quotes, BOMs per job, purchase orders, job costing, service callsA job is an order. The line at the customer has no home here
  • CRM
    Customers, contacts, opportunitiesThe same customer as a group, as a plant and as a purchasing company
  • PDM
    3D models, drawings, engineering BOMs, changesReleases go by email, part numbers differ from the ERP
  • E-CAD
    Circuit diagrams, cabinet layouts, terminal diagramsThe electrical BOM is retyped into the ERP
  • PLC archive
    PLC and robot programs, parameters per machineThe customer’s version comes back on a USB stick
  • Job files
    Requirement specs, functional specs, acceptance reports, CE technical files, manualsFive copies of “final_v3” per job
  • Mailboxes
    Inquiries, drawings, change requestsThat’s where the real decisions are

Nothing gets replaced. Running a different ERP? demi connects to everything, from SAP and Oracle to the specialist software from the next town. At first, demi only reads. A person connects a system after seeing who will read what.

Held together

The same line. Seven systems. Now one entry.
Job 23-077ERP
Customer #2207, Plant 2, Hall 3CRM
Drawing 23-077-000-001PDM
Revision CPDM, 14 change notices
Cycle time 18 sJob files, LH-2207-W40, page 12
PL d, Cat. 3Job files, CE technical file 23-077
PLC version 2.4.1PLC archive, backup from the customer
Control cabinet +S1E-CAD
Assembly 3,420 hERP, job costing NK-23-077
Inquiry A-26-1162Mailboxes, Mail #6208
Target, requirement specCycle time 18 sLH-2207-W40, page 12
Actual, factory acceptanceCycle time 17.6 sFAT-23-077, measurement series 3

Linked

Customer #2207 runs line 23-077, an MZ-6 with assembly press HP-400, in Hall 3 of its plant.

Who?

Customers, contacts, teams

  • Customer #2207Drive manufacturer, organisation with the relationship “customer since 2016”
  • K-2207-4Buyer, person
  • OE-VT-AKQuotes & costing

CRMrun by customer #2207

What kind?

Series and BOMs

  • MZ-6Assembly line, six stations
  • HP-400Assembly press at OP20
  • STL-23-077-CAs-built BOM
  • 300-4410Bracket, used in 14 machines

PDM, ERPis an MZ-6 with HP-400

Where?

Sites and halls

  • ST-2207-02The customer’s Plant 2
  • H3-L4Hall 3, line bay 4

CRMin Hall 3 since 2024

What’s happening?

Service calls and tickets

  • T-26-0388Service case: press force at OP20
  • SAT-23-077Site acceptance at the customer

ERPservice call on this line

Which one exactly?

Job 23-077

The line at the customer, accepted in 2024

  • SN 24-0142Serial number on the nameplate
  • Running at customer #2207, now the template for the faster second line.

ERPbuilt to job

What applies?

Opportunities, quotes, contracts

  • CH-26-0219Opportunity: second line
  • #26-0846Quote for inquiry A-26-1162
  • #23-0112Quote from 2023
  • WV-2207-01Maintenance contract

CRM, ERPquote for this line

What’s in writing?

Emails, reports, programs

  • Mail #6208Inquiry with requirement specification
  • FAT-23-077Factory acceptance test
  • ÄM-23-077-14Change 14 of 14
  • PLC 2.4.1Program version at the customer

Mailboxes, files, PLC archiveis about this line

What should it be?

Requirements

  • LH-2207-W40Requirement specification from 2023
  • LH-2207-W48Requirement 4.2.7: 16 s at most

Job filesrequirement for its successor

What do we conclude?

Findings

  • F-26-031OP20 reworked, three extra weeks of commissioning

demifinding about this line

At the pump maker, the pump with its serial number sits in the middle; at the logistics company, the shipment; at the space supplier, the flight unit in orbit. At Ebert & Lorenz, it is the line at the customer’s site. The grid stays, the middle changes.

What it can do

  • Recognise

    Job 23-077, “Line 4” at the customer and the folder “Welle Achse 2” are the same line.

  • Unify

    Press force in tonnes, kN or N becomes one value in kN.

  • Trace

    Every value shows its source, exact location and version. Unclear rows are kept too.

  • Look back

    The as-built BOM, revision C, not the one in the quote.

  • Write back

    After sign-off, the quote lands in the ERP.

2 Rights

The org chart becomes the permission system

What only costing sees in the ERP, only costing sees in demi. And remote access to a line at a customer goes only to someone the customer has cleared for that service call.

Assembly-line business: 420 people, eight departments

Left to right, the way a job moves through the company.

Unit management and staff functions 30Unit managers 2 · Finance and controlling 10 · HR 6 · IT 7 · Assistants 5
  • 1Sales 22
    • Sales engineers 9
    • Quotes & costing 8
    • Inside sales 5
  • 2Project management 24
    • Project managers 14
    • Scheduling 4
    • Project assistants 6
  • 3Engineering 112
    • Mechanical 52
    • Electrical 24
    • Software & PLC 24
    • Robotics & machine vision 12
  • 4Purchasing and logistics 24
    • Purchasing 12
    • Materials planning 5
    • Warehouse & shipping 7
  • 5Manufacturing and assembly 158
    • Machining 30
    • Welding & frames 18
    • Mechanical assembly 70
    • Control cabinet building 40
  • 6Commissioning and service 42
    • Commissioning 14
    • Field service 16
    • Hotline & remote service 5
    • Spare parts 7
  • ·Quality and CE 8
    • Quality management 3
    • CE & technical writing 5

30 + 22 + 24 + 112 + 24 + 158 + 42 + 8 = 420 people

Who opens which room

WhoMachines at customersEngineeringQuotes & pricesCosting & marginsRemote accessHRApproves
Sales engineersreadsreadsown customers–––Technical content of the quote
Quotes & costingreadsreadseditsedits––Quote, price
Project managersown jobreadsown jobown job––Acceptance report, change-order quote
Engineeringreadsedits––––Change notice
Software & PLCreadsedits––per service call–PLC version
Serviceeditsreadsreads–per service call–Spare-part quote
HR–––––edits–
Customer #2207 in the portalownown docsown–own–Remote access per service call
Machine agent, AI coworkerreadsreads––––Never
Quote agent, on someone’s behalfAs much as the person who starts it. Never more.Never

Every room has keys. They come from your systems and never multiply on their own.

Only the people who do the costing see margins. Project managers see the figures of their own job, nothing else.

An agent carries the keys of the person it works for. An AI coworker has its own, and always a person who is accountable for it. Every access is in the log.

3 Intelligence

Five agents do the work, people approve

  1. Quote agent

    Works for the person who starts it

    TriggerSomeone in quotes & costing starts it on an inquiry with a requirement specification
    ReadsRequirement specification, earlier quotes, jobs, job costing, changes, acceptance reports
    DoesBreaks the specification down into requirements, finds the most similar jobs, shows planned against actual, drafts the costing and the scope of supply
    Sign-offQuotes & costing, sales engineer
  2. Engineering change agent

    AI coworker, accountable: head of engineering

    TriggerNew change request in the PDM or by email
    ReadsBOMs, circuit diagrams, open purchase orders, production orders, delivered lines of the same type
    DoesLists every affected assembly, purchase order and line at customers before anyone approves the change
    Sign-offEngineering
  3. Parts agent

    Works for the person who starts it

    TriggerSomeone in engineering starts it in the PDM with a dimension, material or sketch
    ReadsParts in the PDM, attributes, where-used lists, stock and prices in the ERP
    DoesFinds parts similar to bracket 300-4410, shows where they are used, what is in stock and what differs
    Sign-offEngineering decides
  4. Machine agent

    AI coworker, accountable: head of service

    TriggerA question about a job, a new service ticket
    ReadsERP deliveries, as-built BOM, PLC archive, tickets, acceptance reports
    DoesKeeps the file for each line: as-built BOM, PLC version, changes, service cases
    Sign-offService confirms gaps
  5. Spare parts agent

    AI coworker, accountable: head of service

    TriggerAn email with a nameplate photo in the service mailbox
    ReadsMachine file, as-built BOM, stock, terms
    DoesReads the serial number and job from the plate, looks up the requested part in the as-built BOM, finds its successor and drafts the quote
    Sign-offService, spare parts

Every draft quote follows the costing scheme in Ebert & Lorenz’s ERP.

Calculations run on Ebert & Lorenz’s own rules and data, not in the language model. Anything that goes out or is written back to a system is approved by a person.

The roadmap

Next: the CE file, commissioning and assembly planning

  1. CE file and manual

    From 20 January 2027 the new EU Machinery Regulation applies. For each job, demi compiles the CE technical file from the risk assessment, the as-built BOM and the PLC version, plus the operating instructions in the language of the country where the line runs. A person signs the declaration of conformity.

    S3
  2. Commissioning

    Reports, PLC versions and open items for each station land in the record, not on a laptop. Then service knows every version the line has ever had.

    S2
  3. Assembly planning

    Actual hours per station from job costing plan the next assembly. Production orders and parts run in the same record.

    O8S1

Sources

Why data first, then rights, then AI

60%

Gartner expects that through 2026, organisations will abandon 60% of AI projects that lack AI-ready data.

Gartner · 2025 · on step 1, dataOpen the source
Least privilege

Expose sensitive data in LLM apps only on a least-privilege basis: only what the user or process needs.

OWASP GenAI Security Project · 2025 · on step 2, rightsOpen the source
70%

70% of AI’s potential lies in core functions such as sales, production and the supply chain.

Boston Consulting Group · 2025 · on step 3, intelligenceOpen the source

All sources

Ebert & LorenzMachine buildingExample company

Ebert & Lorenz doesn’t exist. Your company does.

In 20 minutes we show you demi on a case like yours: bring the data together, set the rights, let AI do the work.

Ebert & Lorenz Maschinenbau GmbH & Co. KG is made up: a typical company in Machinery & Plant Engineering, not a real one. An estimate from our assumptions, not a promise. You can change every number in the configurator.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases