Getting started with AI · Metal & Machining
Rabenhammer doesn’t exist. Everything else on this page will feel familiar.
demi turns your systems into one record, carries over your rights and lets AI agents prepare the routine work. First the data, then the rights, then the AI. A person always approves.
What five use cases free up
+896 h per yearEstimate, not a promise≈ €58,240 per year, calculated cautiouslyRoute cardProduction traveller
pending
| Op | Work centre | Operation | Setup | Run | Stamp |
|---|---|---|---|---|---|
| 10 | SÄ 02 | Saw to 327 mm | 0.3 h | 0.8 min | |
| 20 | DZ 12 | Turn complete, sides 1 and 2 | 1.8 h | 4.2 min | |
| 30 | BAZ 07 | Mill keyway 10 P9 | 0.9 h | 1.1 min | |
| 40 | Hardening | Induction-harden and temper bearing seats, 56 ± 2 HRC, SHD 1.5 +1 | LA 26-0211 | ||
| 50 | RI 01 | Straighten, runout ≤ 0.03, crack test | 0.4 h | 0.6 min | |
| 60 | AR 03 | Grind bearing seats Ø 40 k6, Ra 0.8 | 1.2 h | 2.6 min | |
| 70 | KMG 2 | Inspect to PP W-3204/D | 1 + 5 per 100 | ||
| 80 | VP 01 | Wash, preserve, pack | 0.2 h | 0.5 min | |
AP W-3204/04 · NC O4471printed Mon 16 Nov 2026, 15:10 · sheet 1/1
ExampleThe problem
Rabenhammer’s goods-in bay holds 2.6 t of 42CrMo4 Ø 50, 28 bars for lot L-26-114: 500 drive shafts W-3204 for customer #6014, a gearbox maker. The delivery date is Friday next week.
The goods-in inspector puts the 3.1 inspection certificate next to the delivery note and the bar tag. Material, size, weight: all correct. The heat number is not.
It is one of 19 certificates sitting in the mailbox this morning. The bars are already booked for the saw, and the early shift is waiting. Two digits swapped on the delivery note? Or the wrong material in the bundle?
If a mix-up like this slips through, it only shows up in the hardening shop or at the customer. By then, 500 shafts have been turned, milled and hardened.
Inspection certificate EN 10204-3.1No. 3.1-26-118204 · page 1 of 2
| A01 | Manufacturer | Bright bar mill, supplier L-207 |
| A06 | Purchaser | Rabenhammer, Schweinfurt |
| A07 | Order | BE 26-0938, item 4 |
| B02 | Material | 42CrMo4+QT+SH · 1.7225 · EN 10277 |
| B07 | Heat | 412873 |
| B08 | Quantity | 28 bars |
| B09 | Diameter | Ø 50 h10, peeled |
| B11 | Length | 6,000 mm |
| B13 | Mass | 2,590 kg |
| C11 | Yield strength | Rp0.2 712 MPa |
| C12 | Tensile strength | Rm 958 MPa |
| Z01 | Declaration of conformity | Conforms to the order |
| Z02 | Date of issue | 12 Nov 2026 |
PDF by email, Mon 16 Nov, 16:02
Mill’s delivery note, item 428 bars 42CrMo4+QT Ø 50, heat 412837
Bar tag on the bundle1.7225 · Ø 50 · heat 412837
Together that is 4,180 hours a year, about 2.4 full-time roles. In estimating, a generational change is due by 2030: two of the four estimators are leaving, and with them the feel for what a shaft costs on each machine.
What did the similar shaft cost in 2023? Which machine, which workholding, which cycle time? Estimators dig through old orders instead of doing the maths.
Machinability, hardness, surface finish: two or three old hands know the answers. While they are at the machine, the customer waits.
Cutting data, tool life, the tricks of individual machines: in setup sheets, spreadsheets and people’s heads. Every new part starts from zero at prove-out.
Certificate, measurement report, inspection plan and, with every complaint, the 8D report: typed up, compared, filed. The customer wants all of it, today.
What demi does · An example
Goods in scans the delivery note and the bar tag and books 28 bars, 2,590 kg, against the purchase order. demi pulls in the certificate. It has been in the mailbox since Monday.
Material, size, heat, chemical analysis and tensile test, every value with its field code. All properties are within the limits of EN ISO 683-2.
Everything matches except one field: 412873 on the certificate, 412837 on the delivery note and the bar tag. Two digits swapped.
demi proposes the inspection decision: the material stays blocked until the heat is cleared up. Plus the query to the mill and a note for op 10 on the route card.
The inspector checks the end faces. Stamped in: 412873. He sends the query.
The mill confirms heat 412873 and sends a new delivery note. The inspector hangs a new tag on the bundle and releases the material. The heat goes on the route card, the saw starts.
| Characteristic | Order | Certificate | Delivery note | Result |
|---|---|---|---|---|
| Material | 42CrMo4+QT+SH | 42CrMo4+QT+SH | 42CrMo4+QT | match |
| Size | Ø 50 h10 | Ø 50 h10 | Ø 50 | match |
| Quantity | 2.6 t | 2,590 kg | 2,590 kg | within tolerance |
| Certificate | 3.1 | 3.1 | – | match |
| Rm | 900 to 1,100 | 958 MPa | – | within limits |
| Heat | – | 412873 | 412837 | mismatch |
The order values come from the ERP, the limits from the material standard. demi calculates and compares; the language model only reads the PDF.
With demi: at goods in, at 6:21If it slips through: in the hardening shop or at the customer
Almost every certificate matches its purchase order, and with demi, goods in simply ticks it off. Only the inspection time saved that way goes into the calculation below: 3 minutes per certificate, not 500 rescued shafts.
Office Floor <=> Shop Floor
demi can work at all 14 stations. Pick a use case and see which ones it touches.
Down to the hundredth. Since 1957.
Four lathes in a Schweinfurt backyard: the founder, a trained turner, makes shafts and bushings on them for the town’s rolling-bearing and drive plants. The name comes from the hammer forge where his family worked iron.
The company adds its own grinding shop. Bearing seats held to a few microns become its hallmark.
A move to the edge of town: three halls for turning, milling and grinding, plus a climate-controlled metrology room.
A five-axis cell with a pallet store mills housings at night too. Since 2024, rotor shafts for electric drives have joined the range.
Two siblings run the business their grandfather founded. Rabenhammer makes parts to customer drawings, in lots from ten to ten thousand.
The payoff
| Start | Use case | Volume per month | Share | Today per year | Freed up | Value per year |
|---|---|---|---|---|---|---|
| 1 | Check mill certificates against the orderQuality, goods in | 400 × 10 min | 50% | 800 h | 240 h | €15,600 |
| 2 | Cost turned parts straight from the drawingSales, estimating | 120 × 45 min | 30% | 1,080 h | 194 h | €12,610 |
| 3 | Check measurement reports against the drawingQuality, metrology room | 200 × 20 min | 40% | 800 h | 192 h | €12,480 |
| 4 | Routing and setup sheet from proven partsProcess planning, production | 80 × 60 min | 30% | 960 h | 173 h | €11,245 |
| 5 | Pre-fill 8D reports with real case dataQuality, complaints | 15 × 3 h | 30% | 540 h | 97 h | €6,305 |
| Total | 4,180 h | 896 h | €58,240 |
Of 4,180 hours, we count 896: volume times time times twelve months, then only the cautious share of that, times 0.6 for partly digital processes. That is about 0.5 full-time roles. Calculated at €65 per hour: €49.50 labour cost in manufacturing according to Destatis, plus workplace, IT and overheads. A number doesn’t fit your company? You can change every one of them in the configurator.
The start
| The first 90 days | Day 1 | Week 1 | Weeks 2 to 4 | Months 2 and 3 |
|---|---|---|---|---|
| Systems | ||||
| Mailboxes, file share | Goods-in mailbox and drawing archive, read-only | |||
| ERP | Read-only, via a small connector in their own network | |||
| CAQ, MES | Read-only | |||
| CAM | Read-only | |||
| Use cases | ||||
| 1 Mill certificates | With approval. Part of daily work from day 30 | |||
| 2 Costing turned parts | With approval | |||
| 3 Measurement reports | With approval | |||
| 4 Routing and setup sheet | With approval | |||
| 5 8D reports | With approval | |||
| Writing back | ||||
| Into the CAQ and ERP | After approval | |||
The certificates free up 240 hours a year for the goods-in inspectors. And the check is pure reading: the certificates arrive as PDFs by email, the purchase orders are in the ERP, the limits in the standard. The bars go to the saw only once the inspector releases them. Besides the routings, the quotes need the actual times from the MES, and the MES is connected from week 2.
1Data
An excerpt from Rabenhammer’s record.
Nothing gets replaced. Running a different ERP? demi connects to everything, from SAP and Oracle to the specialist software from the next town. At first, demi only reads. A person connects a system after seeing who will read what.
| Lot L-26-114 | Source: ERP, FA 26-114, and MES |
|---|---|
| Part W-3204 | Source: ERP, item master |
| Customer #6014 | Source: ERP |
| Drawing 4471-220-03 | Source: File share |
| Revision D | Source: Mailboxes, the customer’s mail #3318 |
| Due date 27 Nov 2026 | Source: ERP, call-off wk 48 |
| 42CrMo4+QT Ø 50 | Source: ERP, item master W-3204 |
| Certificate 3.1-26-118204 | Source: Mailboxes, mail of 16 Nov |
| Heat 412873 | Source: certificate and bar end, confirmed on 17 Nov |
| Routing AP W-3204/04 | Source: ERP |
| NC program O4471 | Source: CAM, for DZ 12 |
| Inspection plan PP W-3204/D | Source: CAQ |
| Quote #26-0412 | Source: ERP |
Customer #6014 gets lot L-26-114: 500 shafts W-3204 from heat 412873, delivered on 27 Nov.
Who?
#6014Gearbox maker, customer since 2011K-6014-2Buyer, personOE-QS-WEIncoming inspectionERPordered by customer #6014
What kind?
W-3204Drive shaft, own part number4471-220-03Customer drawing, revision DAP W-3204/04RoutingERP, file shareis a W-3204 to revision D
Made from?
412873Heat, 28 bars3.1-26-118204Inspection certificateBE 26-0938Purchase orderWE 26-1873Goods receiptMailboxes, ERPmade from heat 412873
Made with?
DZ 12Turning centreAR 03Cylindrical grinderO4471NC programRB W-3204/DZ12Setup sheetMES, CAMruns on DZ 12
Which one exactly?
Lot L-26-114
ERP, MESProduction order FA 26-114
What applies?
#26-0412QuoteRV-6014Framework agreementWk 48Call-off via EDIERPdelivered against the wk 48 call-off
What gets measured?
PP W-3204/DInspection plan, 42 characteristicsMB 26-114-01Measurement report for the customerKMG 2Coordinate measuring machineCAQinspected to PP W-3204/D
What’s in writing?
Mail #3318Revision D from the customerLA 26-0211Order to the hardening shopLS 26-7714Delivery note to #6014Mailboxes, ERPabout this lot
What do we make of it?
F-26-047Heat swapped on the delivery note and the bar tag, 412837 instead of 412873. Confirmed by the milldemifinding on this lot
This is lot L-26-114 as it leaves the works on 27 Nov. At the pump maker, the pump with its serial number sits in the middle; at the machine builder, the line at the customer’s site; at the space supplier, the flight unit in orbit. At Rabenhammer, it is the lot. The grid stays, the middle changes.
412873 and 412837 differ only by two swapped digits. Whether it is a typo or a second heat, the bar end decides.
The labels Schmelze, Schmelzennummer, Cast No. and Heat No. become one field, however each mill names it.
Every value shows its source, exact location and version. Unclear rows are kept too.
If a complaint arrives in two years, demi shows what applied to lot L-26-114: drawing revision D, inspection plan PP W-3204/D, heat 412873.
After approval, the inspection decision lands in the CAQ and the heat in the ERP.
2Rights
What only estimating sees in the ERP, only estimating sees in demi. And a customer sees only what belongs to their own parts and lots.
Cost the part, write the routing, order the bars, turn, measure: for every lot, those are departments 1 to 5.
14 + 12 + 31 + 25 + 176 + 24 + 10 + 18 = 310 people
Rights matrix, scrolls sideways →
| Who | Drawings & parts | Quotes & prices | Purchase orders & goods in | Certificates & measurements | Complaints & 8D | NC programs & machines | HR | Approves |
|---|---|---|---|---|---|---|---|---|
| Estimating | reads | edits | reads | reads | reads | reads | – | Quote, price |
| Process planning | edits | – | reads | reads | – | edits | – | Routing, setup sheet |
| Purchasing | reads | – | edits | reads | – | – | – | Purchase order |
| Incoming inspection | reads | – | reads | edits | – | – | – | Material inspection decision |
| Metrology room | reads | – | – | edits | reads | reads | – | Measurement report |
| QM and complaints | reads | – | reads | reads | edits | reads | – | 8D report |
| Setters (production) | released only | – | – | reads | – | own machine | – | First-off part |
| HR | – | – | – | – | – | – | edits | – |
| Customer #6014 in the portal | own parts | own | – | own lots | own | – | – | First article |
| Certificate agent, AI coworker | – | – | reads | reads | – | – | – | Never |
| Quote agent, on someone’s behalf | As much as the person who starts it. No more. | Never | ||||||
Every room has keys. They come from your systems and never multiply on their own.
Only the four estimators see machine hourly rates and costings. In the portal, a customer sees only their own parts, quotes, lots, certificates and complaints.
An agent carries the keys of the person it works for. An AI coworker has its own, and always a person who is accountable for it. Every access is in the log.
3Intelligence
AI coworker, accountable: head of quality
Works for the person who starts it
AI coworker, accountable: head of metrology
Works for the person who starts it
AI coworker, accountable: QM and complaints
The quote agent prices a turned part with Rabenhammer’s machine hourly rates and the actual times from the ERP and MES.
Calculations run on Rabenhammer’s own rules and data, not in the language model. Anything that goes out or is written back to a system is approved by a person.
The roadmap
Customers’ call-offs arrive via EDI, portal and email and land in the ERP, checked. Detailed scheduling sees material, setup sequence and hardening-shop dates in one picture and moves lots before a delivery date starts to slip.
Orders to subcontractors, their delivery notes and hardening records flow into the lot. If the bearing seats measure 52 instead of 56 ± 2 HRC, the metrology room knows before the shafts are back.
Delivery note, certificate and measurement report go to the customer as one package, straight from the lot and ready for their portal.
Sources
Through 2026, Gartner expects organisations to abandon 60% of AI projects that lack AI-ready data.
Gartner · 2025 · on step 1, dataOpen the source (opens in a new tab)Share sensitive data in LLM apps on a least-privilege basis only, meaning just what a user or process needs.
OWASP GenAI Security Project · 2025 · on step 2, rightsOpen the source (opens in a new tab)70% of AI’s potential value sits in core functions such as sales, manufacturing and supply chain.
Boston Consulting Group · 2025 · on step 3, intelligenceOpen the source (opens in a new tab)In 20 minutes we show you demi on a case like yours: bring the data together, set the rights, let AI do the work.
Rabenhammer Präzisionsteile GmbH is made up: a typical company in Metal & Machining, not a real one. An estimate from our assumptions, not a promise. You can change every number in the configurator.