Who?
Customers, contacts, teams
Customer #1611Car maker, Plant 1, organisation with the relation “customer since 2009”K-1611-2Customer’s material planner, personOE-KLCustomer logistics at Arnstein
ERPcalled off by customer #1611
Arnstein Automotive UK Limited · Coventry·,
Getting started with AI · Automotive Suppliers
Arnstein doesn’t exist. Everything else on this page will feel familiar.
demi turns your systems into one record, carries over your rights and lets AI agents prepare the routine work. First the data, then the rights, then the AI. A person always approves.
KLT 6280 · Package 1 of 48VDA 4902 transport label
Receiver
Unloading point · Location
NDelivery note no.
Supplier
Arnstein Automotive SE, Rennertshofen plant, 86643 Rennertshofen
Net / gross weight
No. of packages
PCustomer part no.
QQuantity
24Call-off Wk 48 ×2
Description
ENGINE MOUNT BRACKET LH
Supplier part no.
VSupplier no.
Date
Revision
SPackage no.
HBatch no.
Examplemade up
Call-off 0047Customer #1611 wants 9,600 brackets in week 48 instead of 4,800. That means 400 labels like this one instead of 200.
The problem
Overnight, the new delivery call-off from customer #1611 came in by EDI. For bracket AH-4380-LH it now asks for 9,600 pieces in week 48; last week’s call-off said 4,800. The jump falls inside the production release, so it is binding.
There are 2,900 brackets in stock, enough for three days. Die 1187 has 9,200 shots left before maintenance. Whether that is enough has to be pieced together from three places:
In the ERPThe new call-off has overwritten the old one. No list shows what changed.
In an Excel fileShot count and maintenance of die 1187, kept by the die shop.
In the MESCell Z07, two cavities, 60 seconds per shot. When it will be free, only scheduling knows.
So far, the jump only surfaces on Wednesday, when the figures are reconciled. On the Friday of week 48, a special shipment then goes out for €1,850.
Incoming EDI · Delivery call-off VDA 4905
| Week | 0046 | 0047 | Difference |
|---|---|---|---|
| Wk 47 | 4,800 | 4,800 | 0 |
| Wk 48 | 4,800 | 9,600 | +4,800 |
| Wk 49 | 4,800 | 4,800 | 0 |
| Wk 50 | 4,800 | 4,800 | 0 |
| Wk 51 | 3,600 | 3,600 | 0 |
| Wk 52 | 0 | 0 | 0 |
Customer’s cumulative quantity received 216,960
Arnstein’s cumulative quantity shipped 218,112
Production release up to week 49 231,360 → 236,160
Material release up to week 52 239,760 → 244,560
Jump in week 48: +4,800 pieces, +100%, inside the production release
Together that is 2,524 hours a year, about 1.4 full-time roles. On top of that, around 1,100 delivery notes go out every month, each package with a label like the one above.
Specification, corporate standards, drawings, logistics requirements: a team reads for days until feasibility is clear, and the quote deadline is short.
First-article report, process FMEA, control plan, IMDS entry: for every approval, Quality searches projects and drives for documents.
The 2021 cast housing was almost identical. But nobody quickly finds its alloy, gating, die concept or the porosity problems it had back then.
What demi does · An example
The call-off
demi puts call-off 0047 next to 0046. One week jumps: week 48, +4,800 pieces, +100%. The cumulative quantities match, 1,152 pieces are in transit on delivery note LS 26011603, no backlog.
The stock
2,900 brackets are in stock; at 960 pieces a day, that lasts three days. Without an extra shift, week 48 is 4,800 pieces short.
Cell and die
Cell Z07 casts two brackets per shot with die 1187, 120 pieces an hour. 4,800 more pieces mean 40 cell hours. Die 1187 stands at 140,800 shots; its next maintenance is due at 150,000. With the extra 4,800 pieces, it falls due at the end of week 49 instead of the end of week 50.
The proposal
demi drafts the plan: 40 cell hours on Z07 on Saturdays 21 and 28 November, three shifts each, die 1187’s maintenance fixed for the Friday of week 49, production order FA-26-04112 raised by 4,800 pieces.
The approval
Customer logistics checks the proposal, the head of the foundry approves the Saturday shifts, the die shop confirms the maintenance. Then the updated production order goes into the ERP.
The notice
The shift schedule for the two Saturdays is up before noon. Approvals and every access are in the log.
Hardly any call-off doubles a week the way 0047 does. Of around 600 call-offs a month, customer logistics checks about 200 closely, ten minutes each. The calculation below counts three of those minutes per call-off, and the special shipment not at all.
Office Floor <=> Shop Floor
demi can work at all 14 stations. Pick a use case and see which ones it touches.
Cast, machined, ready to fit.
At its Rennertshofen plant, Arnstein casts and machines aluminium brackets and housings and delivers them ready to fit, with wiring harness and seal profile, to car makers and large suppliers. Requests, first articles and 8D reports set the pace.
A foundryman who learned his trade in the old foundry halls of Ingolstadt founds Arnstein there as a light-metal foundry: sand and gravity die casting for farm machinery.
The Rennertshofen plant is built in the business park on the Danube: six die-casting machines, 80 people. By then, Arnstein had been die-casting parts for the car industry since 1966.
In-house CNC machining at Rennertshofen: the parts leave the plant ready to fit.
Stock-market listing. In the years that follow come plants in Spain, France, Poland, the Czech Republic, the US and China; since 2014 the group has been a European company (SE).
The first e-drive housing. Parts for combustion engines are being phased out; housings for e-axles are growing.
38,000 people at 15 locations in 14 countries. At the Rennertshofen plant: 14 cells from 840 to 3,200 tonnes, three shifts.
The payoff
| Start | Use case | Volume per month | Share | Today per year | Freed up | Value per year |
|---|---|---|---|---|---|---|
| 1 | Check delivery call-offs without retyping | 200 × 10 min | 50% | 400 h | 120 h | €7,800 |
| 2 | Pre-fill 8D reports with real case data | 15 × 3 h | 30% | 540 h | 97 h | €6,305 |
| 3 | Trace batches and serial numbers | 10 × 2 h | 40% | 240 h | 58 h | €3,770 |
| 4 | Assemble a complete first-article report | 10 × 8 h | 30% | 960 h | 173 h | €11,245 |
| 5 | FMEA draft from complaints and past data | 4 × 8 h | 30% | 384 h | 69 h | €4,485 |
| Total | 2,524 h | 517 h | €33,605 |
Of 2,524 hours, we count 517: volume times time times twelve months, then only the cautious share of that, times 0.6 for partly digital processes. That is about 0.3 full-time roles. Calculated at €65 per hour: €49.50 labour cost in manufacturing according to Destatis, plus workplace, IT and overheads. The €1,850 for the special shipment that is no longer needed comes on top. A number doesn’t fit your company? You can change every one of them in the configurator.
The start
| The first 90 days | Day 1 | Week 1 | Week 2–4 | Month 2–3 |
|---|---|---|---|---|
| Systems | ||||
| EDI and ERP | Call-offs and stock, read-only | |||
| CAQ and MES | Read-only, via a small connector in their own network | |||
| PLM, file share | Read-only | |||
| Customer portals, mailboxes | Read-only | |||
| Use cases | ||||
| 1 Call-offs | Comparison from day 1. Part of daily work from day 30 | |||
| 2 8D reports | With approval | |||
| 3 Traceability | With approval | |||
| 4 First articles | With approval | |||
| 5 FMEA | With approval | |||
| Writing back | ||||
| Into the ERP and the CAQ | Approved call-offs, orders and 8Ds | |||
Around 600 arrive every month, and 200 of them need a real look. From day 1, demi reads only the call-off, its previous version and the stock for the comparison. The cell schedule and die register follow with the MES and the file share by week 4. Nothing is written until someone approves. Along the way, the use case links customer part number, own part number, die and cell. That is exactly the link that 8D, traceability and first articles need later. From day 30, customer logistics finds every new call-off already compared in the morning.
1Data
An excerpt from Arnstein’s record.
Nothing gets replaced. Running a different ERP? demi connects to everything, from SAP and Oracle to the specialist software from the next town. At first, demi only reads. A person connects a system after seeing who will read what.
| Customer | |
|---|---|
| Customer #1611, Plant 1 | ERP, customer master data |
| Unloading point Gate 7 · location 1A-14 | EDI, call-off 0047 |
| Supplier no. 104417 | ERP, number at customer #1611 |
| Part | |
| KS 7731 0412, rev. C | PLM, customer drawing rev. C |
| AH-4380-LH | ERP, item master data |
| 11.3 kg = 24 × 0.47 kg | PLM, drawing Z-AH-4380 C |
| 24 pieces per KLT 6280 | ERP, packaging specification |
| Delivery | |
| LS 26011648, 48 packages | ERP, shipped on 16 Nov 2026 |
| Package 418273095 | ERP, shipping, in the advance shipping notice to customer #1611 |
| Casting batch | |
| G26316-Z07 | MES, cell Z07, cast on 12 Nov 2026 |
| Die 1187, cavity 2 | File share, die register |
| Melt batch S26-0889 | MES, melting shop |
Customer #1611 calls off bracket AH-4380-LH, cast on die 1187 in cell Z07, shipped on delivery note LS 26011648.
Who?
Customer #1611Car maker, Plant 1, organisation with the relation “customer since 2009”K-1611-2Customer’s material planner, personOE-KLCustomer logistics at ArnsteinERPcalled off by customer #1611
What kind?
KS 7731 0412Customer part number, rev. CZ-AH-4380Drawing, rev. CEN AC-43500Alloy, temper T7PLM, ERPis rev. C
Where?
Z07Die-casting cell, 840 tDie 1187two cavities, 140,800 shotsMES, file sharecast on die 1187
What’s going on?
Call-off 0047Week 48: 9,600 piecesFA-26-04112Production order on Z07EDI, ERPcalled off with 0047
Which one exactly?
AH-4380-LH
ERP, PLMseries part since SOP 03/2025
What applies?
EM-25-018First-article approval, rev. C, PPAP level 3ÄM-26-118Customer change to rev. DRV-1611-04Framework agreement until EOP 2032CAQ, ERPapproved with EM-25-018
What’s in writing?
LS 26011648Delivery note, 48 packages418273095Package with labelMail #4471Planner’s query about week 48ERP, mailboxesdescribes this delivery
What should it be?
BDG P 202Porosity at the bearing boreCSR-1611Customer-specific requirementsPLM, mailboxesapplies to rev. C
What do we make of it?
F-26-077Jump in week 48, maintenance of die 1187 moves to week 49demifinding on this part
At the pump maker, the pump with its serial number sits in the middle; at the machine builder, the line at the customer’s site; at the space supplier, the flight unit in orbit. At Arnstein, it is the part number in series production, delivered in batches. The grid stays, the middle changes.
KS 7731 0412, AH-4380-LH and “ENGINE MOUNT BRACKET LH” are one part: in the call-off, in the ERP and on the label.
Call-offs from EDI, portal and PDF get one format. Every old version is kept as a source.
Every value shows its source, exact location and version. Unclear rows are kept too.
Call-off 0046 next to 0047, revision C next to revision D: every version stays readable.
After approval, the ERP takes over call-offs from portal and PDF and the updated production order; the CAQ takes the 8D draft.
2Rights
Sales sees the selling prices. What customer #1611 sends in confidence, specifications and prototypes, only the project team sees.
Sales, engineering, quality and logistics
Plant
24 + 22 + 44 + 44 + 44 + 118 + 150 + 24 = 470 people
| Who | Parts and drawings | Call-offs and deliveries | Selling prices and costing | Complaints and 8D | Process and casting data | Customer specifications | HR | Approves |
|---|---|---|---|---|---|---|---|---|
| Sales and projects | reads | reads | edits | reads | – | own project | – | Quote, price |
| Engineering and die shop | edits | – | – | reads | reads | own project | – | Drawing, die maintenance |
| Quality | reads | reads | – | edits | reads | own project | – | Hold, 8D, first articles |
| Logistics and purchasing | reads | edits | – | reads | cell and die only | – | – | Call-off, purchase order |
| Foundry | reads | – | – | reads | edits | – | – | Casting batch, extra shift |
| Machining and assembly | reads | – | – | reads | edits | – | – | Inspection result at the line |
| HR | – | – | – | – | – | – | edits | – |
| Customer #1611 in the portal | own | own | – | own | – | own | – | Sample submission |
| Call-off agent, AI coworker | reads | reads | – | – | cell and die only | – | – | Never |
| 8D agent, on someone’s behalf | As much as the person who starts it. No more. | Never | ||||||
Every room has keys. They come from your systems and never multiply on their own.
Selling prices and costings are visible only to those who need them: Sales, Management and Finance. The call-off agent works with quantities and never sees a price.
An agent carries the keys of the person it works for. An AI coworker has its own, and always a person who is accountable for it. Every access is in the log.
3Intelligence
AI coworker, accountable: head of customer logistics
Works for the person who starts it
AI coworker, accountable: head of quality
Works for the person who starts it
AI coworker, accountable: head of quality planning
For stock coverage, demi divides stock by daily demand; for cell hours, the quantity by the output from cycle time and cavities. Cumulative quantities come from EDI and shipping.
Calculations run on Arnstein’s own rules and data, not in the language model. Anything that goes out or is written back to a system is approved by a person.
The roadmap
RFQ-26-031 arrives with a specification, corporate standards and logistics requirements. demi finds the requirements that differ from the last cast housing and puts the costing of the similar part next to them.
Today demi proposes the plan for one jump. Next, demi helps plan all 14 cells: every call-off lands in the cell schedule as a proposal, with die changes, die maintenance and shifts.
The MES records 200 values per shot. demi flags when the shot curve or die temperature at a cell runs the way it did before the past case 8D-25-087.
Sources
Through 2026, Gartner expects organisations to abandon 60% of AI projects that lack AI-ready data.
Gartner · 2025 · on step 1, dataOpen the source (opens in a new tab)Share sensitive data in LLM apps on a least-privilege basis only, meaning just what a user or process needs.
OWASP GenAI Security Project · 2025 · on step 2, rightsOpen the source (opens in a new tab)70% of AI’s potential value sits in core functions such as sales, manufacturing and supply chain.
Boston Consulting Group · 2025 · on step 3, intelligenceOpen the source (opens in a new tab)In 20 minutes we show you demi on a case like yours: bring the data together, set the rights, let AI do the work.
Arnstein Automotive SE is made up: a typical group in the automotive supply industry, not a real one. An estimate from our assumptions, not a promise. You can change every number in the configurator.