Skip to content
Quality, standards & complianceMachinery & Plant EngineeringEnergy & UtilitiesElectrical Engineering & Switchgear

Design and routine verification to IEC 61439

demi checks every switchgear assembly against its design verification, calculates power loss and prepares the routine verification report.

Today

Every low-voltage switchgear assembly needs a design verification and a routine verification. Panel builders usually derive the design verification from a manufacturer's tested system, and it holds only as long as the cabinet stays within that system. When a circuit breaker is swapped because it is not available, or the power loss in a section rises, often nobody checks again. The routine verification is recorded on paper and typed up later.

An example

Elmeris builds a main low-voltage switchboard NHV-1600 with 14 sections for a hospital. Because the planned 630 A circuit breaker has a lead time of 26 weeks, purchasing proposes another make. The agent shows that this breaker is not in the design verification of the busbar system and that section 7 would then be 38 W above the permissible power loss at 35 °C. Electrical engineering picks a covered breaker with 9 weeks' lead time. In the prefilled routine verification report with 62 test items, only the insulation resistance of section 3 is missing at the end.
Fictional company, typical workflow.

Your data, wherever it lives

Design verifications and system documents live today as PDFs on the drive, data sheets on the manufacturers' websites, parts lists in electrical CAD and ERP, test reports on paper or as scans in the test bay. demi reads, understands and links them per cabinet and section, with your rights. The AI checks every swap against the verification in minutes, and your tester decides and signs.

Where the data lives today

  • CAD & drawings
  • ERP
  • PDFs
  • Web & portals
  • Scans & paper
  • QM system
  • Folders & drives
Data LayerOne view of everything, with your rights

How demi solves it

Three layers in this order: connect the data first, then the rights, then the AI.

  1. 1 · ConnectData Layer

    Data sources in this case: parts list and section layout per cabinet from electrical CAD and ERP, the manufacturers' design verifications and system documents, data sheets with rated currents and power losses, and the reports from the test bay. demi replaces nothing and links every section with its components and verifications. demi writes back only after approval.

  2. 2 · PermitPermission Layer

    Verifications and reports are visible to electrical engineering, the test bay and quality. The responsible tester signs the routine verification, and every assessed deviation is recorded with name and date.

  3. 3 · ActIntelligence Layer

    The agent matches every component and combination against the system's design verification by exact part number instead of guessing from similar names. Power loss and temperature rise come from a fixed, versioned calculation; the language model only explains which section exceeds the limit and what the options are. It checks the readings of the routine verification against stored limits.

How it runs

  1. 1

    Parts list and section layout come from electrical CAD and ERP, system verifications and data sheets from the drive and the manufacturers.

  2. 2

    For each section the agent checks whether components and combination are covered by the design verification.

  3. 3

    It calculates the power loss against what the enclosure allows and shows every gap.

  4. 4

    It sets up the routine verification report per cabinet with every test item; the test bay enters the readings.

  5. 5

    The agent checks the values, the tester signs, and the verifications go into the customer documentation.

What changes

  • Every swap is checked against the design verification

  • Complete routine verification reports for every cabinet

  • Verifications for customer and acceptance at hand at once

What does it bring you?

Check it with your own numbers

Every starting value is an assumption you can change. The calculation sits right below, step by step.

Assumption, editable

Your numbers

Result

+216 hfreed per year

Assumptions and calculation

demi checks each cabinet against its design verification and prefills the report; your test bay signs.

2 h → 1.4 h per case

How does it run today?

What is already digital saves less: the factor lowers the share demi brings.

How we calculate

30 switchgear assemblies × 2 h × 30% × 1.0 (manual) × 12 months = 216 h

Value per year, before demi costs

Freed per year+216 h

Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.

= Value per year, before demi costs

+€14,040

gained per year

216 h ÷ 1,760 h per role = 0.1 full-time roles

An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.

Combine with more cases and get the package

Questions about this use case

Does demi replace the system manufacturer's design verification?

No. The verification stays with the manufacturer of the tested system and with you as the manufacturer of the assembly. demi checks whether your cabinet stays within that verification and shows every point where it leaves it.

How does demi calculate a cabinet's temperature rise?

With a fixed, versioned calculation from the power losses in the data sheets, enclosure size, installation and ambient temperature. You decide which method applies. The language model does not calculate; it only explains the result.

Which test items does the routine verification report contain?

The items of the routine verification to IEC 61439, plus your own, such as degree of protection, protective conductor, wiring, function and insulation. The agent prefills what comes from the cabinet's data; measuring and signing happen in the test bay.

Does this also work for cabinets built to UL 508A?

Yes. For cabinets going to North America, demi checks listings and the short-circuit current rating to UL 508A in a separate flow. Which standard applies to which cabinet is set in the order.

See this case with your data

In the demo we show you the workflow on your own systems.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases