Today
During commissioning, wires are moved, bridges added and parts swapped. The changes end up in red pen on the paper schematic in the cabinet or as a phone photo in an e-mail. Weeks pass before someone carries them into the electrical CAD, and some get lost on the way. Then schematic, terminal diagram and parts list no longer match the cabinet, and the customer receives documentation that does not show what was built.
An example
Elmeris commissions a control cabinet SWS-1200 for a filling line. Back come 23 pages marked in red out of 186 sheets. The agent finds 41 changes: 17 rewired conductors, 9 new bridges, 6 changed settings on motor protection breakers and one swapped frequency inverter. It reports that a new wire lands on terminal X3:22, which is already in use, and that the swapped inverter is not in the parts list. The electrical engineer takes over 39 changes in one morning and clears two with commissioning.
Your data, wherever it lives
Red-pen changes live today as paper in the cabinet, as scans on the drive or as phone photos in e-mails. The project sits in the electrical CAD, parts list and order in the ERP. demi reads, understands and links them per cabinet, with your rights. A stack of marked pages becomes a checked change list in minutes, and your electrical engineers decide on every change.
Where the data lives today
- Scans & paper
- CAD & drawings
- PDFs
- ERP
- E-mails
- Folders & drives
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
Data sources in this case: scans and photos of the marked pages, the electrical CAD project with device tags, terminal and cable diagrams, plus parts list and order from the ERP. demi replaces nothing and links every markup to sheet, column and device. demi writes back only after approval.
- 2 · PermitPermission Layer
The schematics of an order are visible to electrical engineering, commissioning and project management. A person in electrical engineering takes over every change; what they accept or reject is recorded with name and date in the change list.
- 3 · ActIntelligence Layer
The agent recognises strokes, arrows, new wires and handwritten values and reads device tags and terminals exactly as printed. It checks every change against the project: is the terminal free, is the new part in the parts list, does a rated value change? What it cannot read with certainty it flags instead of guessing.
How it runs
- 1
Commissioning scans or photographs the marked pages and sends them by e-mail.
- 2
The agent assigns every markup to sheet, column and device in the electrical CAD project.
- 3
It checks every change against terminal diagram, parts list and rated values and reports conflicts.
- 4
Electrical engineering accepts or rejects each change and enters it in the electrical CAD.
- 5
Parts list and customer documentation go out with a new revision.
What changes
The schematic shows the cabinet as built
No red-pen change gets lost any more
Service and spare parts work from the right parts list
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+346 hfreed per year
Assumptions and calculation
demi reads every red-pen change and maps it to the schematic; your electrical engineers carry it over.
8 h → 5.6 h per case
How we calculate
12 red-pen markup sets × 8 h × 30% × 1.0 (manual) × 12 months = 346 h
Value per year, before demi costs
Freed per year+346 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€22,490
gained per year
346 h ÷ 1,760 h per role = 0.2 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Can demi read handwritten red-pen markups?
Yes. The agent recognises strokes, arrows, new wires and handwritten values on scans and phone photos. Uncertain spots are shown with the image cut-out so that a person decides; nothing is guessed.
Does demi write the changes straight into our electrical CAD?
No, that stays with your electrical engineers. demi supplies the checked change list with sheet, column, device and the old and new state. demi updates parts list and order in the ERP only after approval.
What happens if a change does not fit the project?
The agent reports the conflict, for example a terminal already in use, a part without a parts list line or a changed rated value that affects the cabinet's verification. It shows the spot in the schematic with the markup beside it.
Does the customer then get up-to-date documentation?
Yes. After approval demi compiles schematic, terminal diagram and parts list in the new revision into the customer documentation. Every revision shows which changes from commissioning it contains.