Who?
Customers, authorities, teams
Customer #1312Road builder, organisation with a framework agreement since 2019BB-STMining authority, quarrying unitOE-UGEnvironment and permits
ERP, mailboxesis supplied by, inspects, is responsible for
Montanis Hartsteinwerke GmbH·, Brand-Erbisdorf (Germany)·, since 1872·, 600 people·, 13 sites, around 6.5 million tonnes a year
Getting started with AI · Mining & Raw Materials
Montanis doesn’t exist. Everything else on this page will feel familiar.
demi turns your systems into one record, carries over your rights and lets AI agents prepare the routine work. First the data, then the rights, then the AI. A person always approves.
What five use cases free up
+890 h per yearEstimate, not a promise≈ €57,850 per year, calculated cautiouslyBlast data
The problem
The mining authority announces its inspection of Site 3. On Thursday at 9:00 am, its inspectors walk the quarry with the site manager. By then, the environmental officer needs the evidence for 86 conditions of the main operating plan: twelve monthly reports on dust deposition, 23 blast reports with vibration readings, the progress of restoration on the east slope.
Every piece of evidence exists. Just not in one place:
In a folderMain operating plan HBP-3-2025 with its 86 conditions, as a scan.
In mailboxesTwelve monthly reports from the monitoring lab and 23 records from the vibration monitor, as PDF attachments.
In someone’s headOnly the site manager knows how far the restoration of the east slope has come. The photos are on his phone.
The environmental officer spends two days pulling it all together. The blast still goes off at 12:15 pm, and the next report lands in the folder again.
HBP-3-2025 · EvidenceInspection 5 Nov
… 86 conditions
Together that is 3,450 hours a year, about 2 full-time roles. On top of that, there are around 150 blasts a year in four quarries, each with its own report and readings.
13,000 loads a month in the Central Saxony unit alone, and every one needs its order, product, job site and price. Whatever doesn’t match lands on a pile, and the invoice waits.
Dust deposition, noise, vibration at every blast, groundwater, restoration. Thirteen sites, hundreds of conditions, tracked in binders and spreadsheets.
What falls due on crushers, screens and belts in January sits in meter readings, paper reports and people’s heads. If a part with an eight-week lead time is missing, the line stands still in March.
What demi does · An example
demi reads the mining authority’s email and opens the inspection file: all 86 conditions of HBP-3-2025, each with the evidence it requires.
Twelve monthly reports for SN 1 to SN 4, 23 blast reports with the readings from MP 1, the survey plans with the extraction boundary. Found in mailboxes and the file share.
83 conditions have their evidence. Three are open, each with a name: SN 3 has no reading for August, the east slope has had no photos since June, the 2026 noise report is nowhere to be found.
42 blastholes, 95 kg per delay. At 12:16 pm the vibration monitor at MP 1 sends its record: 2.1 mm/s at 18 Hz. demi attaches the trace to condition 4.15. After the post-blast check, the shotfirer sounds the all-clear and signs off the blast report, which demi attaches to 4.12.
The inspection file is ready: 86 conditions, 83 with evidence, three open, each with a name and a date. The environmental officer spends an hour checking it, and the site manager approves it.
The site manager uploads the photos of the east slope. demi assigns them to condition 7.4 and to the working area in the survey plans.
The site manager and the environmental officer walk the quarry with the authority. Every question has its evidence, including Tuesday’s SP-3-26-064. Two items stay open, both with a date.
A few times a year, the mining authority announces an inspection, and each time the file takes two days of searching. Blast and monitoring reports, on the other hand, arrive week after week. Only this ongoing work is in the table below, and demi takes just under 11 minutes off each condition.
Stone from Saxony. Since 1872.
A stonemason from a mining family opens a quarry for paving setts near Brand. With the new gold mark, the silver from the mines loses its value; the growing cities need roads.
The first stone crusher. The quarry supplies crushed stone for the railway, still in the range today as railway ballast.
The Treuhand privatisation agency sells the former East German state-owned enterprise, with 41 people and one quarry, to a family that quarries granite in the Bavarian Forest. The family names the business Montanis, after the Latin montanus, “of the mountain”: in the Ore Mountains, mining has been called Montanwesen for centuries. Rebuilding the East takes crushed stone for new motorways.
Its own laboratory and factory production control. By 2012, three more quarries and two gravel pits have joined: the Central Saxony unit with six sites.
Montanis takes over seven sites in the Ore Mountains and founds Montanis Nederland B.V. in Rotterdam: armourstone and high-grade chippings travel by block train to dyke and road builders in the Netherlands.
13 sites, all still owned by the family that bought the business in 1991, now run by its second generation. Montanis takes in uncontaminated excavated soil for backfilling and is testing its first electric dump truck.
The payoff
| Start | Use case | Volume per month | Share | Today per year | Freed up | Value per year |
|---|---|---|---|---|---|---|
| 1 | Match weighbridge tickets with documentsShipping and weighbridge. demi matches every weighing with its order, delivery note and accompanying documents; you settle the deviations. | 1,500 × 5 min | 50% | 1,500 h | 450 h | €29,250 |
| 2 | Track every permit conditionEnvironment and permits. demi assigns each condition to its plant and owner and tracks deadlines and readings; you meet it. | 30 × 45 min | 40% | 270 h | 65 h | €4,225 |
| 3 | Manual answers right at the machineMaintenance. demi answers from the manual of exactly this variant, with the page; you carry on at the machine. | 400 × 15 min | 40% | 1,200 h | 288 h | €18,720 |
| 4 | Bundle maintenance into planned shutdownsMaintenance. demi collects due maintenance and inspections per machine and fits them into the shutdown; you agree the plan. | 4 × 4 h | 30% | 192 h | 35 h | €2,275 |
| 5 | Plan spare parts for heavy machineryPurchasing. demi works out part demand from operating hours, tonnage, service history and lead times; you order. | 4 × 6 h | 30% | 288 h | 52 h | €3,380 |
| Total | 3,450 h | 890 h | €57,850 |
Calculated for the Central Saxony unit, six of the 13 sites. Of 3,450 hours, we count 890: volume times time times twelve months, then only the cautious share of that, times 0.6 for partly digital processes. That is about 0.5 full-time roles. Calculated at €65 per hour: €49.50 labour cost in manufacturing according to Destatis, plus workplace, IT and overheads. A number doesn’t fit your company? You can change every one of them in the configurator.
Site Office <=> Quarry Floor
demi can work at all 14 stations. Pick a use case and see which ones it touches.
The start
| The first 90 days | Day 1 | Week 1 | Weeks 2 to 4 | Months 2 and 3 |
|---|---|---|---|---|
| Systems | ||||
| Weighbridge software, mailboxes, file shareDaily export from the six weighbridges, plus the file share, read-only | Daily export from the six weighbridges, plus the file share, read-only | |||
| ERP with invoicingRead-only, via a small connector in their own network | Read-only, via a small connector in their own network | |||
| Maintenance, labRead-only | Read-only | |||
| Plant controlRead-only: belt scales, meters | Read-only: belt scales, meters | |||
| Use cases | ||||
| 1 Weighbridge ticketsMatching, read-only. Part of daily work from day 30 | Matching, read-only. Part of daily work from day 30 | |||
| 2 Permit conditionsWith approval | With approval | |||
| 3 ManualsThe fitter decides | The fitter decides | |||
| 4 ShutdownsBefore the winter overhaul | Before the winter overhaul | |||
| 5 Spare partsWith approval | With approval | |||
| Writing back | ||||
| Into invoicingAfter approval | After approval | |||
The weighbridge accounts for a good half of the hours we count: 450 of 890 hours a year. The daily export of the six weighbridges is clean: every load already has its delivery note number, its weight and its alibi number. demi only reads and puts every deviation, with its reason, on the invoicing pile. demi writes invoices only from month 2, and only after approval. demi starts on the permit conditions as early as week 1: the main operating plan and the monitoring reports are already in the file share and the mailboxes.
1Data
An excerpt from the Montanis record.
Nothing gets replaced. Running a different ERP? demi connects to everything, from SAP and Oracle to the specialist software from the next town. At first, demi only reads. A person connects a system after seeing who will read what.
| Site 3, gneiss | ERP, location and cost centre |
|---|---|
| HBP-3-2025, 86 conditions | File share, approval notice as a scan |
| NB 4.12: 120 kg at most | File share, HBP-3-2025, page 41 |
| SP-3-26-064, 42 blastholes | File share, blast report |
| MP 1: 2.1 mm/s at 18 Hz | Mailboxes, record from the monitor |
| SN 1–4, dust deposition | Mailboxes, monthly reports |
| A3-BR02, cone crusher | Maintenance, machine and meter |
| A3-BR02: 412,600 t since the last change | Plant control, belt scale |
| 3-26-048213, 25.24 t | Weighbridge software, alibi no. 117 451 |
| Product 3204, LE-3-0032 | Lab, declaration of performance |
| Customer #1312, B-2614 | ERP, framework agreement RV-26-0187 |
At Site 3, SP-3-26-064 breaks around 19,300 t of gneiss, crusher A3-BR02 turns it into crushed stone, and delivery note 3-26-048213 takes 25.24 t of it to job site B-2614.
Who?
Customer #1312Road builder, organisation with a framework agreement since 2019BB-STMining authority, quarrying unitOE-UGEnvironment and permitsERP, mailboxesis supplied by, inspects, is responsible for
What kind?
Product 3204Crushed-stone base 0/32LE-3-0032Declaration of performance, system 2+P-3-26-0412Sample from stockpile H7, grading curveLabis produced at Site 3
Where?
Bench 3 EastWorking area with its extraction boundaryMP 1House 640 m away, vibrationSN 1–4Dust deposition at the site boundaryFile sharelies within Site 3
What’s going on?
A3-BR02Cone crusher, crushing line 2IA-26-1187Replace mantle and concaveTruck 27Tipper semi-trailer, own fleetMaintenanceworks at Site 3
Which one exactly?
Site 3
ERPlocation with a main operating plan
What applies?
HBP-3-2025Main operating plan, 86 conditionsNB 4.12120 kg per delay at mostRV-26-0187Framework agreement, project price B-2614File share, ERPapplies to Site 3
What’s in writing?
SP-3-26-064Blast report of 3 Nov3-26-048213Delivery note, 25.24 tMail #6093Inspection noticeFile share, weighbridge, mailboxesis about Site 3
What should it be?
NB 4.155 mm/s at most at the houseNB 5.3Dust deposition under TA LuftTL SoB-StB 20Fines content 5% at mostFile share, lablimit for Site 3
What do we make of it?
F-26-019SN 3 without a reading in August, collector damagedF-26-022Mantle of A3-BR02 at its limit in nine weeksdemifinding on Site 3
At the pump maker, the pump with its serial number sits in the middle; at the machine builder, the line at the customer’s site; at the space supplier, the flight unit in orbit. At Montanis, it is the site. The grid stays, the middle changes.
“Site 3”, “East quarry” and cost centre 300 are the same place.
“Crushed stone 0/32”, “STS 0/32” and product 3204 become one product.
Every value shows its source, exact location and version. Unclear rows are kept too.
Every blast since the last inspection, with its reading at MP 1.
After approval, the invoice goes into the invoicing system.
2Rights
What only invoicing sees in the ERP, only invoicing sees in demi. And a site manager sees their own site in demi, just as in the file share today.
No blast goes off without a permit, so permits come first. Then the stone is blasted, crushed, tested in the lab and weighed at the weighbridge; last of all, dispatch plans the load for the job site.
22 + 8 + 122 + 46 + 10 + 38 + 16 + 8 = 270 people
| Who | Permits & readings | Blasts | Machines & maintenance | Weighings & delivery notes | Prices & framework agreements | HR | Approves |
|---|---|---|---|---|---|---|---|
| Environment and permits | edits | reads | – | – | – | – | Evidence for the authority |
| Site management | own site | own site | own site | own site | – | – | Shutdown, inspection file |
| Shotfirers | reads | own blasts | – | – | – | – | Blast report |
| Maintenance | – | – | edits | – | – | – | Work order, parts demand |
| Weighbridge | – | – | – | own weighbridge | reads | – | Weighbridge ticket |
| Finance and invoicing | – | – | – | reads | reads | – | Invoice |
| Sales and dispatch | – | – | – | reads | edits | – | Project price |
| HR | – | – | – | – | – | edits | – |
| Customer #1312 in the portal | – | – | – | own loads | own | – | Receipt at the job site |
| Conditions agent, AI coworker | reads | reads | – | – | – | – | Never |
| Manual agent, on someone’s behalf | As much as the person who starts it. No more. | Never | |||||
Every room has keys. They come from your systems and never multiply on their own.
Only those who sell, invoice or weigh see prices and framework agreements; the customer sees only its own. A site manager sees their own site, not the other twelve.
An agent carries the keys of the person it works for. An AI coworker has its own, and always a person who is accountable for it. Every access is in the log.
3Intelligence
AI coworker, accountable: head of shipping and weighbridge
AI coworker, accountable: environment and permits
Works for the person who starts it
AI coworker, accountable: head of maintenance
AI coworker, accountable: purchasing
demi checks limits against the readings and takes tonnages from the legal-for-trade weighings and prices from the framework agreements.
At Montanis, calculations run on the company’s own rules and data, not in the language model. Anything that goes out or is written back to a system is approved by a person.
The roadmap
Around 60 products, each with its own declaration of performance. demi keeps them up to date from the production control test reports and attaches the right one to every delivery note.
Grading curve, particle shape, frost resistance: every sample goes into the record with its stockpile and product. If a grading curve deviates, the weighbridge knows before the next load.
Call-offs from the job sites come in by email and phone. demi matches each call-off to its framework agreement, product and vehicle; dispatch plans the loads.
Sources
Through 2026, Gartner expects organisations to abandon 60% of AI projects that lack AI-ready data.
Gartner · 2025 · on step 1, dataOpen the source (opens in a new tab)Share sensitive data in LLM apps on a least-privilege basis only, meaning just what a user or process needs.
OWASP GenAI Security Project · 2025 · on step 2, rightsOpen the source (opens in a new tab)70% of AI’s potential value sits in core functions such as sales, manufacturing and supply chain.
Boston Consulting Group · 2025 · on step 3, intelligenceOpen the source (opens in a new tab)In 20 minutes we show you demi on a case like yours: bring the data together, set the rights, let AI do the work.
Montanis Hartsteinwerke GmbH is made up: a typical company in Mining & Raw Materials, not a real one. An estimate from our assumptions, not a promise. You can change every number in the configurator.