Who?
Customers, crews, partners
Customer #1290Main contractor, organisationK-1290-3The main contractor’s site manager, personOE-MB-02Installation crew 2, eight fittersNU-114Insulation subcontractor
CRM, ERPbuilt for customer #1290
Nortavo Gebäudetechnik GmbH & Co. KG·, Ilmenau (Germany)·, since 1921·, 2,900 people·, 7 sites in 7 countries
Getting started with AI · Construction & Building Services
What five use cases free up
+568 h per yearNortavo is the world market leader in hygienic ventilation units for operating theatres and laboratories. In its Plant Rooms business unit in Ilmenau, Nortavo builds ventilation units, heat pumps, heating circuit manifolds and control cabinets, and its own crews install them as complete plant rooms on site. Bills of quantities, certificates and daily site reports eat up the week.
Nortavo doesn’t exist. Everything else on this page will feel familiar.
demi turns your systems into one record, carries over your rights and lets AI agents prepare the routine work. First the data, then the rights, then the AI. A person always approves.
Bill of quantities
Page 14 of 62
West School Campus, new sports hall and refurbishment of Building B · Lot 02 ventilation and air conditioning, supply and installation
Supply, bring in, set up and connect ready for operation. Sectional casing, indoor installation. Air flow supply/extract 4,000/4,000 m³/h. External static pressure 400/350 Pa. Heat recovery with cross-counterflow plate heat exchanger, dry temperature ratio min. 80% to DIN EN 13053. Outdoor air filter ISO ePM1 55%, extract air ISO ePM10 60%. Casing to DIN EN 1886: D1 (M), L1 (M), T2, TB2, F9. Hygienic design to VDI 6022 Part 1, enclose the declaration of hygiene conformity. EC fans, plug type. Ecodesign (EU) 1253/2014, Tier 2 (2018).
Reference product: as per design documents, Annex 7, or equivalent. Submit proof of equivalence with the bid.
Product offered: Nortavo Type: ILZ 40 H, XL plate
The problem
North Office Building, 2nd floor. 3 °C, drizzle. The mobile crane lifts the first ILZ 40 ventilation unit through the façade opening into the plant room.
Unit 2’s spot: the wall is not plastered. Once the unit is in place, no plasterer can get behind it. Unit 2 stays in the laydown area, and at 7:45 the crane leaves. Eight fitters wait.
The site manager calls the main contractor’s site team. The photos go into the site’s messenger group.
The main contractor instructs: unit 2 only after plastering. The crew moves over to the DN 50 heating pipework. Three hours are gone, and a second crane lift is now needed.
End of the day. Still to do: Monday’s daily site report, today’s, and the delay notice. That one has to go out today.
The Plant Rooms business unit installs the plant room in the North Office Building itself: two ventilation units, a DN 50 heating circuit manifold and control cabinet ISP-02. The client is a main contractor, customer #1290.
The site manager has to be able to prove what the day cost. At 16:30, the evidence sits in three places:
In the messenger group23 photos from Monday and today, with no room and no BoQ item.
In the notebook7:30 to 10:30, eight fitters. The names are in the site diary app.
In memoryAll of Monday. Daily site report 060 is missing.
Until 21:00, the site manager writes up two reports from memory. The notice goes out on Wednesday, without photos. By then, 24 fitter hours and a crane lift are hard to prove.
Together that is 2,248 hours a year, about 1.3 full-time roles. A third of it, daily reports and snag lists, is written by the unit’s six project and site managers, often in the evening.
Daily reports in the evening, delays with no photo or time, defects on paper lists. Yet exactly these papers decide variations and acceptance.
A BoQ arrives as a GAEB file with hundreds of items. Every unit is selected again by hand, and the deadline is ticking.
The proof of equivalence is pieced together from five data sheets and a hygiene certificate. One value falls short, and the bid is out.
What demi does · An example
The site manager photographs the wall in the app. demi assigns photos 3 to 5 to project P-26-031, the 2nd-floor plant room and BoQ item 04.02.0010, with the time.
“Wall at unit 2 not plastered, eight men standing idle.” From the 7:36 voice note, demi logs the delay (start 7:30, eight fitters, taken from the hours in the site diary app) and drafts the delay notice under § 6(1) VOB/B with photos 3 to 5. At 7:45 the site manager approves it, and it goes to the main contractor.
Monday’s photos, hours and voice notes become daily site report 060. The site manager adds one line and approves it.
The main contractor instructs: unit 2 only after plastering, the crew onto the DN 50 heating pipework. demi updates the notice: downtime 7:30 to 10:30, eight fitters, a second crane lift. The delay on unit 2 lasts until the plastering is done. The site manager approves.
Last voice note: 38 m of DN 50 laid, 18 core holes instructed. demi drafts daily site report 061: weather, labour, plant, work done per BoQ item, delay, instruction.
The site manager reads it, changes one word and approves. Report, photos and the notified variation NT-07 are filed with the project.
Most daily site reports are routine: weather, labour, work done per BoQ item. That everyday case is what the calculation below counts: 30 minutes per report, 9 of them freed up. The evening until 21:00 and the second crane lift are left out.
Daily site report 061P-26-031 · Tue 10 Nov 2026
Nortavo site manager, approved 17:30seen by client
Clean air for operating theatres worldwide. From Ilmenau since 1921.
Glassblower Otto Nordhaus opens a workshop in Ilmenau for boiler and flow thermometers, for greenhouses and boiler houses. He etches his maker’s mark “Tavo” into every glass.
Nationalised. The workshop becomes a division of a state-owned building services enterprise and builds switch panels for heating plants.
Otto’s grandson Klaus Nordhaus buys the business back: 48 people, control cabinets for district heating substations. The first ventilation unit follows in 1995, for refurbishing schools.
Nordhaus and the old maker’s mark become the brand Nortavo, easy to say in Vienna and in Dubai. The same year, the first subsidiary abroad, in Vienna.
The first hygienic ventilation unit to VDI 6022, for an operating suite. Today Nortavo units run in operating theatres, cleanrooms and laboratories in more than 60 countries. The Wrocław plant follows in 2011.
The first air-to-water heat pump. Since 2024, only with the natural refrigerant R290.
Project companies in Dubai and, from 2019, in Riyadh: hygienic ventilation for new hospitals in the Gulf.
Lena Nordhaus takes over in the fourth generation. Since then, the company’s own crews have supplied and installed complete plant rooms, for hospitals, schools and offices.
Supply and installationFrom the four lines, Nortavo builds complete plant rooms, then installs, commissions and hands them over with its own crews.
Office <=> Job Site
demi can work at all 14 stations. Pick a use case and see which ones it touches.
The payoff
| Start | Use case | Volume per month | Share | Today per year | Freed up | Value per year |
|---|---|---|---|---|---|---|
| 1 | Daily site report from photos and voiceInstallation and site management | 60 × 30 min | 50% | 360 h | 108 h | €7,020 |
| 2 | Record site defects by photo and voiceInstallation and site management | 200 × 10 min | 50% | 400 h | 120 h | €7,800 |
| 3 | Match tenders to your productsBid office | 10 × 4 h | 50% | 480 h | 144 h | €9,360 |
| 4 | Price bills of quantities fasterEstimating | 8 × 8 h | 30% | 768 h | 138 h | €8,970 |
| 5 | Find the right public tendersSales | 40 × 30 min | 40% | 240 h | 58 h | €3,770 |
| Total | 2,248 h | 568 h | €36,920 |
Calculated for the Plant Rooms business unit in Ilmenau, not for the whole group. Of 2,248 hours, we count 568: volume times time times twelve months, then only the cautious share of that, times 0.6 for partly digital processes. That is about 0.3 full-time roles. Calculated at €65 per hour: €49.50 labour cost in manufacturing according to Destatis, plus workplace, IT and overheads. A number doesn’t fit your company? You can change every one of them in the configurator.
The start
| The first 90 days | Day 1 | Week 1 | Weeks 2 to 4 | Months 2 and 3 |
|---|---|---|---|---|
| Systems | ||||
| Site diary app, mailboxes | Photos, voice notes, hours and the site managers’ mailboxes, read-only | |||
| ERP, BoQ and estimating software | Read-only, via a small connector in their own network | |||
| Selection software, file share | Read-only | |||
| CRM, PDM and E-CAD, service planning | Read-only | |||
| Use cases | ||||
| 1 Daily site report | With approval. On every site by day 30 | |||
| 2 Site defects | With approval | |||
| 3 Tender matching | With approval | |||
| 4 BoQ pricing | With approval | |||
| 5 Finding tenders | With approval | |||
| Writing back | ||||
| Into the site diary and the BoQ software | After approval | |||
It needs only two sources, the site diary app and the site managers’ mailboxes, and delivers evidence from day 1: every delay with photo, time and BoQ item. With the unit selections demi reads from week 2, the work moves on to the bid office. There, each of the ten tenders a month currently takes four hours of matching against the product range, and that decides whether the bid stays in the running.
Rights
On a building site, one question comes first: who may see what? What only estimating sees in the ERP, only estimating sees in demi. And the main contractor sees its own project, no other.
A plant room starts as a bid, is prefabricated at the factory, installed on site and maintained by customer service. The org chart is laid out the same way.
26 + 24 + 14 + 30 + 18 + 144 + 46 + 28 = 330 people
| Who | Sites & projects | Quotes & prices | Costing & margins | Selection & design | Units & serial numbers | Staff & hours | Approves |
|---|---|---|---|---|---|---|---|
| Sales | reads | own customers | – | reads | reads | – | Bid or not |
| Bid office | – | edits | reads | reads | reads | – | Unit, equivalence |
| Estimating | reads | edits | edits | – | – | – | Price |
| Project and site managers | own site | reads | own project | reads | reads | own crews | Report, notice, snag list |
| Fitters in the app | own site | – | – | – | reads | own hours | – |
| Customer service | reads | reads | – | reads | edits | – | Commissioning, maintenance |
| HR | – | – | – | – | – | edits | – |
| Customer #1290 in the portal | own project | own | – | – | own units | – | Acceptance |
| Site diary agent, AI coworker | reads | – | – | – | reads | hours per site | Never |
| Matching agent, on someone’s behalf | As much as the person who starts it. No more. | Never | |||||
Every room has keys. They come from your systems and never multiply on their own.
Fitters see their site and their hours. Only estimating, the bid office and each site manager for their own project see margins. The main contractor sees its own project.
An agent carries the keys of the person it works for. An AI coworker has its own, and always a person who is accountable for it. Every access is in the log.
Data
An excerpt from Nortavo’s record.
Nothing gets replaced. Running a different ERP? demi connects to everything, from SAP and Oracle to the specialist software from the next town. At first, demi only reads. A person connects a system after seeing who will read what.
| Project P-26-031, North Office Building | ERP, order AB-26-0388 |
|---|---|
| Customer #1290, main contractor | CRM |
| Plant room, 2nd floor | File share, plant room drawing 2nd floor, revision c |
| ILZ 40 H, SN 26-1174 | ERP, serial number |
| 4,000 m³/h, heat recovery 78% | ILZ 40 data sheet, page 2. For SN 26-1174: unit selection A-25-0967 |
| ISO ePM1 55%, VDI 6022 | File share, ILZ 40 data sheet, page 2 |
| Heating circuit manifold DN 50, SN 26-1187 | ERP, serial number |
| Control cabinet ISP-02, SN 26-0932 | ERP, serial number. Circuit diagram: PDM and E-CAD |
| BoQ item 04.02.0010 | BoQ software, the main contractor’s BoQ |
| Daily site report 061 | Site diary app, approved 17:30 |
| Variation NT-07 | BoQ software, notified in report 061 |
Ventilation unit ILZ 40 · 4,000 m³/h · heat recovery 78% · ISO ePM1 55% · VDI 6022ILZ air handling unit series · Datenblatt ILZ 40.pdf
Customer #1290 is building the North Office Building. In the 2nd-floor plant room stands the ILZ 40 with SN 26-1174.
Who?
Customer #1290Main contractor, organisationK-1290-3The main contractor’s site manager, personOE-MB-02Installation crew 2, eight fittersNU-114Insulation subcontractorCRM, ERPbuilt for customer #1290
What kind?
ILZ 40 HVentilation unit, hygienic designHV DN 50Heating circuit manifold, four heating circuitsSCControl cabinet, BACnetSelection, PDMunits of these series
Which one exactly?
SN 26-1174ILZ 40 H, unit 1SN 26-1175ILZ 40 H, unit 2, in the laydown areaSN 26-1187Heating circuit manifoldSN 26-0932Control cabinet ISP-02ERPbelongs to this room
What’s going on?
BTB 061Daily site report of 10 NovBTB 060Daily site report of 9 Nov7:30–10:30Downtime, eight fittersSite diary appa day in this room
Where?
Plant room 2nd floor
File sharePlant room drawing 2nd floor, revision c
What applies?
AB-26-0388Order, supply and installationNT-07Variation, 18 core holesWV-1043Maintenance contract from acceptanceERP, BoQ softwareapplies to this room
What’s in writing?
Photos 3 to 5Wall at unit 2Voice note 7:36Start of the delayNotice 7:45under § 6(1) VOB/BDatenblatt ILZ 40.pdfPage 2App, mailboxesabout this room
What should it be?
04.02.0010Ventilation unit 4,000 m³/h, heat recovery min. 75%04.03.0040Steel heating pipe DN 50ISP02_LG1_TZUSupply air temperature, data pointBoQ software, E-CADrequirement for this room
What do we make of it?
F-26-11424 fitter hours and a second crane lift from the delay on 10 Nov, backed by photos 3 to 5demifinding on this room
At the pump maker, the pump with its serial number sits in the middle; at the machine builder, the line at the customer’s site; at the space supplier, the flight unit in orbit. At Nortavo, it is a room: the plant room, where factory, site and service come together. The grid stays, the middle changes.
“TZ 2.OG” in the site diary, “Technikraum Nord” in the messenger and room 2.014 on the drawing are the same room.
m³/h, l/s and “the 4000” become one value with a unit.
Every value shows its source, exact location and version. Unclear rows are kept too.
What stood in the plant room when the delay began.
After approval, report and notice land in the site diary and on the project.
Intelligence
AI coworker, accountable: head of installation
Works for the person who starts it
Works for the person who starts it
Works for the person who starts it
AI coworker, accountable: head of sales
The BoQ software sets the unit rate for every item, with Nortavo’s own all-in labour rate and mark-ups.
Calculations run on Nortavo’s own rules and data, not in the language model. Anything that goes out or is written back to a system is approved by a person.
The roadmap
Reports per serial number, maintenance contracts and the hygiene inspection to VDI 6022 every three years. demi schedules them from the record, and customer service sees every plant room Nortavo has ever built.
Every unit’s test report goes from the test rig PC into the record: leak tightness, refrigerant charge, electrical safety. From then on it stays with the serial number, for life.
Data point lists and BACnet objects come straight from the unit selection and the control cabinet, instead of being copied for each project.
Sources
Through 2026, Gartner expects organisations to abandon 60% of AI projects that lack AI-ready data.
Gartner · 2025 · on step 1, dataOpen the source (opens in a new tab)Share sensitive data in LLM apps on a least-privilege basis only, meaning just what a user or process needs.
OWASP GenAI Security Project · 2025 · on step 2, rightsOpen the source (opens in a new tab)70% of AI’s potential value sits in core functions such as sales, manufacturing and supply chain.
Boston Consulting Group · 2025 · on step 3, intelligenceOpen the source (opens in a new tab)In 20 minutes we show you demi on a case like yours: bring the data together, set the rights, let AI do the work.
Nortavo Gebäudetechnik GmbH & Co. KG is made up: a typical company in Construction & Building Services, not a real one. An estimate from our assumptions, not a promise. You can change every number in the configurator.