Today
Crushers, excavators and mills stand still for weeks when a long-lead part is missing. Spare-part stock is planned on gut feeling. Rush orders are expensive and still often arrive too late.
An example
Montanis Hartsteinwerke runs a BR-250 jaw crusher rated at 250 t/h. Its main bearing reaches the recorded replacement interval in about 9 weeks, and the lead time is 12 weeks. The agent proposes ordering now and recommends changing the Mn18 jaw plates in the same shutdown.
Your data, wherever it lives
Operating hours sit today in the excavators' telematics and in the controls of crushers and mills, the maintenance history in spreadsheets and on paper, BOMs and stock in the ERP, lead times in supplier e-mails. demi reads, understands and links it per machine to its wear parts, with your rights. The AI recalculates every day when each part is due for replacement and when to order it, and operations management decides on the order.
Where the data lives today
- Telematics
- Machines & sensors
- Office files
- Scans & paper
- ERP
- E-mails
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
Data sources in this case: the ERP, spreadsheets and e-mail. demi replaces nothing and joins operating hours, maintenance history, BOMs, stock and lead times into one record per machine, with its parts and their wear attached. demi writes back only after approval.
- 2 · PermitPermission Layer
Site managers see their machines. The operations manager approves orders above a value limit, and every approval is recorded.
- 3 · ActIntelligence Layer
The agent calculates expected demand by fixed rules from recorded operating hours and replacement intervals and proposes the order before the critical date. Every proposal shows hours, interval and lead time with their sources.
How it runs
- 1
demi reads operating hours and maintenance per machine.
- 2
The agent calculates when each wear part is due.
- 3
Stock and lead time are set against the due date.
- 4
Where time runs short, the agent proposes the order.
- 5
Once approved, the order goes back.
What changes
Less downtime from missing parts
Planned instead of rush purchases
Stock focused on critical parts
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+86 hfreed per year
Assumptions and calculation
demi works out part demand from operating hours, service history and lead times; you order.
6 h → 4.2 h per case
How we calculate
4 demand plans × 6 h × 30% × 1.0 (manual) × 12 months = 86 h
Value per year, before demi costs
Freed per year+86 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€5,590
gained per year
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Where do the operating hours come from?
From what you already have: hour meters from machine controls or telematics, entries in the ERP or the sites' spreadsheets. demi brings the values together per machine. How the data from the ERP gets to demi, we clarify in a conversation. Where values are missing, demi shows the gap.
Can it use the manufacturers' intervals?
Yes. Replacement intervals from manufacturer manuals can be stored, and your own maintenance history is added. If actual wear differs, for example with very hard rock, the agent shows both values side by side. You decide which one applies.
How are urgent orders handled?
If a part is already late, the agent marks it as urgent and names the options: stock at other sites or suppliers with shorter lead times. A rush order still goes through the normal approval; it just becomes visible earlier.
Does it work for a mixed fleet?
Yes. Excavators, crushers, screens and mills from different manufacturers are tracked per machine, each with its own BOM and intervals. demi recognises identical parts across machines and plans them together.