Skip to content
RabenhammerPrecision partsExample company

Rabenhammer Präzisionsteile GmbH (Germany), Schweinfurt, since 1957, 310 people, 72 CNC machines, around 550 lots a month

Getting started with AI · Metal & Machining

How a precision machining shop gets started with AI

Rabenhammer doesn’t exist. Everything else on this page will feel familiar.

demi turns your systems into one record, carries over your rights and lets AI agents prepare the routine work. First the data, then the rights, then the AI. A person always approves.

What five use cases free up

+896 h per yearEstimate, not a promise≈ $58,240 per year, calculated cautiously

Route cardProduction traveler

FA 26-114 · Lot L-26-114
PartW-3204 Shaft
Customer#6014
Customer drawing4471-220-03 Rev. D
Quantity500 pcs
Delivery dateFri Nov 27 wk 48
Material42CrMo4+QT Ø 50
Heat412873 or 412837?
Certificate3.1-26-118204
Goods receiptWE 26-1873
Process planningApprovedNov 16
Production controlReleasedwk 47
Goods inReceivedNov 17 6:20
Material inspection

pending

Operations for lot L-26-114 per routing AP W-3204/04
OpWork centerOperationSetupRunStamp
10SÄ 02Saw to 327 mm0.3 h0.8 min
20DZ 12Turn complete, sides 1 and 21.8 h4.2 min
30BAZ 07Mill keyway 10 P90.9 h1.1 min
40HardeningInduction-harden and temper bearing seats, 56 ± 2 HRC, SHD 1.5 +1LA 26-0211
50RI 01Straighten, runout ≤ 0.03, crack test0.4 h0.6 min
60AR 03Grind bearing seats Ø 40 k6, Ra 0.81.2 h2.6 min
70KMG 2Inspect to PP W-3204/D1 + 5 per 100
80VP 01Wash, preserve, pack0.2 h0.5 min

AP W-3204/04 · NC O4471printed Mon Nov 16, 2026, 15:10 · sheet 1/1

The route card of lot L-26-114 on Tuesday morning: three stamps, one field open. The inspector writes in heat, certificate and goods receipt by hand. Every value leads to its source.

The problem

Tuesday, 6:20 am: heat 412873 on the certificate, 412837 on the delivery note

Rabenhammer’s goods-in bay holds 2.6 t of 42CrMo4 Ø 50, 28 bars for lot L-26-114: 500 drive shafts W-3204 for customer #6014, a gearbox maker. The delivery date is Friday next week.

The goods-in inspector puts the 3.1 inspection certificate next to the delivery note and the bar tag. Material, size, weight: all correct. The heat number is not.

It is one of 19 certificates sitting in the mailbox this morning. The bars are already booked for the saw, and the early shift is waiting. Two digits swapped on the delivery note? Or the wrong material in the bundle?

If a mix-up like this slips through, it only shows up in the hardening shop or at the customer. By then, 500 shafts have been turned, milled and hardened.

Inspection certificate EN 10204-3.1No. 3.1-26-118204 · page 1 of 2

Excerpt from the certificate, with the field codes of EN 10168
A01ManufacturerBright bar mill, supplier L-207
A06PurchaserRabenhammer, Schweinfurt
A07OrderBE 26-0938, item 4
B02Material42CrMo4+QT+SH · 1.7225 · EN 10277
B07Heat412873
B08Quantity28 bars
B09DiameterØ 50 h10, peeled
B11Length6,000 mm
B13Mass2,590 kg
C11Yield strengthRp0.2 712 MPa
C12Tensile strengthRm 958 MPa
Z01Declaration of conformityConforms to the order
Z02Date of issueNov 12, 2026

PDF by email, Mon Nov 16, 16:02

Mill’s delivery note, item 428 bars 42CrMo4+QT Ø 50, heat 412837

Bar tag on the bundle1.7225 · Ø 50 · heat 412837

What happens here every month

  1. 400mill certificates
  2. 120requests with drawings
  3. 200measurement reports
  4. 80new and changed routings
  5. 158D reports

Together that is 4,180 hours a year, about 2.4 full-time roles. In estimating, a generational change is due by 2030: two of the four estimators are leaving, and with them the feel for what a shaft costs on each machine.

What hurts there

  1. 01
    Quotes drag on because costing knowledge is scattered

    What did the similar shaft cost in 2023? Which machine, which workholding, which cycle time? Estimators dig through old orders instead of doing the math.

  2. 02
    Material and tolerance questions land with the same people

    Machinability, hardness, surface finish: two or three old hands know the answers. While they are at the machine, the customer waits.

  3. 03
    Machine and tooling know-how isn’t in any system

    Cutting data, tool life, the tricks of individual machines: in setup sheets, spreadsheets and people’s heads. Every new part starts from zero at prove-out.

  4. 04
    Every lot has its pile of paper

    Certificate, measurement report, inspection plan and, with every complaint, the 8D report: typed up, compared, filed. The customer wants all of it, today.

What demi does · An example

The swapped digits are caught at goods in at 6:21, not in the hardening shop

  1. The delivery

    Goods in scans the delivery note and the bar tag and books 28 bars, 2,590 kg, against the purchase order. demi pulls in the certificate. It has been in the mailbox since Monday.

    WE 26-1873BE 26-0938
  2. The certificate, read

    Material, size, heat, chemical analysis and tensile test, every value with its field code. All properties are within the limits of EN ISO 683-2.

    3.1-26-118204
  3. Against order and delivery note

    Everything matches except one field: 412873 on the certificate, 412837 on the delivery note and the bar tag. Two digits swapped.

    F-26-047
  4. The draft

    demi proposes the inspection decision: the material stays blocked until the heat is cleared up. Plus the query to the mill and a note for op 10 on the route card.

    Query L-207L-26-114
  5. A look at the bar

    The inspector checks the end faces. Stamped in: 412873. He sends the query.

    Human checks
  6. The release

    The mill confirms heat 412873 and sends a new delivery note. The inspector hangs a new tag on the bundle and releases the material. The heat goes on the route card, the saw starts.

    Human approvesLog
The inspection comparison demi presents at 6:21
CharacteristicOrderCertificateDelivery noteResult
Material42CrMo4+QT​+SH42CrMo4+QT​+SH42CrMo4+QTmatch
SizeØ 50 h10Ø 50 h10Ø 50match
Quantity2.6 t2,590 kg2,590 kgwithin tolerance
Certificate3.13.1–match
Rm900 to 1,100958 MPa–within limits
Heat–412873412837mismatch

The order values come from the ERP, the limits from the material standard. demi calculates and compares; the language model only reads the PDF.

Where the error would show up otherwise

  1. GRGoods in
  2. Op 10Sawing
  3. Op 20Turning
  4. Op 30Milling
  5. Op 40Hardening
  6. Op 50Straight­ening
  7. Op 60Grinding
  8. Op 70Inspection
  9. Op 80Packing
  10. #6014At the customer

With demi: at goods in, at 6:21If it slips through: in the hardening shop or at the customer

Almost every certificate matches its purchase order, and with demi, goods in simply ticks it off. Only the inspection time saved that way goes into the calculation below: 3 minutes per certificate, not 500 rescued shafts.

Office Floor <=> Shop Floor

Where demi works at Rabenhammer: eight of 14 stations

demi can work at all 14 stations. Pick a use case and see which ones it touches.

Office Floor

  1. O1Market & customers 
  2. O2Request & drawing2
  3. O3Costing & quote2
  4. O5Process planning & CAM4
  5. O6Purchasing & material1
  6. O8Quality & complaints5
One record. Every fact runs both ways.

Shop Floor

  1. S1Goods in & certificates1
  2. S2Turning, milling, grinding4
  3. S4Metrology & inspection3
  4. S6Machines & tools 
  • demi works here
  • Next at Rabenhammer
  • demi can work here too
  • Line: the path of lot L-26-114, from the material order through goods in and production to the metrology room
RabenhammerPrecision partsExample company

Down to the hundredth. Since 1957.

On 72 CNC machines, Rabenhammer turns, mills and grinds shafts, flanges and housings

From the hammer forge to the ball-bearing town

  1. Four lathes in a Schweinfurt backyard: the founder, a trained turner, makes shafts and bushings on them for the town’s rolling-bearing and drive plants. The name comes from the hammer forge where his family worked iron.

  2. The company adds its own grinding shop. Bearing seats held to a few microns become its hallmark.

  3. A move to the edge of town: three halls for turning, milling and grinding, plus a climate-controlled metrology room.

  4. A five-axis cell with a pallet store mills housings at night too. Since 2024, rotor shafts for electric drives have joined the range.

  5. Two siblings run the business their grandfather founded. Rabenhammer makes parts to customer drawings, in lots from ten to ten thousand.

Profile

Founded
1957 in Schweinfurt am Main
People
310 in eight departments, 176 of them in production. All departments in the org chart
Machines
72 CNC machines: 34 lathes, 26 machining centers, 12 grinding machines. Plus three coordinate measuring machines
Shifts
Turning and milling in three shifts, grinding in two
Customers
Drives and gearboxes 28%, hydraulics 18%, bearings and linear technology 16%, automotive 14%, mechanical engineering 14%, other 10%
Revenue
€46 million, 75% of it in Germany
Per month
Around 120 requests with drawings, 550 lots, 700 delivery notes
Certified
ISO 9001, IATF 16949, ISO 14001
Systems
ERP, CAQ, MES, CAM, file share, mailboxes

Four part families, all to customer drawing

  • WShaftsØ 12 to 120 mm, ground bearing seats
  • FLFlanges and bushingsØ 40 to 400 mm
  • GHHousingsin gray iron, ductile iron and cast aluminum, H7 bores
  • HABrackets and milled partsfrom flame-cut blanks and flat bar

The payoff

Example calculation: five use cases free up 896 hours a year

≈ $58,240 per yearEstimate, not a promise
StartUse caseVolume per monthShareToday per yearFreed upValue per year
1Check mill certificates against the orderQuality, goods in400 × 10 min50%800 h240 h$15,600
2Cost turned parts straight from the drawingSales, estimating120 × 45 min30%1,080 h194 h$12,610
3Check measurement reports against the drawingQuality, metrology room200 × 20 min40%800 h192 h$12,480
4Routing and setup sheet from proven partsProcess planning, production80 × 60 min30%960 h173 h$11,245
5Pre-fill 8D reports with real case dataQuality, complaints15 × 3 h30%540 h97 h$6,305
Total4,180 h896 h$58,240

Of 4,180 hours, we count 896: volume times time times twelve months, then only the cautious share of that, times 0.6 for partly digital processes. That is about 0.5 full-time roles. Calculated at $65 per hour: $48.62 labor cost in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead. A number doesn’t fit your company? You can change every one of them in the configurator.

The start

How Rabenhammer starts: certificates first, then quotes

Which systems and use cases join in the first 90 days
The first 90 daysDay 1Week 1Weeks 2 to 4Months 2 and 3
Systems
Mailboxes, file shareGoods-in mailbox and drawing archive, read-only
ERPRead-only, via a small connector in their own network
CAQ, MESRead-only
CAMRead-only
Use cases
1 Mill certificatesWith approval. Part of daily work from day 30
2 Costing turned partsWith approval
3 Measurement reportsWith approval
4 Routing and setup sheetWith approval
5 8D reportsWith approval
Writing back
Into the CAQ and ERPAfter approval

Why the certificates come first

The certificates free up 240 hours a year for the goods-in inspectors. And the check is pure reading: the certificates arrive as PDFs by email, the purchase orders are in the ERP, the limits in the standard. The bars go to the saw only once the inspector releases them. Besides the routings, the quotes need the actual times from the MES, and the MES is connected from week 2.

What Rabenhammer does itself

  • Head of ITTwo days for the connections
  • Head of qualityOne hour a week
  • Incoming inspectionTwo weeks of reviewing drafts, alongside normal work

1Data

Six systems become one record

1,209entries
1,292links
6systems

An excerpt from Rabenhammer’s record.

AConnected

  • ERP
    Customers, requests, quotes, orders, routings, purchase orders, goods receipts, delivery notesThe price of the similar shaft from 2023 is in there. Only nobody can find it from the drawing
  • CAQ
    Inspection plans, measurements, complaints and 8D, gauges, supplier ratingManual measurements arrive on paper and get typed in
  • MES
    Confirmations per order and machine: setup and run times, good parts and scrap, downtimeThe actual times are there. Nobody compares them with the costing
  • CAM
    NC programs per part and machine, tools, cutting dataThe proven program version sits on one machine or a laptop
  • File share
    Customer drawings with revision, certificates, measurement reports, setup sheetsFive copies of one drawing. Which revision applies?
  • Mailboxes
    Requests, drawings, certificates, call-offs, complaintsWhether the customer accepts a deviation, only the mailbox knows

Nothing gets replaced. Running a different ERP? demi connects to everything, from SAP and Oracle to the specialist software from the next town. At first, demi only reads. A person connects a system after seeing who will read what.

BHeld together

The same lot. Six systems. Now one entry.
Lot L-26-114Source: ERP, FA 26-114, and MES
Part W-3204Source: ERP, item master
Customer #6014Source: ERP
Drawing 4471-220-03Source: File share
Revision DSource: Mailboxes, the customer’s mail #3318
Due date Nov 27, 2026Source: ERP, call-off wk 48
42CrMo4+QT Ø 50Source: ERP, item master W-3204
Certificate 3.1-26-118204Source: Mailboxes, mail of Nov 16
Heat 412873Source: certificate and bar end, confirmed on Nov 17
Routing AP W-3204/04Source: ERP
NC program O4471Source: CAM, for DZ 12
Inspection plan PP W-3204/DSource: CAQ
Quote #26-0412Source: ERP
Specified value, EN ISO 683-2Rm 900 to 1,100 MPa42CrMo4+QT, Ø over 40 up to 100 mm
Actual value, certificateRm 958 MPa3.1-26-118204, field C12

CLinked

Customer #6014 gets lot L-26-114: 500 shafts W-3204 from heat 412873, delivered on Nov 27.

Who?

Customers, contacts, teams

  • #6014Gearbox maker, customer since 2011
  • K-6014-2Buyer, person
  • OE-QS-WEIncoming inspection

ERPordered by customer #6014

What kind?

Parts and drawings

  • W-3204Drive shaft, own part number
  • 4471-220-03Customer drawing, revision D
  • AP W-3204/04Routing

ERP, file shareis a W-3204 to revision D

Made from?

Material and certificates

  • 412873Heat, 28 bars
  • 3.1-26-118204Inspection certificate
  • BE 26-0938Purchase order
  • WE 26-1873Goods receipt

Mailboxes, ERPmade from heat 412873

Made with?

Machines and tools

  • DZ 12Turning center
  • AR 03Cylindrical grinder
  • O4471NC program
  • RB W-3204/DZ12Setup sheet

MES, CAMruns on DZ 12

Which one exactly?

Lot L-26-114

500 shafts W-3204, due Nov 27, 2026

  • Its 28 bars come from heat 412873. That is what the certificate says, and what is stamped on the bar ends.

ERP, MESProduction order FA 26-114

What applies?

Quotes, call-offs, contracts

  • #26-0412Quote
  • RV-6014Framework agreement
  • Wk 48Call-off via EDI

ERPdelivered against the wk 48 call-off

What gets measured?

Inspection plans and measurements

  • PP W-3204/DInspection plan, 42 characteristics
  • MB 26-114-01Measurement report for the customer
  • KMG 2Coordinate measuring machine

CAQinspected to PP W-3204/D

What’s in writing?

Emails and shipping documents

  • Mail #3318Revision D from the customer
  • LA 26-0211Order to the hardening shop
  • LS 26-7714Delivery note to #6014

Mailboxes, ERPabout this lot

What do we make of it?

Findings

  • F-26-047Heat swapped on the delivery note and the bar tag, 412837 instead of 412873. Confirmed by the mill

demifinding on this lot

This is lot L-26-114 as it leaves the works on Nov 27. At the pump maker, the pump with its serial number sits in the middle; at the machine builder, the line at the customer’s site; at the space supplier, the flight unit in orbit. At Rabenhammer, it is the lot. The grid stays, the middle changes.

DWhat it can do

  • Recognize

    412873 and 412837 differ only by two swapped digits. Whether it is a typo or a second heat, the bar end decides.

  • Unify

    The labels Schmelze, Schmelzennummer, Cast No. and Heat No. become one field, however each mill names it.

  • Trace

    Every value shows its source, exact location and version. Unclear rows are kept too.

  • Look back

    If a complaint arrives in two years, demi shows what applied to lot L-26-114: drawing revision D, inspection plan PP W-3204/D, heat 412873.

  • Write back

    After approval, the inspection decision lands in the CAQ and the heat in the ERP.

2Rights

The org chart becomes the permission system

What only estimating sees in the ERP, only estimating sees in demi. And a customer sees only what belongs to their own parts and lots.

310 people, eight departments

Cost the part, write the routing, order the bars, turn, measure: for every lot, those are departments 1 to 5.

Management and administration 14Management 3 · Finance and controlling 5 · HR 3 · IT 3
  • 1Sales 12
    • Key accounts 3
    • Inside sales 5
    • Estimating 4
  • 2Process planning 31
    • Process planning and CAM 16
    • Scheduling 6
    • Fixtures, tool presetting 9
  • 3Purchasing and logistics 25
    • Purchasing 6
    • Goods in, stores 8
    • Shipping 11
  • 4Production 176
    • Turning 72
    • Milling 56
    • Grinding 26
    • Assembly, cleaning, packing 22
  • 5Quality 24
    • QM and complaints 6
    • Metrology room 10
    • Incoming inspection 4
    • In-process inspection 4
  • ·Maintenance 10
    • Mechanical 6
    • Electrical 4
  • ·Training 18
    • Trainers 2
    • Apprentices 16

14 + 12 + 31 + 25 + 176 + 24 + 10 + 18 = 310 people

Who opens which room

WhoDrawings & partsQuotes & pricesPurchase orders & goods inCertificates & measurementsComplaints & 8DNC programs & machinesHRApproves
Estimatingreadseditsreadsreadsreadsreads–Quote, price
Process planningedits–readsreads–edits–Routing, setup sheet
Purchasingreads–editsreads–––Purchase order
Incoming inspectionreads–readsedits–––Material inspection decision
Metrology roomreads––editsreadsreads–Measurement report
QM and complaintsreads–readsreadseditsreads–8D report
Setters (production)released only––reads–own machine–First-off part
HR––––––edits–
Customer #6014 in the portalown partsown–own lotsown––First article
Certificate agent, AI coworker––readsreads–––Never
Quote agent, on someone’s behalfAs much as the person who starts it. No more.Never

Every room has keys. They come from your systems and never multiply on their own.

Only the four estimators see machine hourly rates and costings. In the portal, a customer sees only their own parts, quotes, lots, certificates and complaints.

An agent carries the keys of the person it works for. An AI coworker has its own, and always a person who is accountable for it. Every access is in the log.

3Intelligence

Five agents do the work, people approve

  1. Certificate agent

    AI coworker, accountable: head of quality

    TriggerCertificate in the goods-in mailbox or a new goods receipt
    ReadsCertificate, purchase order, delivery note and bar tag scanned at goods in, limits from the material standard
    DoesCompares material, size, quantity, heat and properties, proposes the inspection decision, drafts the query to the mill
    ApprovalIncoming inspection
  2. Quote agent

    Works for the person who starts it

    TriggerSomeone in estimating starts it on a request with a drawing
    ReadsDrawing, similar parts, routings, actual times from the MES, machine hourly rates
    DoesReads material, fits, surface finishes and hardness from the drawing, finds similar parts, drafts operations and price
    ApprovalEstimating
  3. Measurement report agent

    AI coworker, accountable: head of metrology

    TriggerA lot has been inspected and is due to go to the customer
    ReadsDrawing with revision, inspection plan, CMM readings, manual measurements, hardness test
    DoesAssigns every value to its characteristic, compares it with the tolerance from the drawing, checks completeness and revision, builds the report in the customer’s format
    ApprovalMetrology room
  4. Setup agent

    Works for the person who starts it

    TriggerSomeone in process planning starts it for a new part
    ReadsSimilar parts, routings, setup sheets, NC programs, tool data, actual times
    DoesSuggests operations, tools and cutting data from proven parts. Every value names its source order
    ApprovalProcess planning, production setters
  5. 8D agent

    AI coworker, accountable: QM and complaints

    TriggerNew complaint in the CAQ
    ReadsLot, heat, certificate, machine data, measurements, earlier 8D reports
    DoesFills the first disciplines with facts: affected lots, stock at the customer and in-house, similar cases
    ApprovalQM and complaints

The quote agent prices a turned part with Rabenhammer’s machine hourly rates and the actual times from the ERP and MES.

Calculations run on Rabenhammer’s own rules and data, not in the language model. Anything that goes out or is written back to a system is approved by a person.

The roadmap

Next up: call-offs, hardening and shipping

  1. Call-offs and detailed scheduling

    Customers’ call-offs arrive via EDI, portal and email and land in the ERP, checked. Detailed scheduling sees material, setup sequence and hardening-shop dates in one picture and moves lots before a delivery date starts to slip.

    O4O7
  2. Hardening shops and coaters

    Orders to subcontractors, their delivery notes and hardening records flow into the lot. If the bearing seats measure 52 instead of 56 ± 2 HRC, the metrology room knows before the shafts are back.

    S3
  3. Shipping with proof

    Delivery note, certificate and measurement report go to the customer as one package, straight from the lot and ready for their portal.

    S5

Sources

Why data first, then rights, then AI

60%

Through 2026, Gartner expects organizations to abandon 60% of AI projects that lack AI-ready data.

Gartner · 2025 · on step 1, dataOpen the source (opens in a new tab)
Least privilege

Share sensitive data in LLM apps on a least-privilege basis only, meaning just what a user or process needs.

OWASP GenAI Security Project · 2025 · on step 2, rightsOpen the source (opens in a new tab)
70%

70% of AI’s potential value sits in core functions such as sales, manufacturing and supply chain.

Boston Consulting Group · 2025 · on step 3, intelligenceOpen the source (opens in a new tab)
RabenhammerPrecision partsExample company

Rabenhammer doesn’t exist. Your company does.

In 20 minutes we show you demi on a case like yours: bring the data together, set the rights, let AI do the work.

Rabenhammer Präzisionsteile GmbH is made up: a typical company in Metal & Machining, not a real one. An estimate from our assumptions, not a promise. You can change every number in the configurator.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases