Today
Mill certificates arrive as PDFs and are compared with the order and specification by eye. A wrong grade or a value out of range often only shows up in production, after parts have already been made from it.
An example
Rabenhammer Präzisionsteile receives 42CrMo4 round bar for W-3204 shafts with an EN 10204 3.1 certificate. The agent finds the tensile strength within limits but a heat number that differs from the delivery note. It puts the batch on hold until quality has decided.
Your data, wherever it lives
Mill certificates arrive today as PDFs by e-mail or through supplier portals, delivery notes often as scans, purchase orders sit in the ERP, material specifications and limits in the QM system, and everything is filed in the DMS. demi reads, understands and links them per batch and heat through to the finished part, with your rights. The AI checks grade, heat number and properties of every certificate in seconds instead of by eye, before parts are made from the material, and quality decides on every batch on hold.
Where the data lives today
- PDFs
- E-mails
- Web & portals
- Scans & paper
- ERP
- QM system
- DMS & archive
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
The case needs data from the ERP, DMS, e-mail and quality system. demi replaces nothing and links certificates, purchase orders, delivery notes, material specifications and heat numbers all the way to the finished part. demi writes back only after approval.
- 2 · PermitPermission Layer
Goods receipt and quality do the checks; only quality releases material on hold. Every hold and every release is recorded with its reason.
- 3 · ActIntelligence Layer
The agent extracts grade, heat number, chemistry and mechanical values and checks them deterministically against the order and the stored limits. The heat number must match the delivery note exactly, and every value points to its place in the certificate.
How it runs
- 1
Read in the certificate from e-mail or the supplier portal
- 2
Extract the values and match order and delivery note
- 3
Check them against the order and the stored limits
- 4
Put the batch on hold if it deviates and notify quality
- 5
Link the heat to the production orders
What changes
Every certificate checked, not just samples
Wrong material stopped at goods receipt
Traceability from heat to finished part
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+400 hfreed per year
Assumptions and calculation
demi checks grade, heat and values of each certificate against order and limits; you release.
10 min → 5 min per case
How we calculate
400 mill certificates × 10 min × 50% × 1.0 (manual) × 12 months = 24,000 min = 400 h
Value per year, before demi costs
Freed per year+400 h
Assumption: labor cost of $48.62 per hour in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead.
= Value per year, before demi costs
+$26,000
gained per year
400 h ÷ 1,760 h per role = 0.2 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Which certificate types can it read?
Mill and inspection certificates to EN 10204, such as 2.2, 3.1 and 3.2, as PDF, scan or file from a supplier portal. Different supplier layouts are not a problem. The agent flags uncertain readings for a check.
Does it check values against the standard?
Against the limits you store: from the material standard, your specification or the order. The comparison is deterministic, value against limit. For every deviation you see which limit applies and where it comes from.
How is a heat traced to the finished part?
demi links the heat number to goods receipt, storage location and the production orders that consume the material. When a complaint comes in, you see at once which heat a part came from and which other parts contain the same heat.
Who releases material on hold?
Only quality. The agent puts any deviation on hold and states why; a person decides on release or return. Both are recorded; demi writes back only after approval.
