Who?
Customers, contacts, teams
Customer #8019Injection moulder for sensor housings, customer since 2014K-8019-2Tool purchasing, a contact personOE-PLNorvelta project management
ERP, mailboxesordered by customer #8019
Getting started with AI · Tool & Mold Making
Norvelta doesn’t exist. Everything else on this page will feel familiar.
demi turns your systems into one record, carries over your rights and lets AI agents prepare the routine work. First the data, then the rights, then the AI. A person always approves.
Norvelta Formenbau GmbH · Lüdenscheid (Germany), since 1951, 180 people, about 1,100 tools in use at customers
What five use cases free up
+861 h per yearEstimate, not a promise≈ $55,965 per year, calculated cautiouslyOn the left, the tool as built. On the right, the part as the customer has wanted it since this morning. In between: 55 hours, a change quote and a week of machine bookings.
Change notice ÄM-2219-06
Affected
Effort, based on three similar changes
Impact
instead of Tuesday, Nov 24. Ties up SE-1 from Friday.
Change quote, €5,855 net: 55 h × €85 plus welding €1,180. Draft, for the project manager to approve.
The problem
At 7:05, Mail #4719 came in from customer #8019: housing 4471-310 is now at Rev. F. Two ribs move 1.5 mm, one side wall gets 0.3 mm thinner. The four core inserts of W-2219 are already hardened.
For the toolroom manager, that means 30 extra hours of sinker EDM, from Friday at the earliest, once the inserts are back from welding. Sinker EDM is at 112% of capacity; SE-1 and SE-2 are fully booked until Friday. If W-2219 moves up, W-2230 misses its T1 on Wednesday, Nov 25. Unless an EDM job runs unattended over the weekend.
The planning meeting is at 11:00. Until then, he has three sources:
On the whiteboardThe week’s machine schedule, as of Monday morning.
In the ERPYesterday’s time bookings, per tool, not per insert.
In two spreadsheetsThe milestones of all 34 tools and the cell’s night shift.
He works it out by hand and phones three foremen. At 11:00 he has one option, not two, and nobody knows what it does to W-2248.
4471-310_F.stp3D model, Rev. F
W-2219 Pos. 3 core insert, Rev. F
| Machine | Mon 16 | Tue 17 | Wed 18 | Thu 19 | Fri 20 | Sat 21 | Sun 22 | Wk 48 |
|---|---|---|---|---|---|---|---|---|
| HSC-1 | ||||||||
| HSC-2 | ||||||||
| Cell | ||||||||
| SE-1 | ||||||||
| SE-2 | ||||||||
| DE-1 | ||||||||
| Assembly | ||||||||
W-2219, the changed toolW-2230: slips if W-2219 moves up on SE-1. T1 Wed Nov 25Weekend: unattended only
Together that is 4,524 hours a year, about 2.6 full-time roles. And every change nobody bills comes out of Norvelta’s own pocket.
About 1,100 tools in use, each with its concept, sampling and corrections. When a similar request comes in, only the design engineer who did it back then knows where the file is and what is really in it.
Feasibility, comparable tools, EDM hours: every request lands in design. And design is tied up with the current tool projects. The faster competitor wins the order.
The customer’s revision, the design revision, the correction after T0, the repair on the running tool: what was built and what is documented drift apart. Pick the wrong one and you pay twice.
What demi does · An example
demi reads Mail #4719 and the 3D model and lays Rev. F over Rev. E: two ribs moved by 1.5 mm, one wall 0.3 mm thinner, a new revision mark.
The agent maps the change in 4-cavity tool W-2219 to positions 3 and 7, core and cavity inserts in 1.2343, four of each. Plus eight electrodes and six NC programs.
Three similar changes show the effort: 55 hours, 30 of them sinker EDM, plus external welding. The draft change quote is ready.
The planning solver recalculates the schedule, the agent explains it. A: W-2219 runs its EDM on SE-1 from Friday and carries on unattended on Saturday. W-2230 runs its EDM unattended on SE-2 on Saturday and Sunday, and its T1 holds. B: its T1 slips to Wednesday, Dec 2.
The toolroom manager picks A. The project manager approves the change quote. By 11:20, customer #8019 has the price and the new T1 date.
| Machine | Mon 16 | Tue 17 | Wed 18 | Thu 19 | Fri 20 | Sat 21 | Sun 22 | Wk 48 |
|---|---|---|---|---|---|---|---|---|
| SE-1 | ||||||||
| SE-2 | ||||||||
| Assembly | ||||||||
W-2219 Pos. 3, Rev. FWeekend: unattended
By hand, a planning round takes eight hours. Of those, the calculation below credits demi with only 86 minutes: 30% of the eight hours, times 0.6.
Steel on, steel off. Since 1951.
Embossing dies for buttons, badges and plaques: that is how an engraver from Lüdenscheid’s button industry starts out in his own workshop.
Norvelta builds its first compression molds for Bakelite switch covers, and from 1966 injection molds for thermoplastics.
A stamping die shop of its own: the same customer gets the progressive die for the contacts and the mold that overmoulds them.
The automated milling and EDM cell goes live. At night and at weekends it runs unattended.
When no one in the engraver’s family wanted to carry on, the head of design took over the firm. He trained here as a toolmaker and is now the owner. About 140 new tools a year, plus around 580 changes, repairs and inserts.
Office Floor <=> Toolroom
demi can work at all 14 stations. Pick a use case and see which ones it touches.
The payoff
| Start | Use case | Volume per month | Share | Today per year | Freed up | Value per year |
|---|---|---|---|---|---|---|
| 1 | Track customer changes to the toolEngineering | 20 × 2 h | 30% | 480 h | 86 h | $5,590 |
| 2 | Schedule the toolroom across all projectsProduction | 4 × 8 h | 30% | 384 h | 69 h | $4,485 |
| 3 | Build quotes from similar past ordersSales | 80 × 3 h | 30% | 2,880 h | 518 h | $33,670 |
| 4 | Job costing per order at a glanceManagement | 60 × 45 min | 40% | 540 h | 130 h | $8,450 |
| 5 | Plan mold maintenance by shot countService | 40 × 30 min | 40% | 240 h | 58 h | $3,770 |
| Total | 4,524 h | 861 h | $55,965 |
Of 4,524 hours, we count 861: volume times time times twelve months, then only the cautious share of that, times 0.6 for partly digital processes. That is about 0.5 full-time roles. Calculated at $65 per hour: $48.62 labor cost in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead. A number doesn’t fit your company? You can change every one of them in the configurator.
The start
| The first 90 days | Day 1 | Week 1 | Weeks 2 to 4 | Month 2 | Month 3 |
|---|---|---|---|---|---|
| Milestones | |||||
| As with a tool | T0First case runs, read-only | T1Cases 1 to 3 in daily use | AcceptanceWriting back to the ERP | ||
| Systems | |||||
| Mailboxes, tool files | Project mailbox and tool folders, read-only | ||||
| ERP with shop-floor data, CAD and PDM | Read-only, via a small connector in their own network | ||||
| CAM, cell controller | Read-only | ||||
| Metrology lab | Read-only | ||||
| Use cases | |||||
| 1 Customer changes | With approval. In daily use from week 4 | ||||
| 2 Scheduling | With approval | ||||
| 3 Quotes | With approval | ||||
| 4 Job costing | With approval | ||||
| 5 Mold maintenance | With approval | ||||
| Writing back | |||||
| Into the ERP | After approval | ||||
A change nobody bills comes straight out of the margin: ÄA-2219-06 alone is worth €5,855. The tool number is already in all three sources: the mailbox, the PDM and the ERP. demi only reads them and brings them together. From week 2, scheduling and quotes work on the same data, job costing as soon as the cell controller and CAM deliver the run times per insert.
1Data
An excerpt from Norvelta’s record.
Nothing gets replaced. Running a different ERP? demi connects to everything, from SAP and Oracle to the specialist software from the next town. At first, demi only reads. A person connects a system after seeing who will read what.
| Tool W-2219 | ERP, order since Jul 8, 2026 |
|---|---|
| Customer #8019, asset no. 70114582 | ERP, customer’s purchase order |
| Housing 4471-310, Rev. F | Mailboxes, Mail #4719 |
| Tool as built: Rev. E | PDM, released Oct 2, 2026 |
| Pos. 3 and 7, ×4 each | PDM, BOM W-2219 |
| 1.2343 ESR, 51 HRC | Tool file, hardening report H-26-1182 |
| Electrodes E-2219-031 to -038 | CAM, cell controller |
| Sinker EDM SE-1, 30 h | ERP, operation 40 |
| Change quote ÄA-2219-06 | ERP, approved Nov 17, 2026 |
| T1 Fri Nov 27, 2026 | ERP, milestone |
Customer #8019 gets W-2219, a 4-cavity hot-runner mold for housing 4471-310, built to Rev. F from today.
Who?
Customer #8019Injection moulder for sensor housings, customer since 2014K-8019-2Tool purchasing, a contact personOE-PLNorvelta project managementERP, mailboxesordered by customer #8019
What kind?
SW 4-HK4-cavity, hot runner with valve gatesPos. 3Core insert, ×4Pos. 7Cavity insert, ×4PDM, ERPis an SW 4-HK
Where?
SE-1SE-2Sinker EDMCellHSC-3 and SE-3, unattendedM3Tryout center, samplingERP, cell controllermade on SE-1 and SE-2
What’s going on?
T0Fri Nov 13, 2026, tryout center M3Op 40Sinker EDM, Pos. 3T1Fri Nov 27, 2026ERPoperation on this tool
Which one exactly?
Tool W-2219
ERPtool number = order
What applies?
ÄA-2219-06Change quote, €5,855#26-0958Quote for request A-26-0951, with W-2219 as the reference tool2nd thirddue at T1ERPquote for this tool
What’s in writing?
Mail #4719Rev. F with 3D modelÄM-2219-06Change noticeAB-2219-T0Sampling reportMP-2219-T0Inspection report, 42 featuresMailboxes, tool files, metrology lababout this tool
What should it be?
WR-8019 Rev. 4Customer’s tooling standard: standard parts, hot runner, cooling connections4471-310 FWall 1.7 mmTool filerequirement for this tool
What do we make of it?
F-26-102Left wall measures 2.02 mm at T0: for 1.7 mm, 0.32 mm of steel goes on, not 0.3demifinding on this tool
At the pump maker, the pump with its serial number sits in the middle; at the machine builder, the line at the customer’s site; at the space supplier, the flight unit in orbit. At Norvelta, it is the tool with its number. The grid stays, the middle changes.
W-2219, “the housing tool for #8019” and asset no. 70114582 are the same tool.
Revision, index and version become one change history per tool.
Every value shows its source, exact location and version. Unclear rows are kept too.
The tool as built, Rev. E. Not as it was quoted.
After approval, the change quote lands in the ERP.
2Rights
Anyone who can’t see costing in the ERP can’t see it in demi either. And a customer’s CAD data is visible only to those who need it for their work.
Department by department, a tool is costed, designed, scheduled, milled and spark-eroded, assembled and spotted, and finally sampled in the tryout center. After acceptance, it passes to tool service.
12 + 13 + 32 + 10 + 50 + 28 + 13 + 10 + 12 = 180 people
| Who | Tools at customers | Customer CAD data | Quotes & prices | Costing & actual hours | Schedule | HR | Approves |
|---|---|---|---|---|---|---|---|
| Costing | reads | reads | edits | edits, actual hours read-only | reads | – | Quote, price |
| Project managers | own tools | own tools | reads | own tools, otherwise hours only | reads | – | Change quote, date to the customer |
| Design and CAM | reads | edits | – | – | reads | – | Design revision, NC program |
| Toolroom management and scheduling | reads | reads | – | hours only | edits | – | Schedule, unattended weekend running |
| Parts manufacturing | – | per operation | – | – | reads | – | Time booking |
| Tool service | edits | reads | reads | hours only | reads | – | Maintenance date, repair quote |
| HR | – | – | – | – | – | edits | – |
| Planning agent, AI coworker | – | – | – | hours only | reads | – | Never |
| Engineering change agent, on someone’s behalf | As much as the person who starts it. No more. | Never | |||||
Every room has keys. They come from your systems and never multiply on their own.
A tool’s margin is visible only to costing and to the project manager in charge of it. Actual hours are also visible to anyone who plans or quotes a repair. A customer’s CAD data opens only for those who need it for their work, and in parts manufacturing only per operation.
An agent carries the keys of the person it works for. An AI coworker has its own, and always a person who is accountable for it. Every access is in the log.
3Intelligence
Works for the person who starts it
AI coworker, accountable: toolroom management
Works for the person who starts it
AI coworker, accountable: costing
AI coworker, accountable: head of tool service
Norvelta prices new tools with hourly rates per cost center, from milling to spotting, and standard parts at catalog price. Changes go into the quote at a single hourly rate, plus external work such as welding. Rates and prices sit in the ERP; the schedule is computed by a planning solver that demi connects.
Calculations run on Norvelta’s own rules and data, not in the language model. Anything that goes out or is written back to a system is approved by a person.
The roadmap
demi already reads the inspection reports. Next, sampling and corrections per cavity become a case of their own: assembly sees before T1 what stood out at T0.
Purchase orders, EN 10204 3.1 certificates and the heat treater’s dates are attached to the tool. If a heat treater’s date starts to slip, scheduling sees it the same day.
Fill simulations and concept decisions from earlier tools are ready for every new request: gating, cooling, ejection, and how it all turned out at sampling.
Sources
Through 2026, Gartner expects organizations to abandon 60% of AI projects that lack AI-ready data.
Gartner · 2025 · on step 1, dataOpen the source (opens in a new tab)Share sensitive data in LLM apps on a least-privilege basis only, meaning just what a user or process needs.
OWASP GenAI Security Project · 2025 · on step 2, rightsOpen the source (opens in a new tab)70% of AI’s potential value sits in core functions such as sales, manufacturing and supply chain.
Boston Consulting Group · 2025 · on step 3, intelligenceOpen the source (opens in a new tab)In 20 minutes we show you demi on a case like yours: bring the data together, set the rights, let AI do the work.
Norvelta Formenbau GmbH is made up: a typical company in Tool & Mold Making, not a real one. An estimate from our assumptions, not a promise. You can change every number in the configurator.