Skip to content
PolivoPlastic packagingExample company

Polivo UK Limited · Leeds, HQ Weißwasser/O.L. (Germany), since 1921, 1,800 people, 6 sites in 6 countries

Getting started with AI · Plastics & Packaging

How a plastics processor gets started with AI

Polivo doesn’t exist. Everything else on this page will feel familiar.

demi turns your systems into one record, carries over your rights and lets AI agents prepare the routine work. First the data, then the rights, then the AI. A person always approves.

What five use cases free up at the home plant

+385 h per yearEstimate, not a promise≈ $25,025 per year, calculated cautiously
BE 500TF 0420261401PET

Carton labelBatch 26-314-2-07Nov 10, 2026 · Shift 2 · TFA 07

What the base revealsBE-500-R50

Recycling code
01 PETA-PET with 50% rPET
Formulation
Date clock
11/26November 2026
Tool file
Cavity
14of 24, tool TF-0420
Tool file
Item
BE 500500 ml cup, customer item 7052-0500
ERP
Glass and fork
Food contactDoC BE-500-R50 v4
CAQ
Batch
26-314-2-07from the carton label
MES
Customer
#7052Deli, salads in 500 ml cups
ERP
The base of cup BE-500-R50 from batch 26-314-2-07, for customer #7052. Every value leads to its source.

The problem

Thursday, 5:40 am: two cavities on SGM 07 are flashing

In the injection molding shop of the Weißwasser home plant, 36 machines and around 120 molds are running. The toolroom works out when a mold is due for maintenance, from shot counts in the MES and intervals in a notebook. The ERP knows whether the spare inserts are in stock. Production planning knows when the next changeover window is coming. Nobody sees it all together.

Shift log SGM 07 · Early shift

  1. Flash on cavities 17 and 32, closure VS-38 T. Both cavities shut off, the mold is running on 46 of 48.Setter
  2. Shot counter at 6,412,880. Maintenance was due at 6,000,000, according to the toolroom’s notebook.Toolroom
  3. Spare inserts for cavities 17 and 32: not in stock. Lead time: three weeks.Stores
  4. The dairy, customer #7019, needs 1.2 million closures by Friday. It owns the mold, too.Scheduling
  5. Mold out. The toolroom reworks the inserts.Shift supervisor

The mold stands idle for 31 hours, 180,000 closures go to sorting, and on Friday the dairy gets a partial delivery. It had been due for three weeks. Only a notebook knew.

SG-3802Tool card

Closure VS-38 T, 38 mm, tethered · 48 cavities, valve-gated hot runner · on SGM 07, 350 t, 3.6 s cycle

1732

Cavity runningFlash, shut off: 17 and 32

Last maintenance5,000,000August 2026
Interval1,000,000shots
Shot counter on Thursday6,412,880412,880 shots past due. Mold owned by customer #7019

What happens every month at the Weißwasser home plant

  1. 40mold services
  2. 158D reports
  3. 10trace requests
  4. 30substance questionnaires
  5. 20recycled-content records

Together that is 1,740 hours a year, about 1.0 full-time roles. Twelve toolmakers keep the notebooks for the molds, and the four oldest of them retire by 2030.

What hurts there

  1. 01
    Setting know-how isn’t in any data sheet

    Which parameters really run stably on which machine with which mold: only the colleague who dialled in the item knows. If that colleague isn’t around, it’s trial and error again, and the machine stands idle.

  2. 02
    A mold’s history is scattered

    Shot counts in the MES, repairs in the notebook, spare inserts in the ERP, sample reports on the network drive. Anyone who looks it up often finds the state of two repairs ago.

  3. 03
    Every customer has its own specifications

    Brand owners bring their own portals, test specifications and questionnaires. Which formulation is approved for which customer, nobody can say at the push of a button.

The payoff

Example calculation: five use cases free up 385 hours a year

≈ $25,025 per yearEstimate, not a promise
No.Use caseVolume per monthShareToday per yearFreed upValue per year
1Plan mold maintenance by shot countToolroom40 × 30 min40%240 h58 h$3,770
2Pre-fill 8D reports with real case dataQuality15 × 3 h30%540 h97 h$6,305
3Trace batchesQuality and logistics10 × 2 h40%240 h58 h$3,770
4Answer customer substance questionnairesQuality, regulatory30 × 60 min40%360 h86 h$5,590
5Prove your recycled contentQuality, sustainability20 × 90 min40%360 h86 h$5,590
Total1,740 h385 h$25,025

Calculated for the Weißwasser home plant. Of 1,740 hours, we count 385: volume times time times twelve months, then only the cautious share of that, times 0.6 for partly digital processes. That is about 0.2 full-time roles. Calculated at $65 per hour: $48.62 labor cost in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead. A number doesn’t fit your company? You can change every one of them in the configurator.

What demi does · An example

The mold on SGM 07 is serviced during the color change, not in the middle of an order

The same autumn on SGM 07, with demi. Maintenance lands on the desk seven weeks earlier and fits into a stop that happens anyway.

  1. The alert

    demi works it out from the shots booked in the MES: SG-3802 will reach 6.0 million in about 30 days. The toolroom gets the alert, not the notebook.

    SG-3802MES SGM 07
  2. The mold’s file

    Insert of cavity 17 replaced in March, two flash reports on 17 and 32 since August. Spare inserts for both cavities: not in stock.

    Tool file SG-3802ERP stock
  3. The order

    demi drafts the purchase order for the inserts. The toolroom confirms, purchasing places the order. Three weeks’ lead time is now enough.

    Order proposalHuman approves
  4. The changeover window

    The inserts are in. On Thursday 15 October, SGM 07 changes color anyway. demi puts the maintenance into this stop, production planning approves.

    Changeover plan, week 42WA 26-1187
  5. The maintenance

    Nine hours during the color change instead of 31 hours in the middle of an order. Inserts 17 and 32 replaced, counter and file up to date. As the owner, the dairy gets the maintenance record; Polivo’s internal costs stay in-house.

    WA 26-1187Customer #7019
  6. That Thursday

    SGM 07 runs on 48 of 48 cavities. The 1.2 million VS-38 T closures for the dairy ship on Friday, in full.

    VS-38 TCustomer #7019

The 31 hours on SGM 07 are the costly exception: most mold maintenance jobs don’t save a delivery date. In the table above, each maintenance job is counted at just 30 minutes of planning.

PolivoPlastic packagingExample company

Every cup knows its month.

Polivo: world market leader in rPET dairy cups, in Weißwasser since 1921

Polivo makes cups, closures, trays and films for food and cosmetics, in plants in Germany, Poland and Czechia. In yoghurt and dessert cups made of food-contact rPET, the family company is the world market leader. Customers ask about recycled content, food contact compliance and approvals. The use cases and figures on this page are calculated for the home plant in Weißwasser.

From glass mold to cup

  1. For the glassworks of Weißwasser, at the time one of the largest glassmaking centers in the world, the mold maker Emil Voigt builds iron molds for pressed glass.

  2. Alongside the glass molds, the first polystyrene cups appear; in town they are soon just called “Poli-Voigt”. Every mold gets a date clock, the mold maker’s mark. Every mold still has one today.

  3. Ingrid Voigt, the founder’s granddaughter, buys back the business the GDR had nationalized in 1972. She gives it the cups’ old nickname: Polivo.

  4. The first thermoforming line starts up, for yoghurt cups that go to dairies in Saxony and Brandenburg.

  5. The first plant abroad: in Liberec, Polivo molds lids and closures. The Łódź plant for cups and trays follows in 2011.

  6. Polivo has extruded its own film since 2009, and since 2015 with rPET from registered recycling processes. That makes it the world market leader in dairy cups made of recycled material. By 2021, sales companies in Lyon, Leeds and Charlotte have joined.

  7. Jana and Martin Voigt run Polivo in the fourth generation: six sites in six countries, 1,800 people. The EU Packaging Regulation has applied since August, and every customer wants to know what is in their cup.

Profile

Founded
1921 in Weißwasser, as a mold shop for pressed glass, back in family hands since 1990
People
1,800 in the group: 260 at the Weißwasser home plant in eight departments, 146 of them in production (all in the org chart), 1,494 in the Łódź and Liberec plants, 46 in sales in Lyon, Leeds and Charlotte
Sites
Head office in Weißwasser/O.L. with the North plant (extrusion, thermoforming, cup printing) and the South plant (injection molding), plants in Łódź and Liberec, sales in Lyon, Leeds and Charlotte
Machines at the home plant
2 film lines, 8 thermoforming lines, 36 injection molding machines, 2 cup printers
Customers
Dairy and desserts 45%, meat and poultry 15%, deli and convenience food 12%, cosmetics 10%, fruit and vegetables 10%, household and other 8%
Markets
Germany 28%, rest of the EU 46%, North America 12%, UK 9%, rest of the world 5%. Export share 72%
Revenue
€390 million (group)
Per year
Group: around 110,000 t of plastic, around 12 billion parts. Weißwasser home plant: around 18,000 t, 2 billion parts, 30,000 batches
Systems
ERP, MES, CAQ, maintenance, dosing logs, warehouse management, mailboxes and customer portals

Locations

  • LeedsUnited KingdomSales, UK and IrelandPolivo UK Limited
  • Weißwasser/O.L.GermanyHead office, North and South plantsPolivo Kunststoffverpackungen GmbH & Co. KG
  • ŁódźPolandPlant: cups and traysPolivo Polska Sp. z o.o.
  • LiberecCzechiaPlant: lids and closuresPolivo CZ, s.r.o.
  • LyonFranceSales, FrancePolivo France SAS
  • CharlotteUnited StatesSales, North AmericaPolivo USA, Inc.

Four product lines

  • BECups and containersup to 50% rPET, thermoformed
  • VSLids and closures38 mm, tethered, moulded in 48-cavity tools
  • SLTraysfor meat in modified atmosphere, with EVOH
  • FOFlat filmPP, PS, PET, mainly for its own lines

Office Floor <=> Molding Floor

Where demi works at Polivo: eight of 14 stations

demi can work at all 14 stations. Pick a use case and see which ones it touches.

Office Floor

  1. O1Market & brand owners 
  2. O2Request & quote 
  3. O3Specification & customer portals4
  4. O7Purchasing & resin1 3 5
  5. O8Quality & complaints2 3 4 5
One record. Every fact runs both ways.

Molding Floor

  1. S2Thermoforming & injection molding1 2 3
  2. S3Toolroom & mold maintenance1
  3. S4Lab & testing2 4 5
  4. S5Warehouse & shipping3
  5. S6At the customer: filling2 3
  • demi works here
  • Next at Polivo
  • demi can work here too
  • Line: the path of batch 26-314-2-07, from the rPET pellets via customer #7052 to quality

The start

How Polivo starts: complaints first, then the batch, then the molds

Which systems and use cases join in the first 90 days
The first 90 daysDay 1Week 1Weeks 2 to 4Months 2 and 3
Systems
Mailboxes, customer portals, CAQQuality inbox, portals and CAQ, read-only
ERP, MESRead-only, via a small connector in their own network
Warehouse management, dosing logsRead-only
Maintenance, toolroom notebooksRead-only, notebooks scanned
Use cases
2 8D reportsWith approval. Part of daily work from day 30
3 TraceabilityWith approval
4 Substance questionnairesWith approval
1 Mold maintenanceWith approval
5 Recycled contentWith approval
Writing back
Into the ERP and the tool fileAfter approval

Why complaints come first

The 8D reports free up the most, 97 hours a year, and all demi has to do for them is read: the CAQ already knows every complaint with its batch and cavity, and from week 1 the MES adds the machine data. Traceability and questionnaires depend on stock movements and dosing logs, and those are in the record from week 2. Mold maintenance needs the toolroom’s notebooks. demi reads them in by week 4, and from month 2 the tool agent does the planning.

What Polivo does itself

  • Head of ITTwo days for the connections
  • Head of qualityOne hour a week
  • Quality engineersTwo weeks of reviewing drafts, alongside normal work
  • ToolroomThe last three years of notebooks, handed over for scanning

1Data

Seven systems become one record

1,262entries
1,370links
7systems

An excerpt from Polivo’s record.

AConnected

  • ERP
    Customers, items, formulations, orders, purchasing, stockThe price adjustment clauses sit in spreadsheets on the side
  • MES
    Orders on the machines, cycles, shot counters, scrap, downtimeHere a mold is just a resource; its history sits in free text
  • CAQ
    Complaints, 8D, inspection plans, cavity measurements, lab valuesDeclarations of compliance sit in folders as PDFs
  • Maintenance
    Mold cards, intervals, spare inserts, repairsThe real file is the toolmaker’s notebook
  • Dosing logs
    Resin, masterbatch, rPET and regrind per linePer line and shift, not per item
  • Warehouse management
    Pallets with SSCC, deliveriesBatch and pallet are linked only by the label
  • Mailboxes and customer portals
    Call-offs, specifications, questionnaires, complaintsEvery brand owner has its own portal

Nothing gets replaced. Running a different ERP? demi connects to everything, from SAP and Oracle to the specialist software from the next town. At first, demi only reads. A person connects a system after seeing who will read what.

BHeld together

BE 500TF 0420261401PET12345
The same cup. Seven systems. Now one entry.
1Formulation REZ-PET-50R-03, 01 PETDosing log, film line EXT 2, roll 26-1874
2Date clock 11/26Tool file TF-0420, set on 2 Nov
3Cavity 14 of 24, TF-0420Tool file, cavity measurement in the CAQ
4Item BE-500-R50ERP, customer item 7052-0500
5DoC BE-500-R50 v4CAQ, under Regulations (EU) 10/2011 and 2022/1616
Batch 26-314-2-07MES, order FA 26-04812
rPET lot R26-0918ERP goods receipt, certificate from the mailbox
Migration test 26-M-0412CAQ, lab report
15 pallets, each with its own SSCCWarehouse management
Customer #7052, LS 26-118733ERP, customer portal
Target value, specificationTop load ≥ 250 NSPEC 7052-0500 Rev. 06
Actual value, lab286 NCavity 14, sample from shift 2

CLinked

Customer #7052 receives batch 26-314-2-07: cups BE-500-R50 from the 24 cavities of tool TF-0420, with 50% rPET from lot R26-0918. This one comes from cavity 14.

Who?

Customers, contacts, teams

  • Customer #7052Deli food maker, customer since 2011
  • K-7052-3Quality manager, person
  • OE-QSQuality & regulatory

ERP, portalgoes to customer #7052

What kind?

Items and formulations

  • BE-500-R50500 ml cup, 50% rPET
  • REZ-PET-50R-03Formulation
  • SPEC 7052-0500Customer specification, Rev. 06

ERP, portalis a BE-500-R50 to formulation 03

Where?

Lines and tools

  • TFA 07Thermoforming line, North plant
  • TF-0420Thermoforming tool, 24 cavities
  • Cavity 14with date clock 11/26

MES, maintenanceformed on TFA 07

What’s going on?

Orders and tests

  • FA 26-04812Production order
  • PA 26-3318Top-load sample test

MES, CAQproduced in FA 26-04812

Which one exactly?

Batch 26-314-2-07

Cups from shift 2 on 10 November

  • The batch links resin, mold, pallet and customer, as does every one of the roughly 30,000 a year at the home plant.

MESbooked in shift 2

What applies?

Declarations and contracts

  • DoC BE-500-R50 v4Declaration of compliance
  • RV-7052-2026Framework agreement with price adjustment clause
  • RN 2026-Q4-7052Recycled-content record, Q4, due at quarter end

CAQ, ERPapplies to this batch

What’s in writing?

Reports, labels, emails

  • 26-M-0412Migration report
  • R26-0918Supplier’s rPET certificate
  • LS 26-118733Delivery note
  • Mail #5520Call-off for week 46

CAQ, warehouse, mailboxesabout this batch

What should it be?

Requirements

  • SPEC 7052-0500Top load ≥ 250 N
  • SPEC 7052-050050% rPET per quarter

Customer portalrequirement for this batch

What do we make of it?

Findings

  • F-26-044Top load at cavity 14 at the low end of the spread, keep watching

demifinding on this batch

At the pump maker, the pump with its serial number sits in the middle; at the machine builder, the line at the customer’s site; at the space supplier, the flight unit in orbit. At Polivo, it is the batch: a cup has no serial number, but it carries its cavity and its month, and its batch knows the day. The grid stays, the middle changes.

DWhat it can do

  • Recognize

    Cavity 14, impression 14 and “mold 0420/14” are one and the same.

  • Unify

    The labels Stauchwert, top load and axial load become one value in newtons.

  • Trace

    Every value shows its source, exact location and version. Unclear rows are kept too.

  • Look back

    The formulation actually dosed for this film roll, not the one in the master record.

  • Write back

    After approval, the hold and the purchase order land in the ERP.

2Rights

The org chart becomes the permission system

What only Quality sees in the ERP, only Quality sees in demi. Formulations stay in-house, even when a customer asks. And the owner of a customer mold sees its file, without Polivo’s costs.

260 people at the Weißwasser home plant, eight departments

The call-off arrives in inside sales, the finished pallet waits in the warehouse and every department in between has a hand in making the cup. The chart shows the home plant; the whole group has 1,800 people.

Management and staff functions 18Management 2 · Finance 6 · HR 4 · IT 4 · Assistants 2
  • 1Sales & customer service 16
    • Sales 6
    • Inside sales 7
    • Customer service 3
  • 2Application engineering 10
    • Product development 6
    • CAD & prototyping 4
  • 3Purchasing & planning 15
    • Purchasing 7
    • Production planning 8
  • 4Production 146
    • Extrusion 22
    • Thermoforming 58
    • Injection molding 52
    • Printing & decoration 14
  • 5Toolroom & maintenance 22
    • Toolroom 12
    • Maintenance 10
  • 6Quality & regulatory 18
    • Quality assurance 8
    • Lab 6
    • Regulatory & sustainability 4
  • 7Logistics 15
    • Warehouse 9
    • Shipping 6

18 + 16 + 10 + 15 + 146 + 22 + 18 + 15 = 260 people

Who opens which room

WhoFormulationsComplaints & 8DSpecifications & pricesTool filesCertificates & declarationsHRApproves
Sales & customer service–readsown customers–reads–Quote, price
Application engineeringeditsreadsspecificationsreadsreads–Formulation, first samples
Quality & regulatoryreadseditsspecificationsreadsedits–Hold, 8D, declaration
Toolroom–reads–edits––Mold maintenance
Production shift supervisorsown linereads–reads––First-off approval
Purchasing & planning––specificationsreadssuppliers–Purchase order, changeover window
HR–––––edits–
Customer #7019 in the portal–ownownown moldown–Repairs at its own cost
Tool agent, AI coworker–––reads––Never
Questionnaire agent, on someone’s behalfAs much as the person who starts it. No more, and never formulations in an answer.Never

Every room has keys. They come from your systems and never multiply on their own.

Only those who develop or test formulations see them. A customer sees its own complaints, its declarations and the file on its own mold.

An agent carries the keys of the person it works for. An AI coworker has its own, and always a person who is accountable for it. Every access is in the log.

3Intelligence

Five agents do the work, people approve

Like the maintenance board in the toolroom: every card is an agent, with its trigger, sources, work and the person who approves.

  1. Tool agent

    AI coworker, accountable: head of the toolroom

    TriggerEvery shot booking in the MES. Alerts as soon as the due date is less than 30 days away
    ReadsShot counter, tool file, faults, spare inserts in the ERP, changeover plan
    DoesPuts the maintenance into a changeover window before it falls due and drafts the order for missing inserts
    ApprovalToolroom, production planning
  2. 8D agent

    Works for the person who starts it

    TriggerA quality engineer starts it on a complaint from the customer portal
    ReadsComplaint, batch, machine data, cavity measurements, earlier 8D cases
    DoesFills D1 to D4 with sourced facts, finds similar past cases, suggests root causes
    ApprovalQuality engineer
  3. Batch agent

    AI coworker, accountable: head of quality

    TriggerSupplier notice, complaint or traceability test
    ReadsGoods receipt, dosing logs, production bookings, pallets, deliveries
    DoesFollows the batch forwards to the customer and backwards to the resin, lists pallets and deliveries, drafts the customer notices
    ApprovalHead of quality places and lifts the hold
  4. Questionnaire agent

    Works for the person who starts it

    TriggerA colleague from Regulatory & sustainability starts it on a questionnaire from a customer portal
    ReadsDeclarations of compliance, migration reports, certificates, approved answers
    DoesAnswers 55 of 64 questions with a source and flags 9 as open. Formulations never end up in an answer
    ApprovalRegulatory & sustainability
  5. Recycled-content agent

    AI coworker, accountable: head of regulatory & sustainability

    TriggerEnd of quarter or a customer request
    ReadsrPET goods receipts, supplier certificates, dosing logs, production quantities
    DoesCalculates the share per item by mass balance, checks every certificate for validity, drafts the declaration
    ApprovalHead of quality

AI coworker: its own keys, a person is accountable for itOn someone’s behalf: the keys of the person who starts it

demi works out a mold’s due date from the booked shots, the recycled content by mass balance from goods receipts and dosing logs, and affected quantities from pallets and deliveries.

Calculations run on Polivo’s own rules and data, not in the language model. Anything that goes out or is written back to a system is approved by a person.

The roadmap

Next up: call-offs, first samples and the film

  1. Call-offs and orders

    Around 600 call-off lines a month, and far from all of them come in by EDI. Inside sales scrapes the rest together from customer portals and emails. demi brings those lines into the ERP, checks every line against stock and the framework agreement and shows deviations before anyone confirms.

    O4
  2. First samples and customer changes

    A lighter cup, a new lid, a new IML decoration: demi puts together the initial sample inspection report from drawing, measurements and approvals and shows every change to mold and item.

    O6
  3. Changeover sequence and flat film

    Color and mold changes on 36 injection molding machines and eight thermoforming lines: demi proposes the changeover sequence for the whole week, not just the window for one maintenance job. On the film lines, demi shows for each roll how much trim skeleton flows back as regrind.

    O5S1

Sources

Why data first, then rights, then AI

60%

Through 2026, Gartner expects organizations to abandon 60% of AI projects that lack AI-ready data.

Gartner · 2025 · on step 1, dataOpen the source (opens in a new tab)
Least privilege

Share sensitive data in LLM apps on a least-privilege basis only, meaning just what a user or process needs.

OWASP GenAI Security Project · 2025 · on step 2, rightsOpen the source (opens in a new tab)
70%

70% of AI’s potential value sits in core functions such as sales, manufacturing and supply chain.

Boston Consulting Group · 2025 · on step 3, intelligenceOpen the source (opens in a new tab)
PolivoPlastic packagingExample company

Polivo doesn’t exist. Your company does.

In 20 minutes we show you demi on a case like yours: bring the data together, set the rights, let AI do the work.

Polivo Kunststoffverpackungen GmbH & Co. KG is made up: a typical company in Plastics & Packaging, not a real one. An estimate from our assumptions, not a promise. You can change every number in the configurator.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases