Skip to content
ArnsteinAutomotive · Rennertshofen plantExample company

Arnstein Automotive UK Limited · Coventry, since 1948, 38,000 people, 15 locations in 14 countries

Getting started with AI · Automotive Suppliers

How an automotive supplier gets started with AI

Arnstein doesn’t exist. Everything else on this page will feel familiar.

demi turns your systems into one record, carries over your rights and lets AI agents prepare the routine work. First the data, then the rights, then the AI. A person always approves.

+517 h per yearEstimate, not a promiseAbout $33,605 per year, calculated cautiously, from five use cases

KLT 6280 · Package 1 of 48VDA 4902 transport label

Unloading point · Location

Gate 7 · 1A-14

NDelivery note no.

26011648

Supplier

Arnstein Automotive SE, Rennertshofen plant, 86643 Rennertshofen

Net / gross weight

11.3 / 14.1 kg

No. of packages

48

PCustomer part no.

KS 7731 0412

QQuantity

24Call-off Wk 48 ×2

Description

ENGINE MOUNT BRACKET LH

Supplier part no.

AH-4380-LH

VSupplier no.

104417

Date

Revision

C

SPackage no.

418273095

HBatch no.

G26316-Z07

Examplemade up

Call-off 0047Customer #1611 wants 9,600 brackets in week 48 instead of 4,800. That means 400 labels like this one instead of 200.

The label on every small load carrier that leaves Arnstein. Every value leads to its source.

The problem

Monday, 6:25 am: call-off 0047 doubles week 48

Overnight, the new delivery call-off from customer #1611 came in by EDI. For bracket AH-4380-LH it now asks for 9,600 pieces in week 48; last week’s call-off said 4,800. The jump falls inside the production release, so it is binding.

There are 2,900 brackets in stock, enough for three days. Die 1187 has 9,200 shots left before maintenance. Whether that is enough has to be pieced together from three places:

In the ERPThe new call-off has overwritten the old one. No list shows what changed.

In an Excel fileShot count and maintenance of die 1187, kept by the die shop.

In the MESCell Z07, two cavities, 60 seconds per shot. When it will be free, only scheduling knows.

So far, the jump only surfaces on Wednesday, when the figures are reconciled. On the Friday of week 48, a special shipment then goes out for €1,850.

Incoming EDI · Delivery call-off VDA 4905

CustomerCustomer #1611, Plant 1 · unloading point Gate 7 · location 1A-14
Part numberKS 7731 0412 rev. C · AH-4380-LH
New call-off0047, dated
Old call-off0046, dated
Quantity per week in pieces, new against old
Week00460047Difference
Wk 474,8004,8000
Wk 484,8009,600+4,800
Wk 494,8004,8000
Wk 504,8004,8000
Wk 513,6003,6000
Wk 52000

Customer’s cumulative quantity received 216,960

Arnstein’s cumulative quantity shipped 218,112

Production release up to week 49 231,360 → 236,160

Material release up to week 52 239,760 → 244,560

Jump in week 48: +4,800 pieces, +100%, inside the production release

What happens here every month

  1. 200call-offs, checked in detail
  2. 158D reports
  3. 10trace requests
  4. 10first-article packages
  5. 4FMEAs

Together that is 2,524 hours a year, about 1.4 full-time roles. On top of that, around 1,100 delivery notes go out every month, each package with a label like the one above.

What hurts there

  1. 01
    RFQs with 300-page specifications

    Specification, corporate standards, drawings, logistics requirements: a team reads for days until feasibility is clear, and the quote deadline is short.

  2. 02
    Hunting down PPAP documents

    First-article report, process FMEA, control plan, IMDS entry: for every approval, Quality searches projects and drives for documents.

  3. 03
    Similar parts, designed from scratch

    The 2021 cast housing was almost identical. But nobody quickly finds its alloy, gating, die concept or the porosity problems it had back then.

What demi does · An example

By Monday noon, call-off 0047 is scheduled: two Saturdays, no special shipment

  1. The call-off

    New against old

    demi puts call-off 0047 next to 0046. One week jumps: week 48, +4,800 pieces, +100%. The cumulative quantities match, 1,152 pieces are in transit on delivery note LS 26011603, no backlog.

    Call-off 0047EDI
  2. The stock

    Three days on hand

    2,900 brackets are in stock; at 960 pieces a day, that lasts three days. Without an extra shift, week 48 is 4,800 pieces short.

    ERPAH-4380-LH
  3. Cell and die

    40 cell hours

    Cell Z07 casts two brackets per shot with die 1187, 120 pieces an hour. 4,800 more pieces mean 40 cell hours. Die 1187 stands at 140,800 shots; its next maintenance is due at 150,000. With the extra 4,800 pieces, it falls due at the end of week 49 instead of the end of week 50.

    Cell Z07Die 1187
  4. The proposal

    A plan, not an alarm

    demi drafts the plan: 40 cell hours on Z07 on Saturdays 21 and November 28, three shifts each, die 1187’s maintenance fixed for the Friday of week 49, production order FA-26-04112 raised by 4,800 pieces.

    Finding F-26-077
  5. The approval

    Three people say yes

    Customer logistics checks the proposal, the head of the foundry approves the Saturday shifts, the die shop confirms the maintenance. Then the updated production order goes into the ERP.

    Human approvesERP
  6. The notice

    No special shipment

    The shift schedule for the two Saturdays is up before noon. Approvals and every access are in the log.

    Log

Hardly any call-off doubles a week the way 0047 does. Of around 600 call-offs a month, customer logistics checks about 200 closely, ten minutes each. The calculation below counts three of those minutes per call-off, and the special shipment not at all.

Office Floor <=> Shop Floor

Where demi works at Arnstein: seven of 14 stations

demi can work at all 14 stations. Pick a use case and see which ones it touches.

Office Floor

  1. O2Call-off & EDI1
  2. O5Production launch & APQP4
  3. O6Drawing, FMEA & inspection plan4 5
  4. O7Purchasing & ingots 
One record. Every fact runs both ways.

Shop Floor

  1. S2Machining & assembly 
  2. S3Metrology, X-ray & first articles2 4
  3. S4Shipping, KLT & stores1 3
  4. S5Complaints & 8D2 5
  5. S6Customer & traceability3
  • demi works here
  • Next at Arnstein
  • demi can work here too
  • Line: bracket AH-4380-LH, from the call-off via shipping and the customer to the complaint, and back into the FMEA
ArnsteinAutomotive · Rennertshofen plantExample company

Cast, machined, ready to fit.

Rennertshofen plant: die-casting cells up to 3,200 tonnes, three shifts, more and more e-drive housings

At its Rennertshofen plant, Arnstein casts and machines aluminum brackets and housings and delivers them ready to fit, with wiring harness and seal profile, to car makers and large suppliers. Requests, first articles and 8D reports set the pace.

From light-metal foundry to listed group

  1. A foundryman who learned his trade in the old foundry halls of Ingolstadt founds Arnstein there as a light-metal foundry: sand and gravity die casting for farm machinery.

  2. The Rennertshofen plant is built in the business park on the Danube: six die-casting machines, 80 people. By then, Arnstein had been die-casting parts for the car industry since 1966.

  3. In-house CNC machining at Rennertshofen: the parts leave the plant ready to fit.

  4. Stock-market listing. In the years that follow come plants in Spain, France, Poland, the Czech Republic, the US and China; since 2014 the group has been a European company (SE).

  5. The first e-drive housing. Parts for combustion engines are being phased out; housings for e-axles are growing.

  6. 38,000 people at 15 locations in 14 countries. At the Rennertshofen plant: 14 cells from 840 to 3,200 tonnes, three shifts.

Profile

Founded
1948 in Ingolstadt
People
Group: 38,000 at 15 locations. Rennertshofen plant: 470 in eight departments, 118 of them in the foundry and 150 in machining and assembly. All departments in the org chart
Site
Rennertshofen plant, Neuburg-Schrobenhausen district: 14 die-casting cells, 46 machining centers, 6 leak-test stations, 3 assembly lines
Customers
Car makers 40%, makers of transmissions, e-drives and pumps 45%, trucks and off-highway 15%. 22 unloading points in Germany, the Czech Republic, Hungary and Poland
Revenue
group around €6.4 billion, Rennertshofen plant around €120 million
Works to
IATF 16949, ISO 14001, ISO 50001
Systems
ERP, EDI, CAQ, MES, PLM, customer portals, file share, mailboxes
The series part
Bracket AH-4380-LH, around 240,000 a year for customer #1611EN AC-43500T70.47 kgPPAP level 3

Locations

  • CoventryUnited KingdomPlantArnstein Automotive UK Limited
  • IngolstadtGermanyGroup headquartersArnstein Automotive SE
  • ZaragozaSpainPlantArnstein Automotive España S.L.U.
  • MulhouseFrancePlantArnstein Automotive France SAS
  • SpartanburgUnited StatesPlantArnstein Automotive North America, Inc.
  • ShanghaiChinaRegional HQ and R&DArnstein Automotive (Shanghai) Co., Ltd.
  • ShenyangChinaPlantArnstein Automotive (Shenyang) Co., Ltd.
  • GliwicePolandPlantArnstein Automotive Polska Sp. z o.o.
  • Mladá BoleslavCzechiaPlantArnstein Automotive CZ, s.r.o.
  • São Bernardo do CampoBrazilPlantArnstein Automotive do Brasil S.A.
  • PalmelaPortugalPlantArnstein Automotive Portugal, Unipessoal, Lda.
  • GothenburgSwedenR&DArnstein Automotive Sverige AB
  • TurinItalySales and R&DArnstein Automotive Italia S.p.A.
  • GqeberhaSouth AfricaPlantArnstein Automotive South Africa (Pty) Ltd
  • TangierMoroccoPlantArnstein Automotive Maroc SA

Four product lines

  • AHEngine and transmission brackets
  • AGHousings and covers
  • EGE-drive housings
  • BGAssemblies, ready to fit

The payoff

Example calculation: five use cases free up 517 hours a year

About $33,605 per yearEstimate, not a promise
StartUse caseVolume per monthShareToday per yearFreed upValue per year
1Check delivery call-offs without retyping200 × 10 min50%400 h120 h$7,800
2Pre-fill 8D reports with real case data15 × 3 h30%540 h97 h$6,305
3Trace batches and serial numbers10 × 2 h40%240 h58 h$3,770
4Assemble a complete first-article report10 × 8 h30%960 h173 h$11,245
5FMEA draft from complaints and past data4 × 8 h30%384 h69 h$4,485
Total2,524 h517 h$33,605

Of 2,524 hours, we count 517: volume times time times twelve months, then only the cautious share of that, times 0.6 for partly digital processes. That is about 0.3 full-time roles. Calculated at $65 per hour: $48.62 labor cost in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead. The €1,850 for the special shipment that is no longer needed comes on top. A number doesn’t fit your company? You can change every one of them in the configurator.

The start

How Arnstein starts: the call-offs first, then the CAQ and MES

Which systems and use cases join in the first 90 days
The first 90 daysDay 1Week 1Week 2⁠–⁠4Month 2⁠–⁠3
Systems
EDI and ERPCall-offs and stock, read-only
CAQ and MESRead-only, via a small connector in their own network
PLM, file shareRead-only
Customer portals, mailboxesRead-only
Use cases
1 Call-offsComparison from day 1. Part of daily work from day 30
2 8D reportsWith approval
3 TraceabilityWith approval
4 First articlesWith approval
5 FMEAWith approval
Writing back
Into the ERP and the CAQApproved call-offs, orders and 8Ds

Why the call-offs come first

Around 600 arrive every month, and 200 of them need a real look. From day 1, demi reads only the call-off, its previous version and the stock for the comparison. The cell schedule and die register follow with the MES and the file share by week 4. Nothing is written until someone approves. Along the way, the use case links customer part number, own part number, die and cell. That is exactly the link that 8D, traceability and first articles need later. From day 30, customer logistics finds every new call-off already compared in the morning.

What Arnstein does itself

  • Head of ITTwo days for the connections
  • Customer logisticsHalf a day to set the thresholds: when a jump gets flagged
  • Complaint managementTwo weeks of reviewing drafts, alongside normal work

1Data

Eight systems become one record

1,209entries
1,317links
8systems

An excerpt from Arnstein’s record.

AConnected

  • ERP
    Customers, part numbers, orders, stock, shipping, invoicesA new call-off overwrites the old one
  • EDI
    Delivery call-offs, JIT call-offs and advance shipping notices to VDA and EDIFACTA jump only shows when someone compares
  • CAQ
    Complaints, 8D, FMEA, inspection plans, first-article reportsThe 8D text is here, its evidence elsewhere
  • MES
    Shots, cycle time, die temperature, scrap, casting batches per cell200 values per shot, read only when a complaint comes in
  • PLM
    Drawings, models, revisions, casting simulationCustomer drawing and own drawing drift apart
  • Customer portals
    Complaints, sample submissions, supplier ratingsOne login per customer
  • File share
    Measurement reports, X-ray findings, the die register as an Excel fileOne PDF per batch
  • Mailboxes
    Questions from customers’ planners, specifications, changesThis is where the decisions are

Nothing gets replaced. Running a different ERP? demi connects to everything, from SAP and Oracle to the specialist software from the next town. At first, demi only reads. A person connects a system after seeing who will read what.

BHeld together

The same label. Eight systems. Now one entry.
Customer
Customer #1611, Plant 1ERP, customer master data
Unloading point Gate 7 · location 1A-14EDI, call-off 0047
Supplier no. 104417ERP, number at customer #1611
Part
KS 7731 0412, rev. CPLM, customer drawing rev. C
AH-4380-LHERP, item master data
11.3 kg = 24 × 0.47 kgPLM, drawing Z-AH-4380 C
24 pieces per KLT 6280ERP, packaging specification
Delivery
LS 26011648, 48 packagesERP, shipped on Nov 16, 2026
Package 418273095ERP, shipping, in the advance shipping notice to customer #1611
Casting batch
G26316-Z07MES, cell Z07, cast on Nov 12, 2026
Die 1187, cavity 2File share, die register
Melt batch S26-0889MES, melting shop
Customer’s cumulative quantity received216,960EDI, call-off 0047
Arnstein’s cumulative quantity shipped218,112ERP, 1,152 of them in transit on LS 26011603

CLinked

Customer #1611 calls off bracket AH-4380-LH, cast on die 1187 in cell Z07, shipped on delivery note LS 26011648.

Who?

Customers, contacts, teams

  • Customer #1611Car maker, Plant 1, organization with the relation “customer since 2009”
  • K-1611-2Customer’s material planner, person
  • OE-KLCustomer logistics at Arnstein

ERPcalled off by customer #1611

What kind?

Part numbers and drawings

  • KS 7731 0412Customer part number, rev. C
  • Z-AH-4380Drawing, rev. C
  • EN AC-43500Alloy, temper T7

PLM, ERPis rev. C

Where?

Cells and dies

  • Z07Die-casting cell, 840 t
  • Die 1187two cavities, 140,800 shots

MES, file sharecast on die 1187

What’s going on?

Call-offs and orders

  • Call-off 0047Week 48: 9,600 pieces
  • FA-26-04112Production order on Z07

EDI, ERPcalled off with 0047

Which one exactly?

AH-4380-LH

The bracket in series production

  • Around 240,000 a year, delivered in batches. Call-offs, casting batches, first articles and 8D reports all point to it.

ERP, PLMseries part since SOP 03/2025

What applies?

Approvals and contracts

  • EM-25-018First-article approval, rev. C, PPAP level 3
  • ÄM-26-118Customer change to rev. D
  • RV-1611-04Framework agreement until EOP 2032

CAQ, ERPapproved with EM-25-018

What’s in writing?

Delivery notes, labels, emails

  • LS 26011648Delivery note, 48 packages
  • 418273095Package with label
  • Mail #4471Planner’s query about week 48

ERP, mailboxesdescribes this delivery

What should it be?

Requirements

  • BDG P 202Porosity at the bearing bore
  • CSR-1611Customer-specific requirements

PLM, mailboxesapplies to rev. C

What do we make of it?

Findings

  • F-26-077Jump in week 48, maintenance of die 1187 moves to week 49

demifinding on this part

At the pump maker, the pump with its serial number sits in the middle; at the machine builder, the line at the customer’s site; at the space supplier, the flight unit in orbit. At Arnstein, it is the part number in series production, delivered in batches. The grid stays, the middle changes.

DWhat it can do

  • Recognize

    KS 7731 0412, AH-4380-LH and “ENGINE MOUNT BRACKET LH” are one part: in the call-off, in the ERP and on the label.

  • Unify

    Call-offs from EDI, portal and PDF get one format. Every old version is kept as a source.

  • Trace

    Every value shows its source, exact location and version. Unclear rows are kept too.

  • Look back

    Call-off 0046 next to 0047, revision C next to revision D: every version stays readable.

  • Write back

    After approval, the ERP takes over call-offs from portal and PDF and the updated production order; the CAQ takes the 8D draft.

2Rights

The org chart becomes the permission system

Sales sees the selling prices. What customer #1611 sends in confidence, specifications and prototypes, only the project team sees.

Rennertshofen plant: 470 people, eight departments

Management, administration and IT 24Management 2 · Finance 7 · HR 5 · IT 6 · Assistants 4

Sales, engineering, quality and logistics

  • Sales and projects 22
    • Sales and costing 12
    • Project management, APQP 10
  • Engineering and die shop 44
    • Part design and casting technology 18
    • Die making and die maintenance 26
  • Quality 44
    • Quality planning 10
    • Metrology, X-ray and CT 14
    • Complaint management 8
    • Supplier quality 4
    • In-line inspectors 8
  • Logistics and purchasing 44
    • Customer logistics 10
    • Materials planning and scheduling 8
    • Shipping and stores 14
    • Goods receipt 4
    • Purchasing 8

Plant

  • Foundry 118
    • Melting shop 14
    • Die-casting cells 78
    • Deburring and blasting 18
    • Heat treatment 8
  • Machining and assembly 150
    • Machining 92
    • Assembly and leak testing 58
  • Maintenance 24
    • Electrical 10
    • Mechanical 10
    • Building services 4

24 + 22 + 44 + 44 + 44 + 118 + 150 + 24 = 470 people

Who opens which room

WhoParts and drawingsCall-offs and deliveriesSelling prices and costingComplaints and 8DProcess and casting dataCustomer specificationsHRApproves
Sales and projectsreadsreadseditsreads–own project–Quote, price
Engineering and die shopedits––readsreadsown project–Drawing, die maintenance
Qualityreadsreads–editsreadsown project–Hold, 8D, first articles
Logistics and purchasingreadsedits–readscell and die only––Call-off, purchase order
Foundryreads––readsedits––Casting batch, extra shift
Machining and assemblyreads––readsedits––Inspection result at the line
HR––––––edits–
Customer #1611 in the portalownown–own–own–Sample submission
Call-off agent, AI coworkerreadsreads––cell and die only––Never
8D agent, on someone’s behalfAs much as the person who starts it. No more.Never

Every room has keys. They come from your systems and never multiply on their own.

Selling prices and costings are visible only to those who need them: Sales, Management and Finance. The call-off agent works with quantities and never sees a price.

An agent carries the keys of the person it works for. An AI coworker has its own, and always a person who is accountable for it. Every access is in the log.

3Intelligence

Five agents do the work, people approve

  1. Call-off agent

    AI coworker, accountable: head of customer logistics

    Trigger
    New call-off by EDI, from a portal or as a PDF
    Reads
    Call-off and previous version, cumulative quantities, stock, die register, cell schedule
    Does
    Compares with the previous version, flags jumps above the threshold, calculates stock coverage and cell hours, drafts extra shifts, die maintenance and the updated production order, plus the transfer of portal and PDF call-offs into the ERP
    Approval
    Customer logistics; the head of the foundry for extra shifts; the die shop when die maintenance moves
  2. 8D agent

    Works for the person who starts it

    Trigger
    Someone from complaint management starts it on a new complaint
    Reads
    Complaint in the CAQ, casting batches, the cell’s process data, inspection results, old 8D reports
    Does
    Pre-fills D1 to D4 with facts, proposes the containment action and shows similar past cases
    Approval
    Complaint management
  3. Traceability agent

    AI coworker, accountable: head of quality

    Trigger
    Complaint, notice from the ingot supplier, question about a casting batch
    Reads
    Melt and casting batches in the MES, delivery notes, packages, unloading points
    Does
    Narrows it down: which batches, which delivery notes, which customers. It shows gaps as gaps
    Approval
    Quality for the hold and the customer notice, customer logistics for replacement deliveries
  4. First-article agent

    Works for the person who starts it

    Trigger
    Someone from quality planning starts it on a new sample submission or a new revision
    Reads
    Drawing, measurement reports, inspection plan, process FMEA, control plan, IMDS entry
    Does
    Compiles the first-article report to PPAP level 3, finds the measured value for every drawing characteristic and flags every gap
    Approval
    Quality planning
  5. FMEA agent

    AI coworker, accountable: head of quality planning

    Trigger
    A new part in launch or a closed 8D report
    Reads
    Old FMEAs, 8D reports, field complaints, inspection plans
    Does
    Proposes failure modes, causes and actions, and shows ratings that contradict the complaint rate
    Approval
    FMEA team

For stock coverage, demi divides stock by daily demand; for cell hours, the quantity by the output from cycle time and cavities. Cumulative quantities come from EDI and shipping.

Calculations run on Arnstein’s own rules and data, not in the language model. Anything that goes out or is written back to a system is approved by a person.

The roadmap

Next up: RFQs, scheduling and the cell itself

  1. The RFQ with a 300-page specification

    RFQ-26-031 arrives with a specification, corporate standards and logistics requirements. demi finds the requirements that differ from the last cast housing and puts the costing of the similar part next to them.

    O1O3O4
  2. Call-offs straight into scheduling

    Today demi proposes the plan for one jump. Next, demi helps plan all 14 cells: every call-off lands in the cell schedule as a proposal, with die changes, die maintenance and shifts.

    O8
  3. The shot curve, before the customer complains

    The MES records 200 values per shot. demi flags when the shot curve or die temperature at a cell runs the way it did before the past case 8D-25-087.

    S1

Sources

Why data first, then rights, then AI

60%

Through 2026, Gartner expects organizations to abandon 60% of AI projects that lack AI-ready data.

Gartner · 2025 · on step 1, dataOpen the source (opens in a new tab)
Least privilege

Share sensitive data in LLM apps on a least-privilege basis only, meaning just what a user or process needs.

OWASP GenAI Security Project · 2025 · on step 2, rightsOpen the source (opens in a new tab)
70%

70% of AI’s potential value sits in core functions such as sales, manufacturing and supply chain.

Boston Consulting Group · 2025 · on step 3, intelligenceOpen the source (opens in a new tab)
ArnsteinAutomotive · Rennertshofen plantExample company

Arnstein doesn’t exist. Your company does.

In 20 minutes we show you demi on a case like yours: bring the data together, set the rights, let AI do the work.

Arnstein Automotive SE is made up: a typical group in the automotive supply industry, not a real one. An estimate from our assumptions, not a promise. You can change every number in the configurator.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases