Skip to content
TannriedFurniture works · MiesbachExample company

Tannried Möbelwerk GmbH (Germany), Miesbach, Upper Bavaria, since 1952, 230 people, around 400 production orders a month

Getting started with AI · Wood & Furniture

How a furniture maker gets started with AI

Tannried builds tables, cabinets, wall panels and chairs for offices, hotels and schools. Many variants, special requests in contract business and proof of origin for the wood.

Tannried doesn’t exist. Everything else on this page will feel familiar.

demi turns your systems into one record, carries over your rights and lets AI agents prepare the routine work. First the data, then the rights, then the AI. A person always approves.

What five use cases free up

+711 h per year
Estimate, not a promise≈ $46,215 per year, calculated cautiously

Cutting plan

SP 26-11-118

Saw
Panel saw 1
Date
, week 11
Job
26-0412, project OB 26-031
Material
Particleboard P2 19 mm, decor EH-04 light oak
Size
2,800 × 2,070 mm, stack of 3 boards
Trim
10 mm, kerf 4.4 mm
017Left side panel · 2,200 × 576018Right side panel · 2,200 × 576017Left side panel · 2,200 × 576024570 × 540024570 × 540024570 × 5400311,162 × 3000311,162 × 300R-0331447 × 3002,8002,0701234
PartDescriptionSize in mmEdgePer board
26-0412-03-017Left side panel2,200 × 576K1 front, K2 top/bottom2
26-0412-03-018Right side panel2,200 × 576K1 front, K2 top/bottom1
26-0412-03-024Shelf570 × 540K1 front3
26-0412-03-031Filler panel1,162 × 300K1 front2
R-0331Offcut, to the offcut store447 × 300none1

Yield 93.6%Offcut 2.3%Waste 4.1%Batch WE 26-1187, FSC Mix 70%Grain lengthwise

demi: job complete, cleared for the sawThe mirror doors are in, booked as WE 26-1204 on Monday at 6:02 am. On Feb 26, production planning had moved the job to week 11 to wait for them.Source: ERP goods receipt, release list week 10
Cutting plan SP 26-11-118: one board, eight parts, one offcut. The saw only gets the job once every part for the whole wardrobe is in.
TannriedFurniture works · MiesbachExample company

Whole buildings, furnished. Since 1952.

Tannried furnishes hotels, offices and schools, from one plant in the Alpine foothills and with its own fitters

Contract furniture and interior fit-out from a single source: from desks for an insurance company to a 118-room hotel, designed, built and installed by Tannried’s own people.

From a hamlet joinery to a furniture factory

  1. A joiner’s workshop in a hamlet in the Alpine foothills. It repairs farmhouse furniture and fits out guest rooms for the inns on Lake Tegernsee and Lake Schliersee.

  2. The first hotel series: wardrobes, beds and benches for the hotels that tourism in the Alpine foothills needs.

  3. A move to the Miesbach industrial estate and the first panel saw. School furniture for the new schools in the district.

  4. Office furniture for Munich’s office buildings and the first CNC machining center.

  5. Interior fit-out: wall panels and flame-retardant cladding for hotels and hospitals.

  6. A new hall with nesting CNC and an edgebander for zero-joint edges. The plant is heated with its own wood chips.

Profile

Founded
1952 in a hamlet in the Alpine foothills
People
230 in eight departments, 108 of them in production and 16 in on-site installation. All departments in the org chart
Sites
Miesbach plant with cutting, edging, CNC, solid wood and chair making, finishing, upholstery and assembly. Planning office in Munich
Customers
Offices and public administration 35%, mostly through dealers. Hotels 30%, schools and universities 20%, hospitals and care homes 10%, other 5%
Revenue
Around €40 million
Per month
Around 400 production orders, 100 wood deliveries, 40 special variants, 10 tenders
Certificates
FSC and PEFC chain of custody, ISO 9001 and 14001, test reports to EN 15372, EN 16121 and EN 1729
Systems
ERP with configurator, furniture CAD/CAM, cutting optimization, panel store, shop-floor data and production control, CRM, file share and mailboxes

Four product lines, one fully furnished building

  • TITablesConference, desk, sit-stand, pupil desk to EN 1729
  • SRCabinetsFiling cabinet, mobile pedestal, hotel wardrobe with luggage rack
  • PLWall panelsAcoustic, flame-retardant to B-s1,d0, headboards, counters
  • STChairsStacking chair in beech, pupil chair, hotel armchair

Interior fit-out and installationFrom these four lines, Tannried furnishes whole buildings and installs everything with its own people, floor by floor.

The problem

Thursday, 6:15 am: 14 jobs are due at the saw

Panel saw release list for week 10

JobProject and contentsQtyERPReality
26-0398Office building, desk TI-160060availablein stock
26-0401Secondary school, pupil desk size 6210availablein stock
26-0403Dealer, mobile pedestal RC-348availablein stock
26-0405Lakeside hotel, bedside table NT-45064availablein stock
26-0407Insurer, filing cabinet OH 536availablein stock
26-0409Hospital, wall panel PL-19 B-s1,d0140availablein stock
26-0411OB 26-031, desk TI-1400118availablein stock
26-0412OB 26-031, wardrobe KS-1200 with mirror door118availablemirror door not until week 11, edge K1 from Mon
26-0414OB 26-031, headboard PL-KT18118availablein stock
26-0418Care home, resident wardrobe SR-900 with mirror door40availablemirror door not until week 11
26-0421Town hall, coat cupboard SR-600 with mirror door12availablemirror door not until week 11
26-0424University, conference table TI 1,800 × 90030availableedge K1 missing
26-0426Dealer, sideboard SB-180020availablein stock
26-0430Vocational school, teacher’s desk TI-140014availablein stock

The “Reality” column isn’t in any system. The ERP counts anything on order as available.

Every Thursday, production planning releases next week’s jobs to the saw. Among them are 118 wardrobes for a new 118-room hotel, project OB 26-031, customer #1744. The hotel opens on 1 July.

The ERP says “available” 14 times. What’s really missing sits in three other places:

In purchasing’s inboxTuesday’s email from the mirror supplier: mirror doors not until week 11. It affects three jobs.

In the edgebanding storeK1, ABS 2 mm light oak: 80 meters on the roll, 26-0424 needs 360.

In the planners’ headsWhich job from week 11 can be brought forward so the saw doesn’t stand idle.

If they cut anyway, 170 half-finished carcasses sit in the buffer until the mirror doors arrive. And the hotel opens on 1 July.

What happens here every month

  1. 10tenders to check against the range
  2. 400production orders to release
  3. 10batches to trace
  4. 40special variants
  5. 10declarations of performance

Together that is 3,200 hours a year, about 1.8 full-time roles. Nearly half of it goes into special variants in engineering and planning.

What hurts there

  1. 01
    Contract tenders full of special requests

    Hotel, office, hospital: sizes, finishes, fire safety, emission class, test reports. Every line item is checked by hand against the product range.

  2. 02
    Proof of origin for every board

    FSC, PEFC and, from 30 December, the EU Deforestation Regulation: the evidence on wood species and origin sits with suppliers, in emails and in folders.

  3. 03
    Endless variants

    Fronts, edges, fittings, sizes: production planning knows which combinations can be built and which parts belong together. Sales doesn’t.

What demi does · An example

Planning releases 13 jobs and moves three to week 11

  1. The check

    Before the early shift, demi checks all 14 jobs: the BOM against the panel store, edgebanding store, fittings, bought-in parts and CNC programs.

    14 jobsWeek 10
  2. The email

    In purchasing’s inbox, demi finds Tuesday’s email from the mirror supplier. Three jobs turn red, each with the email as its source.

    26-041226-041826-0421
  3. The edge

    K1 light oak: 80 meters in stock, 360 needed, more arriving on Monday. 26-0424 turns amber: cutting yes, edging from Monday.

    26-0424
  4. The stand-in

    For the free hours at the saw, demi suggests two jobs from week 11 whose material is all in house.

    26-043326-0436
  5. The release

    Planning reads the list, opens two sources and releases 13 jobs. It moves the three red ones to week 11.

    Human approvesLog
  6. The message

    demi drafts the message to the OB 26-031 project manager: carcasses in week 11, installation of the first floor from week 14 as agreed. Planning sends it off.

    OB 26-031Customer #1744

Release check 26-0412OB 26-031 · Thu Feb 26, 2026

Boards
Particleboard P2 19 mm, EH-04 light oak, 144 boards, batch WE 26-1187
in stock
Back panel
HDF 8 mm white, in groove
in stock
Edge
K1 ABS 2 mm light oak, 1,420 m
from Mon
Fittings
Concealed hinge 110°, hanging rail, luggage rack
in stock
Mirror door
SPT-1200, 118 pcs. Supplier: week 11, email of Feb 24
missing
CNC
21 of 21 programs from CAD/CAM
ready
Proposal
Saw week 11, carcass assembly week 11, installation floor 1 from week 14 unchanged

Planning, seen 6:15moved to week 11

Half-finished carcasses in the buffer

Most jobs are complete, and planning only needs a quick look. So in the calculation below, only 2.4 of the ten minutes per production order are freed up.

The payoff

Example calculation: five use cases free up 711 hours a year

≈ $46,215 per yearEstimate, not a promise
StartUse caseVolume per monthShareToday per yearFreed upValue per year
1Match tenders to your productsEstimating and tenders10 × 4 h50%480 h144 h$9,360
2Spot missing parts before you release an orderProduction planning400 × 10 min40%800 h192 h$12,480
3Trace batches and serial numbersService and quality10 × 2 h40%240 h58 h$3,770
4Variant BOM from the customer's requirementsEngineering and planning40 × 3 h30%1,440 h259 h$16,835
5Declarations of performance from test resultsQuality10 × 2 h40%240 h58 h$3,770
Total3,200 h711 h$46,215

Of 3,200 hours, we count 711: volume times time times twelve months, then only the cautious share of that, times 0.6 for partly digital processes. That is about 0.4 full-time roles. Calculated at $65 per hour: $48.62 labor cost in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead. A number doesn’t fit your company? You can change every one of them in the configurator.

Office Floor <=> Shop Floor

Where demi works at Tannried: eight of 14 stations

demi can work at all 14 stations. Pick a use case and see which ones it touches.

Office Floor

Miesbach plant, Munich planning office
  1. O1Contract market & dealers 
  2. O2Request & sampling 
  3. O3Tender & room schedule1
  4. O4Quote & variant1 4
  5. O5Order & job 
  6. O6CAD/CAM & BOM4
  7. O7Wood purchasing & suppliers2
  8. O8Planning & release to the saw2
One record. Every fact runs both ways.

Shop Floor

Factory floor and site
  1. S3Quality, test reports & FSC3
  2. S4Goods in & shipping 
  3. S5Instal­lation, complaints & follow-up deliveries3
  • demi works here
  • Next at Tannried
  • demi can work here too
  • Line: the path of job 26-0412, from the room schedule via the BOM and the receipt of the mirror doors to the release to the saw

The start

How Tannried starts: origin first, because the deadline is fixed

From then on, the EU Deforestation Regulation applies to Tannried. When Tannried buys wood or boards from an importer, it needs the reference number of the importer’s due diligence statement. For its own imports, Tannried submits the statement itself. For every delivery, Tannried keeps a record of the supplier for five years. That is why use case 1 runs from day 1.

Which systems and use cases join in the first 90 days
The first 90 daysDay 1Week 1Weeks 2 to 4Months 2 and 3
Systems
Mailboxes, file sharePurchasing, goods in, certificates and test reports, read-only
ERP, panel storeRead-only, via a small connector in their own network
CAD/CAM, CRM, cutting optimizationRead-only
Shop-floor data and production controlRead-only
Use cases
1 TenderWith approval
2 Missing partsWith approval
3 TraceabilityWith approval
4 Variant BOMWith approval
5 Declarations of performance from test resultsWith approval
Writing back
Batch holds into the panel store, releases into the ERPAfter approval

Why origin comes first

It starts with two sources, the mailboxes and the file share, and from week 1 it adds the batch data from the ERP and the panel store. And it has a fixed deadline. Every delivery demi checks before then is cleanly tied to its batch on 30 December. The tender depends on the product range in the ERP, missing parts on the stock in the ERP and the panel store. demi knows both from week 2, and from then on these two use cases run as well. The variant BOM saves the most time, 259 hours a year, and still only comes in month 2: for that, demi needs the design rules from CAD/CAM.

What Tannried does itself

  • Head of ITTwo days for the connections
  • Head of quality and certificatesOne hour a week
  • Goods inTwo weeks of reviewing drafts, alongside normal work

Data

Eight systems become one record

1,278entries
1,410links
8systems

An excerpt from Tannried’s record.

AConnected

  • ERP with configurator
    Customers, quotes, jobs, BOMs, purchasing, stockThe rules live half in the configurator, half in the planners’ heads. Special parts are free-text lines
  • Furniture CAD/CAM
    3D models, parts lists, edge and drilling patterns, CNC programsParts have different names in CAD than in the ERP
  • Cutting optimization
    Cutting plans per board, offcut storeFed with ERP exports, fixed by hand in the morning
  • Panel store
    Stock by decor and thickness, panel batchesOnly the store knows the batch, the ERP doesn’t
  • Shop-floor data and production control
    Feedback per station, part labels, timesRework isn’t booked
  • CRM
    Projects, dealers, architects, tendersTenders live in mailboxes and on portals
  • File share
    Test reports, FSC and PEFC certificates, room schedules, drawingsEvery test report in five versions
  • Mailboxes
    Requests, changes, order confirmations, supplier emailsThis is where the importers’ reference numbers arrive

Nothing gets replaced. Running a different ERP? demi connects to everything, from SAP and Oracle to the specialist software from the next town. At first, demi only reads. A person connects a system after seeing who will read what.

BHeld together

Room schedule OB 26-031, room type BNew hotel, 118 rooms · customer #1744 · as of mock-up room sign-off
ItemDescriptionCompliancePer roomTotalSource
03.01Wardrobe KS-1200 with luggage rack and mirror doorE051118ERP, job 26-0412
03.02Desk TI-1400 with cable ductEN 153721118ERP, job 26-0411
03.03Headboard PL-KT18, upholsteredEN 1021-1/-21118CAD/CAM, upholstery
03.04Wall panel PL-19, oak veneerB-s1,d04472File share, classification report
03.05Bedside table NT-450E052236ERP
03.06Chair ST-21, stained beechEN 161391118ERP, chair making

Delivery floor by floor from week 14 · installation by Tannried · opening on 1 July

Required value, room schedule OB 26-031FSC-certified goodsClaim on every invoice
Actual value, batch WE 26-1187FSC Mix 70%Delivery note and invoice, panel mill L-114 on record

Table TI 1,800 × 900 · FSC · E05 · HPL · EN 15372Table TI product series · data sheet TI 1.800 × 900.pdf · job 26-0424, university

CLinked

Customer #1744 is building the new hotel OB 26-031 with 118 rooms. Each room has a KS-1200 from job 26-0412.

Who?

Customers, specifiers, suppliers

  • Customer #1744Hotel company, organization
  • K-1744-2Interior designer, person
  • L-208Mirror supplier
  • L-114Panel mill

CRM, ERPbuild and supply for this project

What kind?

Range and variants

  • KS-1200-KAWardrobe with luggage rack
  • TI-1400Desk with cable duct
  • EH-04Light oak decor

ERP, CAD/CAMfurniture from these series

Which one exactly?

Parts and batches

  • 26-0412-03-017Left side panel
  • WE 26-1187Panel batch, FSC Mix 70%
  • LA 26-221Lacquer batch for the PL-19 wall panels

Shop-floor data, panel storebuilt into this project

What’s going on?

Jobs and dates

  • 26-0412Wardrobes, saw week 11
  • SP 26-11-118Cutting plan
  • MA 26-0388-02Installation floor 2

ERP, production controlrunning for this project

Where?

OB 26-031

New hotel, 118 rooms, room type B

  • One building, 118 identical rooms, one room schedule. It turns into jobs, cutting plans and thousands of parts. Highlighted: floor 2, installation MA 26-0388-02.

CRM, file shareroom schedule, as of the mock-up room

What applies?

Quote, order, dates

  • AB-26-0388Order: furnishing for room type B
  • MZ-031Mock-up room, signed off on Jan 14
  • Week 14Floor-by-floor delivery starts

ERP, CRMapplies to this project

What’s in writing?

Emails, test reports, certificates

  • Email Feb 24Mirror doors not until week 11
  • PB 2025-1184Test report to EN 15372
  • FSCPanel mill’s certificate, checked

Mailboxes, file shareabout this project

What should it be?

Room schedule items

  • 03.01Wardrobe, 118 pcs
  • 03.04Wall panel B-s1,d0, 472 pcs
  • 1 JulyOpening

File sharerequirement for this project

What do we make of it?

Findings

  • F-26-077Mirror doors week 11: 26-0412 moves to week 11, installation from week 14 holds

demifinding on this project

At the pump maker, the pump with its serial number sits in the middle; at the machine builder, the line at the customer’s site; at the space supplier, the flight unit in orbit. At Tannried, it is the project: a hotel with its room schedule, which turns into jobs, cutting plans and parts. The grid stays, the middle changes.

DWhat it can do

  • Recognize

    “KS 1200”, “wardrobe type B” and item 03.01 are the same wardrobe.

  • Unify

    Running meters and 150-meter rolls become one value in meters, “the two-mil edge” becomes K1, ABS 2 mm.

  • Trace

    Every value shows its source, exact location and version. Unclear rows are kept too.

  • Look back

    Which panel batch and which lacquer batch went into floor 2, even five years from now.

  • Write back

    After approval, batch holds land in the panel store and releases in the ERP.

Rights

The org chart becomes the permission system

What only estimating sees in the ERP, only estimating sees in demi. The dealer sees its own jobs, the hotel its own project, no other.

230 people, eight departments

A hotel project starts on the left with the tender, runs through BOMs, panels, the saw and installation, and ends with the follow-up delivery after handover.

Management and staff functions 26Management 2 · Finance 5 · HR 3 · IT 4 · Quality and certificates 5 · Training 7
  • 1Sales and projects 28
    • Contract sales 8
    • Dealers, Munich office 4
    • Estimating and tenders 6
    • Project management 10
  • 2Engineering and planning 16
    • CAD/CAM, BOMs 9
    • Production planning 7
  • 3Purchasing and logistics 21
    • Wood purchasing, materials planning 5
    • Goods in 4
    • Shipping, own trucks 12
  • 4Production 108
    • Cutting, panel store 14
    • Edging and CNC 22
    • Solid wood, chair making 18
    • Finishing 16
    • Upholstery 10
    • Carcass and final assembly 28
  • 5On-site instal­lation 16
    • Installation management 2
    • Fitters 14
  • 6Service and follow-up deliveries 6
    • Complaints 3
    • Follow-up deliveries 3
  • 7Maintenance 9
    • Machines 6
    • Extraction, chip-fired heating 3

26 + 28 + 16 + 21 + 108 + 16 + 6 + 9 = 230 people

Who opens which room

WhoProjects & room schedulesQuotes & pricesCosting & marginsBOMs & CNCWood origin & certificatesHR & hoursApproves
Sales and projectseditsown projects–readsreads–Bid or no bid, dates
Estimating and tendersreadseditseditsreadsreads–Price, deviations
Engineering and planningreads––editsreads–Variant, release to the saw
Purchasing and logisticsreads–purchase pricesreadsedits–Purchase order, goods in
Quality and certificatesreads––readsedits–Batch hold, origin
On-site installationown project––reads–own hoursHandover per floor
Service and follow-up deliveriesreadsreads–readsreads–Follow-up delivery
HR–––––edits–
Dealer in the portalown jobsown prices––certificates–Purchase order
Customer #1744 in the portalown projectown––certificates–Acceptance
Origin agent, AI coworker––––reads–Never
Tender agent, on someone’s behalfAs much as the person who starts it. No more.Never

Every room has keys. They come from your systems and never multiply on their own.

For hotel project OB 26-031, the fitters see the room schedule and their own hours, the project manager sees the quote prices, and only estimating sees the margin. A dealer sees its own jobs and no others.

An agent carries the keys of the person it works for. An AI coworker has its own, and always a person who is accountable for it. Every access is in the log.

Intelligence

Five agents do the work, people approve

  1. Tender agent

    Works for the person who starts it

    TriggerSomeone from estimating and tenders starts it on a bill of quantities or a room schedule
    ReadsLine items, product range with variants, test reports, certificates, earlier quotes
    DoesMaps every line item to an article or a special variant and shows every gap with its page, such as B-s1,d0 required and no classification report for it
    ApprovalEstimating
  2. Release agent

    AI coworker, accountable: head of production planning

    TriggerThe saw’s release list, every Thursday at 5:30
    ReadsBOMs, panel store, edgebanding store, purchase orders, supplier emails, CNC programs
    DoesChecks every job, reports every blocker with its source and suggests what fits into the saw’s free hours
    ApprovalProduction planning
  3. Follow-up delivery agent

    Works for the person who starts it

    TriggerSomeone from service starts it on a complaint or a reorder
    ReadsJob, panel batches, veneer log, lacquer batch, edgeband batch, fittings, delivery notes per floor
    DoesFinds which batch went into which floor, narrows down the damage and prepares a color-matched follow-up delivery: same lacquer, same decor, veneer from the same log and the same panel batch, while stocks last
    ApprovalService; if there are costs, project management
  4. Variant agent

    Works for the person who starts it

    TriggerSomeone from engineering starts it on a customer request; for a hotel, after the mock-up room is signed off
    ReadsCustomer request, design rules, master articles, earlier special parts
    DoesDerives the variant with BOM, edge pattern and drilling pattern, and flags anything that breaks a rule: 32 mm grid, board thickness, hinges per door height
    ApprovalEngineering and planning

A variant’s part sizes, edge pattern and drilling pattern follow from the rules in the configurator and CAD/CAM, from the 32 mm grid to the number of hinges per door height.

Calculations run on Tannried’s own rules and data, not in the language model. Anything that goes out or is written back to a system is approved by a person.

The roadmap

After 30 December: offcuts, lacquer batches and the product passport

From the deadline on, the origin check runs every day. Next come three stations that still work without demi today.

  1. Offcuts with batch and origin

    Every offcut like R-0331 keeps its size, decor and batch. When the cutting optimization nests it into a new cutting plan, the FSC claim and the proof of origin go with it onto every new part.

    S1
  2. Lacquer batches and machine data

    Which lacquer batch, which edgebander, which CNC program: straight from shop-floor data and the finishing line onto the part. Then a follow-up delivery matches the first one straight away.

    S2
  3. Installed base and product passport

    What stands in every hotel, floor by floor, with batch and test report. It becomes the digital product passport as soon as the EU rule for furniture arrives.

    S6

Sources

Why data first, then rights, then AI

60%

Through 2026, Gartner expects organizations to abandon 60% of AI projects that lack AI-ready data.

Gartner · 2025 · on step 1, dataOpen the source (opens in a new tab)
Least privilege

Share sensitive data in LLM apps on a least-privilege basis only, meaning just what a user or process needs.

OWASP GenAI Security Project · 2025 · on step 2, rightsOpen the source (opens in a new tab)
70%

70% of AI’s potential value sits in core functions such as sales, manufacturing and supply chain.

Boston Consulting Group · 2025 · on step 3, intelligenceOpen the source (opens in a new tab)
TannriedFurniture works · MiesbachExample company

Tannried doesn’t exist. Your company does.

In 20 minutes we show you demi on a case like yours: bring the data together, set the rights, let AI do the work.

Tannried Möbelwerk GmbH is made up: a typical company in Wood & Furniture, not a real one. An estimate from our assumptions, not a promise. You can change every number in the configurator.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases