Getting started with AI · Construction & Building Services

How a building services maker gets started with AI

What five use cases free up

+568 h per year
Estimate, not a promise≈ $36,920 per year, calculated cautiously

Nortavo is the world market leader in hygienic ventilation units for operating theatres and laboratories. In its Plant Rooms business unit in Ilmenau, Nortavo builds ventilation units, heat pumps, heating circuit manifolds and control cabinets, and its own crews install them as complete plant rooms on site. Bills of quantities, certificates and daily site reports eat up the week.

Nortavo doesn’t exist. Everything else on this page will feel familiar.

demi turns your systems into one record, carries over your rights and lets AI agents prepare the routine work. First the data, then the rights, then the AI. A person always approves.

Bill of quantities

Page 14 of 62

West School Campus, new sports hall and refurbishment of Building B · Lot 02 ventilation and air conditioning, supply and installation

Tender ref.
26-0112
Tenders due
02.03Air handling units
02.03.0010
Air handling unit, supply/extract 4,000 m³/h with heat recovery, hygienic design

Supply, bring in, set up and connect ready for operation. Sectional casing, indoor installation. Air flow supply/extract 4,000/4,000 m³/h. External static pressure 400/350 Pa. Heat recovery with cross-counterflow plate heat exchanger, dry temperature ratio min. 80% to DIN EN 13053. Outdoor air filter ISO ePM1 55%, extract air ISO ePM10 60%. Casing to DIN EN 1886: D1 (M), L1 (M), T2, TB2, F9. Hygienic design to VDI 6022 Part 1, enclose the declaration of hygiene conformity. EC fans, plug type. Ecodesign (EU) 1253/2014, Tier 2 (2018).

Reference product: as per design documents, Annex 7, or equivalent. Submit proof of equivalence with the bid.

Product offered: Nortavo Type: ILZ 40 H, XL plate

6 nr
02.03.0020
Weather louvre, outdoor air, 1,000 × 630 mm
6 nr
demi: 17 of 18 values metTemperature ratio 78% with the standard plate, 80% required. So demi selects the XL plate option, which gives 81%. Estimating fills in the prices.Source: unit selection A-26-1874, ILZ 40 data sheet, page 2
Page 14 of the West School Campus tender. demi fills the bidder’s blanks with a Nortavo unit. Every value leads to its source.

The problem

Tuesday, 7:30 am: eight fitters stand idle at an unplastered wall

  1. North Office Building, 2nd floor. 3 °C, drizzle. The mobile crane lifts the first ILZ 40 ventilation unit through the façade opening into the plant room.

    Photo 16:52
    Photo 37:34
  2. Unit 2’s spot: the wall is not plastered. Once the unit is in place, no plasterer can get behind it. Unit 2 stays in the laydown area, and at 7:45 the crane leaves. Eight fitters wait.

  3. The site manager calls the main contractor’s site team. The photos go into the site’s messenger group.

  4. The main contractor instructs: unit 2 only after plastering. The crew moves over to the DN 50 heating pipework. Three hours are gone, and a second crane lift is now needed.

  5. End of the day. Still to do: Monday’s daily site report, today’s, and the delay notice. That one has to go out today.

The Plant Rooms business unit installs the plant room in the North Office Building itself: two ventilation units, a DN 50 heating circuit manifold and control cabinet ISP-02. The client is a main contractor, customer #1290.

The site manager has to be able to prove what the day cost. At 16:30, the evidence sits in three places:

In the messenger group23 photos from Monday and today, with no room and no BoQ item.

In the notebook7:30 to 10:30, eight fitters. The names are in the site diary app.

In memoryAll of Monday. Daily site report 060 is missing.

Until 21:00, the site manager writes up two reports from memory. The notice goes out on Wednesday, without photos. By then, 24 fitter hours and a crane lift are hard to prove.

What happens in the Plant Rooms business unit every month

  1. 60daily site reports
  2. 200defects on walk-throughs
  3. 10tenders to match against the product range
  4. 8bills of quantities to price
  5. 40contract notices to check

Together that is 2,248 hours a year, about 1.3 full-time roles. A third of it, daily reports and snag lists, is written by the unit’s six project and site managers, often in the evening.

What hurts there

  1. 01
    Site paperwork is written from memory

    Daily reports in the evening, delays with no photo or time, defects on paper lists. Yet exactly these papers decide variations and acceptance.

  2. 02
    Every bill of quantities starts from zero

    A BoQ arrives as a GAEB file with hundreds of items. Every unit is selected again by hand, and the deadline is ticking.

  3. 03
    “Or equivalent” must be proven

    The proof of equivalence is pieced together from five data sheets and a hygiene certificate. One value falls short, and the bid is out.

What demi does · An example

Delay on record at 7:40, report approved at 17:30

  1. The photos

    The site manager photographs the wall in the app. demi assigns photos 3 to 5 to project P-26-031, the 2nd-floor plant room and BoQ item 04.02.0010, with the time.

    Photos 3 to 5P-26-031
  2. The notice

    “Wall at unit 2 not plastered, eight men standing idle.” From the 7:36 voice note, demi logs the delay (start 7:30, eight fitters, taken from the hours in the site diary app) and drafts the delay notice under § 6(1) VOB/B with photos 3 to 5. At 7:45 the site manager approves it, and it goes to the main contractor.

    Voice note 7:36Customer #12907:45
  3. Monday

    Monday’s photos, hours and voice notes become daily site report 060. The site manager adds one line and approves it.

    BTB 060
  4. The instruction

    The main contractor instructs: unit 2 only after plastering, the crew onto the DN 50 heating pipework. demi updates the notice: downtime 7:30 to 10:30, eight fitters, a second crane lift. The delay on unit 2 lasts until the plastering is done. The site manager approves.

    F-26-11410:45
  5. End of the day

    Last voice note: 38 m of DN 50 laid, 18 core holes instructed. demi drafts daily site report 061: weather, labor, plant, work done per BoQ item, delay, instruction.

    BTB 061NT-07
  6. The approval

    The site manager reads it, changes one word and approves. Report, photos and the notified variation NT-07 are filed with the project.

    Human approvesLog

When the paperwork is done

Most daily site reports are routine: weather, labor, work done per BoQ item. That everyday case is what the calculation below counts: 30 minutes per report, 9 of them freed up. The evening until 21:00 and the second crane lift are left out.

Daily site report 061P-26-031 · Tue Nov 10, 2026

Site
North Office Building, plant room and ventilation · Client: customer #1290
Working hours
6:30 to 16:30
Weather
7:00 3 °C, drizzle until 10:00 · 12:00 8 °C, overcast · wind 3 Bft
Labor
1 site manager, 8 fitters
Plant
Mobile crane 60 t (hired) 6:15 to 7:45, one lift instead of two
Work done
04.02.0010 ILZ 40 H, unit 1 of 2, SN 26-1174, brought in and set. 04.03.0040 Steel heating pipe DN 50, 38 m laid
Delay
Wall at the unit 2 position not plastered. Downtime 7:30 to 10:30, 8 fitters, photos 3 to 5. The delay on unit 2 lasts until the plastering is done. Notice under § 6(1) VOB/B at 7:45, updated at 10:45, both by email
Instruction
Unit 2 only after plastering, crew on 04.03.0040 from 10:30. 18 extra core holes DN 100, drawing revision c. Variation NT-07 notified

Nortavo site manager, approved 17:30seen by client

NortavoBuilding servicesExample company

Clean air for operating theatres worldwide. From Ilmenau since 1921.

Nortavo: world market leader in hygienic ventilation units, family-owned in the fourth generation

From boiler thermometer to clean air in the operating theater

  1. Glassblower Otto Nordhaus opens a workshop in Ilmenau for boiler and flow thermometers, for greenhouses and boiler houses. He etches his maker’s mark “Tavo” into every glass.

  2. Nationalized. The workshop becomes a division of a state-owned building services enterprise and builds switch panels for heating plants.

  3. Otto’s grandson Klaus Nordhaus buys the business back: 48 people, control cabinets for district heating substations. The first ventilation unit follows in 1995, for refurbishing schools.

  4. Nordhaus and the old maker’s mark become the brand Nortavo, easy to say in Vienna and in Dubai. The same year, the first subsidiary abroad, in Vienna.

  5. The first hygienic ventilation unit to VDI 6022, for an operating suite. Today Nortavo units run in operating theatres, cleanrooms and laboratories in more than 60 countries. The Wrocław plant follows in 2011.

  6. The first air-to-water heat pump. Since 2024, only with the natural refrigerant R290.

  7. Project companies in Dubai and, from 2019, in Riyadh: hygienic ventilation for new hospitals in the Gulf.

  8. Lena Nordhaus takes over in the fourth generation. Since then, the company’s own crews have supplied and installed complete plant rooms, for hospitals, schools and offices.

Profile

Founded
1921 in Ilmenau, Thuringia. Family-owned in the fourth generation
People
2,900 in the group: around 1,900 in Ilmenau, 360 at the Wrocław plant, 640 in sales, service and projects in Germany and abroad. 330 of them work in the Plant Rooms business unit this page is about. Its eight departments in the org chart
Sites
Ilmenau head office with R&D, production and test bay, Wrocław plant, five subsidiaries abroad. Site bases of the Plant Rooms unit in Chemnitz and Magdeburg. All under Locations
Customers
Hospitals and laboratories 40%, building services contractors 22%, main contractors 14%, public clients 12%, industry and pharma 12%
Revenue
€610 million for the group, 64% of it abroad. Plant Rooms business unit €72 million
Per month
In the Plant Rooms business unit around 120 ventilation units, 350 heat pumps, 200 manifolds, 50 control cabinets. Three to four large sites at once. All cases and figures on this page are for this business unit
Certifications
DIN EN ISO 9001 and 14001, prequalification for public contracts, hygienic units to VDI 6022, DIN 1946-4 and DIN EN 1886
Systems
ERP, CRM, selection software, PDM and E-CAD, BoQ and estimating software, site diary app, service planning, file share and mailboxes

Locations

  • IlmenauGermanyHead office and home plantNortavo Gebäudetechnik GmbH & Co. KG
  • ViennaAustriaSales and serviceNortavo Österreich GmbH
  • ZurichSwitzerlandSales and serviceNortavo Schweiz AG
  • PragueCzech RepublicSalesNortavo CZ, s.r.o.
  • WrocławPolandPlant: casings and units for EuropeNortavo Polska Sp. z o.o.
  • DubaiUnited Arab EmiratesProjects in the GulfNortavo Middle East FZE
  • RiyadhSaudi ArabiaHospital projectsNortavo Saudi Arabia LLC

Four product lines, one plant room

  • ILZAir handling units1,000 to 25,000 m³/h, with heat recovery, in hygienic design for operating theatres and labs
  • WPHeat pumpsAir-to-water, R290, 12 to 60 kW
  • HVHeating circuit manifoldsDN 32 to DN 150, 2 to 12 heating circuits
  • SCControl cabinetsBACnet, 20 to 400 data points

Supply and installationFrom the four lines, Nortavo builds complete plant rooms, then installs, commissions and hands them over with its own crews.

Office <=> Job Site

Where demi works at Nortavo: seven of 14 stations

demi can work at all 14 stations. Pick a use case and see which ones it touches.

Office

+3.50Ilmenau head office
  1. O1Market & tenders5
  2. O2Request & incoming BoQs3 5
  3. O3BoQ & unit selection3 4
  4. O4Quote & estimating4
  5. O5Order, variations & billing2
  6. O7Purchasing & sub­contractors 
  7. O8Site management & installation planning1
One record. Every fact runs both ways.

Job Site

±0.00Factory and site
  1. S1Unit production 
  2. S2Manifold & cabinet building 
  3. S4Stores & site logistics 
  4. S5Installation on site1 2
  • demi works here
  • Next at Nortavo
  • demi can work here too
  • Line: the path of daily site report 061, from the photo on site via site management to variation NT-07

The payoff

Example calculation: five use cases free up 568 hours a year

≈ $36,920 per yearEstimate, not a promise
StartUse caseVolume per monthShareToday per yearFreed upValue per year
1Daily site report from photos and voiceInstallation and site management60 × 30 min50%360 h108 h$7,020
2Record site defects by photo and voiceInstallation and site management200 × 10 min50%400 h120 h$7,800
3Match tenders to your productsBid office10 × 4 h50%480 h144 h$9,360
4Price bills of quantities fasterEstimating8 × 8 h30%768 h138 h$8,970
5Find the right public tendersSales40 × 30 min40%240 h58 h$3,770
Total2,248 h568 h$36,920

Calculated for the Plant Rooms business unit in Ilmenau, not for the whole group. Of 2,248 hours, we count 568: volume times time times twelve months, then only the cautious share of that, times 0.6 for partly digital processes. That is about 0.3 full-time roles. Calculated at $65 per hour: $48.62 labor cost in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead. A number doesn’t fit your company? You can change every one of them in the configurator.

The start

How Nortavo starts: the building site first, then the bid office

Which systems and use cases join in the first 90 days
The first 90 daysDay 1Week 1Weeks 2 to 4Months 2 and 3
Systems
Site diary app, mailboxesPhotos, voice notes, hours and the site managers’ mailboxes, read-only
ERP, BoQ and estimating softwareRead-only, via a small connector in their own network
Selection software, file shareRead-only
CRM, PDM and E-CAD, service planningRead-only
Use cases
1 Daily site reportWith approval. On every site by day 30
2 Site defectsWith approval
3 Tender matchingWith approval
4 BoQ pricingWith approval
5 Finding tendersWith approval
Writing back
Into the site diary and the BoQ softwareAfter approval

Why the building site comes first

It needs only two sources, the site diary app and the site managers’ mailboxes, and delivers evidence from day 1: every delay with photo, time and BoQ item. With the unit selections demi reads from week 2, the work moves on to the bid office. There, each of the ten tenders a month currently takes four hours of matching against the product range, and that decides whether the bid stays in the running.

What Nortavo does itself

  • Head of ITTwo days for the connections
  • Head of installationOne hour a week
  • Project and site managersTwo weeks of reviewing drafts, alongside normal work

Rights

The org chart becomes the permission system

On a building site, one question comes first: who may see what? What only estimating sees in the ERP, only estimating sees in demi. And the main contractor sees its own project, no other.

Plant Rooms business unit: 330 people, eight departments

A plant room starts as a bid, is prefabricated at the factory, installed on site and maintained by customer service. The org chart is laid out the same way.

Unit management and staff functions 26Unit management 2 · Finance and controlling 9 · HR 6 · IT 5 · Assistants 4
  • 1Sales 24
    • Planner support 10
    • Field sales 8
    • Inside sales 6
  • 2Bid office and estimating 14
    • Bid office 8
    • Estimating 6
  • 3Development and engineering 30
    • Mechanical 12
    • Refrige­ration 7
    • Electrical design 6
    • Controls and BMS 5
  • 4Purchasing and logistics 18
    • Purchasing 8
    • Process planning 3
    • Stores and shipping 7
  • 5Production and test bay 144
    • Ventilation units 56
    • Heat pumps 38
    • Manifolds 18
    • Control cabinets 22
    • Test bay and quality 10
  • 6Installation and site management 46
    • Project and site managers 6
    • Fitters 40
  • 7Customer service 28
    • Commis­sioning 10
    • Maintenance 12
    • Hotline 6

26 + 24 + 14 + 30 + 18 + 144 + 46 + 28 = 330 people

Who opens which room

WhoSites & projectsQuotes & pricesCosting & marginsSelection & designUnits & serial numbersStaff & hoursApproves
Salesreadsown customers–readsreads–Bid or not
Bid office–editsreadsreadsreads–Unit, equivalence
Estimatingreadseditsedits–––Price
Project and site managersown sitereadsown projectreadsreadsown crewsReport, notice, snag list
Fitters in the appown site–––readsown hours–
Customer servicereadsreads–readsedits–Commissioning, maintenance
HR–––––edits–
Customer #1290 in the portalown projectown––own units–Acceptance
Site diary agent, AI coworkerreads–––readshours per siteNever
Matching agent, on someone’s behalfAs much as the person who starts it. No more.Never

Every room has keys. They come from your systems and never multiply on their own.

Fitters see their site and their hours. Only estimating, the bid office and each site manager for their own project see margins. The main contractor sees its own project.

An agent carries the keys of the person it works for. An AI coworker has its own, and always a person who is accountable for it. Every access is in the log.

Data

Eight systems become one record

1,243entries
1,360links
8systems

An excerpt from Nortavo’s record.

Connected

  • ERP
    Customers, quotes, orders, BOMs per unit, purchasing, stock, invoices, serial numbersThe plant room as a whole has no home. A unit is one order line
  • CRM
    Planners, contractors, public clients, ongoing planner projectsProject tracking lives apart from the quotes
  • Selection software
    Unit configurations, data sheets with certified values, list pricesEvery selection is a file, with no link to the BoQ item
  • PDM and E-CAD
    Casings, frames, refrigerant circuits, cabinet layouts, circuit diagramsVariants are redrawn for every order
  • BoQ and estimating software
    Bills of quantities, GAEB X83 in, X84 out, unit rates, job costingActual costs arrive months after the project
  • Site diary app
    Daily reports, photos, hours, defectsThe photos still end up in the messenger group
  • Service planning
    Commissioning, maintenance contracts, hygiene inspections to VDI 6022Serial numbers are typed in by hand
  • File share and mailboxes
    BoQs, drawings, as-built documents, requests, noticesFive copies of “final_v3” per project

Nothing gets replaced. Running a different ERP? demi connects to everything, from SAP and Oracle to the specialist software from the next town. At first, demi only reads. A person connects a system after seeing who will read what.

Held together

The same plant room. Eight systems. Now one entry.
Project P-26-031, North Office BuildingERP, order AB-26-0388
Customer #1290, main contractorCRM
Plant room, 2nd floorFile share, plant room drawing 2nd floor, revision c
ILZ 40 H, SN 26-1174ERP, serial number
4,000 m³/h, heat recovery 78%ILZ 40 data sheet, page 2. For SN 26-1174: unit selection A-25-0967
ISO ePM1 55%, VDI 6022File share, ILZ 40 data sheet, page 2
Heating circuit manifold DN 50, SN 26-1187ERP, serial number
Control cabinet ISP-02, SN 26-0932ERP, serial number. Circuit diagram: PDM and E-CAD
BoQ item 04.02.0010BoQ software, the main contractor’s BoQ
Daily site report 061Site diary app, approved 17:30
Variation NT-07BoQ software, notified in report 061

Ventilation unit ILZ 40 · 4,000 m³/h · heat recovery 78% · ISO ePM1 55% · VDI 6022ILZ air handling unit series · Datenblatt ILZ 40.pdf

Target value, main contractor’s BoQHeat recovery min. 75%Item 04.02.0010
Actual value, unit selectionHeat recovery 78%A-25-0967, SN 26-1174

Linked

Customer #1290 is building the North Office Building. In the 2nd-floor plant room stands the ILZ 40 with SN 26-1174.

Who?

Customers, crews, partners

  • Customer #1290Main contractor, organization
  • K-1290-3The main contractor’s site manager, person
  • OE-MB-02Installation crew 2, eight fitters
  • NU-114Insulation subcontractor

CRM, ERPbuilt for customer #1290

What kind?

Product series

  • ILZ 40 HVentilation unit, hygienic design
  • HV DN 50Heating circuit manifold, four heating circuits
  • SCControl cabinet, BACnet

Selection, PDMunits of these series

Which one exactly?

Serial numbers

  • SN 26-1174ILZ 40 H, unit 1
  • SN 26-1175ILZ 40 H, unit 2, in the laydown area
  • SN 26-1187Heating circuit manifold
  • SN 26-0932Control cabinet ISP-02

ERPbelongs to this room

What’s going on?

Site days

  • BTB 061Daily site report of Nov 10
  • BTB 060Daily site report of Nov 9
  • 7:30–10:30Downtime, eight fitters

Site diary appa day in this room

Where?

Plant room 2nd floor

North Office Building, project P-26-031

  • One room, four units, one project. This is where factory, site and service meet.

File sharePlant room drawing 2nd floor, revision c

What applies?

Orders, variations, contracts

  • AB-26-0388Order, supply and installation
  • NT-07Variation, 18 core holes
  • WV-1043Maintenance contract from acceptance

ERP, BoQ softwareapplies to this room

What’s in writing?

Photos, notes, notices

  • Photos 3 to 5Wall at unit 2
  • Voice note 7:36Start of the delay
  • Notice 7:45under § 6(1) VOB/B
  • Datenblatt ILZ 40.pdfPage 2

App, mailboxesabout this room

What should it be?

BoQ items and target values

  • 04.02.0010Ventilation unit 4,000 m³/h, heat recovery min. 75%
  • 04.03.0040Steel heating pipe DN 50
  • ISP02_LG1_TZUSupply air temperature, data point

BoQ software, E-CADrequirement for this room

What do we make of it?

Findings

  • F-26-11424 fitter hours and a second crane lift from the delay on Nov 10, backed by photos 3 to 5

demifinding on this room

At the pump maker, the pump with its serial number sits in the middle; at the machine builder, the line at the customer’s site; at the space supplier, the flight unit in orbit. At Nortavo, it is a room: the plant room, where factory, site and service come together. The grid stays, the middle changes.

What it can do

  • Recognize

    “TZ 2.OG” in the site diary, “Technikraum Nord” in the messenger and room 2.014 on the drawing are the same room.

  • Unify

    m³/h, l/s and “the 4000” become one value with a unit.

  • Trace

    Every value shows its source, exact location and version. Unclear rows are kept too.

  • Look back

    What stood in the plant room when the delay began.

  • Write back

    After approval, report and notice land in the site diary and on the project.

Intelligence

Five agents do the work, people approve

  1. Site diary agent

    AI coworker, accountable: head of installation

    TriggerPhotos and voice notes in the site diary app, the last one at the end of the day
    ReadsPhotos, voice notes, hours from the site diary app, weather, the project’s BoQ
    DoesDrafts the daily site report per BoQ item, spots delays with their time and drafts the notice under § 6 VOB/B
    ApprovalProject and site managers
  2. Defects agent

    Works for the person who starts it

    TriggerA site manager starts it on a walk-through or at acceptance
    ReadsPhotos, voice notes, drawings, BoQ items, subcontractor contracts
    DoesRecords every defect with location, trade and deadline and sends each crew and subcontractor its list
    ApprovalSite manager
  3. Matching agent

    Works for the person who starts it

    TriggerThe bid office starts it on a BoQ as a GAEB file or PDF
    ReadsBoQ items, selection software, data sheets, hygiene certificates
    DoesAssigns a unit to every item, shows each deviation with page and value and drafts the proof of equivalence
    ApprovalBid office
  4. Estimating agent

    Works for the person who starts it

    TriggerSomeone from estimating starts it on a BoQ for supply and installation
    ReadsUnit rates and job costing from the BoQ software, installation hours from earlier projects
    DoesSuggests material and labor per item, with the project each value comes from, and drafts the X84 file
    ApprovalEstimating; above a threshold, management
  5. Market agent

    AI coworker, accountable: head of sales

    TriggerNew contract notices on the procurement platforms, every morning
    ReadsContract notices, reference list, certificates, free capacity of the installation crews
    DoesScores every tender: does it fit, is there enough time, is a certificate missing
    ApprovalSales decides whether Nortavo bids

The BoQ software sets the unit rate for every item, with Nortavo’s own all-in labor rate and mark-ups.

Calculations run on Nortavo’s own rules and data, not in the language model. Anything that goes out or is written back to a system is approved by a person.

The roadmap

Next up: commissioning, test rig and BMS design

  1. Commissioning and maintenance

    Reports per serial number, maintenance contracts and the hygiene inspection to VDI 6022 every three years. demi schedules them from the record, and customer service sees every plant room Nortavo has ever built.

    S6
  2. Test rig

    Every unit’s test report goes from the test rig PC into the record: leak tightness, refrigerant charge, electrical safety. From then on it stays with the serial number, for life.

    S3
  3. BMS design

    Data point lists and BACnet objects come straight from the unit selection and the control cabinet, instead of being copied for each project.

    O6

Sources

Why data first, then rights, then AI

60%

Through 2026, Gartner expects organizations to abandon 60% of AI projects that lack AI-ready data.

Gartner · 2025 · on step 1, dataOpen the source (opens in a new tab)
Least privilege

Share sensitive data in LLM apps on a least-privilege basis only, meaning just what a user or process needs.

OWASP GenAI Security Project · 2025 · on step 2, rightsOpen the source (opens in a new tab)
70%

70% of AI’s potential value sits in core functions such as sales, manufacturing and supply chain.

Boston Consulting Group · 2025 · on step 3, intelligenceOpen the source (opens in a new tab)
NortavoBuilding servicesExample company

Nortavo doesn’t exist. Your company does.

In 20 minutes we show you demi on a case like yours: bring the data together, set the rights, let AI do the work.

Nortavo Gebäudetechnik GmbH & Co. KG is made up: a typical company in Construction & Building Services, not a real one. An estimate from our assumptions, not a promise. You can change every number in the configurator.