Defects end up on paper lists or scattered across photo folders. Which trade is responsible, and by when, often stays unclear. Acceptance is delayed, and the final invoice with it.
An example
During the pre-acceptance walk-through of an office building, the site manager at Nortavo Gebäudetechnik records 34 defects by photo and voice, among them a leaking DN 50 heating manifold on the second floor. The agent assigns them to seven trades and sends each its list with deadlines.
Your data, wherever it lives
Today defects sit on paper lists, photos and voice notes stay on phones and in site chats, plans and contracts with their deadlines in the DMS, trades and subcontractors in the ERP, and correspondence in e-mails. demi reads, understands and links them per project, room and trade, with your rights. During the walk-through, the AI turns a photo and voice note into a defect with location, trade and contractual deadline instead of lists typed up in the evening, and your site management releases the defect notices.
Where the data lives today
- Scans & paper
- Photos, video & audio
- Chats
- CAD & drawings
- DMS & archive
- ERP
- E-mails
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
The case needs data from chat, DMS, ERP and e-mail. demi replaces nothing and links photos, voice notes, plans, rooms, trades, contracts and deadlines per project; every defect is one record with its location and owner. demi writes back only after approval.
- 2 · PermitPermission Layer
Each trade sees only its own defects; site management sees everything and releases the defect notices. The client sees released lists, and every step is recorded.
- 3 · ActIntelligence Layer
The agent turns a photo and voice note into a structured defect with room and trade and takes the deadline from the contract, not from an estimate. A defect counts as fixed only with photo proof, and every entry points to the photo, note or contract.
How it runs
- 1
During the walk-through, photograph the defect and speak a short note into your phone.
- 2
The agent recognizes room, component and trade and sets the deadline from the contract.
- 3
Site management checks the list and releases the defect notices.
- 4
Each trade receives its list with photos and deadlines.
- 5
A defect counts as fixed only with photo proof, and the agent sends reminders before the deadline.
What changes
Defects fixed faster
Clear responsibility for each trade
A smoother acceptance
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+200 hfreed per year
Assumptions and calculation
demi turns a photo and voice note into a defect with location, trade and deadline; you drive acceptance.
10 min → 5 min per case
How we calculate
200 defects × 10 min × 50% × 1.0 (manual) × 12 months = 12,000 min = 200 h
Value per year, before demi costs
Freed per year+200 h
Assumption: labor cost of $48.62 per hour in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead.
= Value per year, before demi costs
+$13,000
gained per year
200 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Does this work on site with a phone?
Yes. Photos and voice notes go through the chat the team already uses, or straight from the phone's camera. The agent turns them into the defect, and nobody has to fill in forms.
How are trades notified of their defects?
Once site management releases them, each trade receives its list by e-mail or through a portal, with photos, location and deadline. Replies and photo proof come back the same way and are attached to the right defect.
Can the client see progress?
Yes, but only the lists you release. Internal notes and the coordination with the trades stay with you.
How does the agent know the deadlines?
From the contracts with the client and the subcontractors in the DMS or ERP. Every deadline shows the contract clause it comes from. If a deadline is not set out, the agent asks site management instead of inventing one.