Orders get released although a part, a drawing revision or a gauge is missing. The order then blocks a machine or an assembly station, and production has to switch. Checking up front means clicking through ERP, PLM and stock lists.
An example
Talwerk Antriebstechnik has 64 orders planned for week 46. The agent reports 52 ready, 8 waiting for material with a confirmed delivery date and 4 with a drawing revision not yet released, among them gearbox housing GH-2210 at revision C. The planner releases the 52 and moves the other 12.
Your data, wherever it lives
Today stock, reservations and open purchase orders sit in the ERP, the order schedule in the MES, drawings and BOMs with their release status in the PLM, gauges in the QM system and tools often in stock lists. demi reads, understands and links them per production order, with your rights. Every morning the AI checks all planned orders against the fixed checklist instead of someone clicking through three systems, and your planner releases the ones ready to start.
Where the data lives today
- ERP
- MES
- PLM
- CAD & drawings
- QM system
- Office files
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
The case needs data from the ERP, MES and PLM. demi replaces nothing and links every production order to stock, reservations, open purchase orders, released drawings and BOMs, and tools and gauges. demi writes back only after approval.
- 2 · PermitPermission Layer
Work preparation and planning see the blockers in their area. Release stays with the planner, anyone who releases despite an open point records the reason, and everything is recorded.
- 3 · ActIntelligence Layer
The agent runs a fixed checklist per order, each check a rule on status fields in ERP and PLM: material reserved, drawing and BOM released, tools and gauges available. It ranks missing parts by how many orders they block, each with its record.
How it runs
- 1
Read in the orders planned for the coming days
- 2
Check each order against the fixed checklist
- 3
Rank missing parts by the orders they block
- 4
Send planning a daily list of orders ready to start
- 5
Planner releases, status is written back after release
What changes
Fewer orders that start and then stall
Missing parts handled by their impact
Steadier flow on the shop floor
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+320 hfreed per year
Assumptions and calculation
demi checks material, drawing, bill of materials and gauges and reports each blocker; you release.
10 min → 6 min per case
How we calculate
400 production orders × 10 min × 40% × 1.0 (manual) × 12 months = 19,200 min = 320 h
Value per year, before demi costs
Freed per year+320 h
Assumption: labor cost of $48.62 per hour in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead.
= Value per year, before demi costs
+$20,800
gained per year
320 h ÷ 1,760 h per role = 0.2 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Which checks are on the checklist?
By default: material reserved or confirmed, drawing revision released, BOM released, tools and gauges available. Each check reads a status field. It sits, for example, in the ERP, PLM or MES. The result is traceable and always the same for the same data.
Can we add our own checks?
Yes. Common ones are a released NC program, an approved first article, customer approval or outside processing reported back. Each check is set up as a rule on a field or document status and then applies to every matching order.
How are missing parts prioritized?
By the orders they block: how many, how soon they are planned and for which customer date. Purchasing sees which part to chase first. Confirmed delivery dates from the ERP sit right next to it.
What if status fields in the ERP are not maintained?
The agent reports that as a finding of its own, such as a missing reservation or an empty drawing status. An order with a gap is never shown as ready. Data gaps become visible before they surface on the shop floor.