Propose the order sequence and explain it

A sequence by due date, setup order and material, with each decision explained in plain words.

Today

Every morning planners juggle due dates, setups, material and absences in spreadsheets. The plan keeps changing. Nobody but the planner can see why one order runs before another.

An example

At Talwerk Antriebstechnik two rush orders for geared motors come in. The agent shows two variants: one keeps every due date but needs three extra setups. The other saves those setups and moves the non-critical order 4471 by one day.
Fictional company, typical workflow.

Your data, wherever it lives

Today orders, routings, material and customer due dates sit in the ERP, machine status in the MES, setup sequences, shift plan and planning rules in the planner's spreadsheets, absences in the HR system, and rush orders arrive by e-mail. demi reads, understands and links them per order, machine and shift, with your rights. The planning system calculates the variants to your rules, the AI compares and explains them in minutes instead of an hour and a half of juggling spreadsheets, and the planner decides.

Where the data lives today

  • ERP
  • MES
  • Office files
  • HR system
  • E-mails
Data LayerOne view of everything, with your rights

How demi solves it

Three layers in this order: connect the data first, then the rights, then the AI.

  1. 1 · ConnectData Layer

    The case needs data from the ERP, MES and spreadsheets. demi replaces nothing and links production orders, routings and setup families with material availability, the shift plan, customer due dates and the planning rules from the spreadsheets. demi writes back only after approval.

  2. 2 · PermitPermission Layer

    Planners own the plan: the agent proposes, the planner releases. Every change to the plan is recorded with name and reason.

  3. 3 · ActIntelligence Layer

    Sequences are computed by your existing planning system or a connected scheduling solver with fixed rules, not by the language model. The agent compares the variants on lateness and setup time and explains the trade-offs in plain words, every figure citing its order.

How it runs

  1. 1

    New orders, rush orders or material delays come in.

  2. 2

    The planning system computes several sequences by your rules.

  3. 3

    The agent compares them on due dates and setup time.

  4. 4

    It explains each variant in a few sentences.

  5. 5

    The planner chooses, adjusts and releases.

What changes

  • Faster daily planning

  • Priorities everyone can follow

  • Fewer setups and late orders

What does it bring you?

Check it with your own numbers

Every starting value is an assumption you can change. The calculation sits right below, step by step.

Assumption, editable

Your numbers

Result

+108 hfreed per year

Assumptions and calculation

demi proposes the sequence by due date, set-up order and material and explains it; you set it.

90 min → 63 min per case

How does it run today?

What is already digital saves less: the factor lowers the share demi brings.

How we calculate

20 planning runs × 90 min × 30% × 1.0 (manual) × 12 months = 6,480 min = 108 h

Value per year, before demi costs

Freed per year+108 h

Assumption: labor cost of $48.62 per hour in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead.

= Value per year, before demi costs

+$7,020

gained per year

108 h ÷ 1,760 h per role = 0.1 full-time roles

An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.

Combine with more cases and get the package

Questions about this use case

Does it replace our planning system?

No. demi uses your planning system or a connected scheduling solver for the computation. Results go back only after your approval. What is new is the explanation of why the plan looks the way it does.

Can planners override the proposal?

Always. Planners can move or pin orders or choose another variant. The reason is recorded, so you can adjust a rule that keeps getting overridden.

How does it handle rush orders?

A rush order triggers a recalculation. The agent shows which orders move and which due dates would slip. The planner decides whether and how the rush order goes in.

What if our rules exist only in the planners' heads?

Then demi writes them down together with the planners, from conversations and past plans. A planner confirms each rule before it applies. That way the knowledge stays in the company through holidays and staff changes.

See this case with your data

In the demo we show you the workflow on your own systems.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases