Skip to content
NorveltaMould makingExample company

Getting started with AI · Tool & Mould Making

How a mould maker gets started with AI

Norvelta doesn’t exist. Everything else on this page will feel familiar.

demi turns your systems into one record, carries over your rights and lets AI agents prepare the routine work. First the data, then the rights, then the AI. A person always approves.

Norvelta Formenbau GmbH · Lüdenscheid (Germany), since 1951, 180 people, about 1,100 tools in use at customers

What five use cases free up

+861 h per yearEstimate, not a promise≈ €55,965 per year, calculated cautiously

On the left, the tool as built. On the right, the part as the customer has wanted it since this morning. In between: 55 hours, a change quote and a week of machine bookings.

Change notice ÄM-2219-06

Tool
W-2219, 4-cavity, hot runner
Customer
#8019
Section
A–A, dimensions in mm
Change notice ÄM-2219-06, section through housing 4471-310. On the left Rev. E, the tool as built; on the right Rev. F, the part as the customer now wants it. Ribs R2 and R3 move by 1.5 millimetres: the old rib slots in the core insert are welded shut and the new ones are cut by EDM. The left side wall gets 0.3 millimetres thinner, so steel is added to the cavity insert. The revision mark changes from E to F.Parting lineParting lineREV. ETool as built, design released 2 Oct 2026REV. FCustomer revision, Mail #4719, Tue 17 Nov 2026, 7:051 Rib R2 moves 1.5 mmPos. 3 core insert, ×42 Side wall2.0 → 1.7 mmPos. 7 cavity insert0.3 mm, not to scale3 Rib R3 moves 1.5 mmPos. 3 core insert, ×44 Revision mark E → FSwap the engraving insert1.5Steel on: weld, re-millSteel off: EDMsolid: this side’s revisiondashed: the other one

Affected

Effort, based on three similar changes

  • Design6 h
  • CAM5 h
  • Sinker EDM30 h
  • HSC milling8 h
  • Assembly and spotting6 h
  • Total, plus external welding55 h

Impact

T1 Fri 27 Nov

instead of Tuesday, 24 Nov. Ties up SE-1 from Friday.

ÄA-2219-06

Change quote, €5,855 net: 55 h × €85 plus welding €1,180. Draft, for the project manager to approve.

The change notice for tool W-2219, Tuesday, 17 November, 7:05 am. Every value leads to its source.

The problem

Tuesday, 9:30 am: Rev. F adds 30 hours of sinker EDM, with SE-1 fully booked

At 7:05, Mail #4719 came in from customer #8019: housing 4471-310 is now at Rev. F. Two ribs move 1.5 mm, one side wall gets 0.3 mm thinner. The four core inserts of W-2219 are already hardened.

For the toolroom manager, that means 30 extra hours of sinker EDM, from Friday at the earliest, once the inserts are back from welding. Sinker EDM is at 112% of capacity; SE-1 and SE-2 are fully booked until Friday. If W-2219 moves up, W-2230 misses its T1 on Wednesday, 25 Nov. Unless an EDM job runs unattended over the weekend.

The planning meeting is at 11:00. Until then, he has three sources:

On the whiteboardThe week’s machine schedule, as of Monday morning.

In the ERPYesterday’s time bookings, per tool, not per insert.

In two spreadsheetsThe milestones of all 34 tools and the cell’s night shift.

He works it out by hand and phones three foremen. At 11:00 he has one option, not two, and nobody knows what it does to W-2248.

FromTool purchasing, customer #8019
ToNorvelta project management
SubjectHousing 4471-310, Rev. F: impact on T1 and cost?
Mail #4719Good morning, please find Rev. F attached. As discussed at T0, we moved ribs R2 and R3 and reduced the left wall to 1.7 mm. Will T1 hold? And what will the change cost?

4471-310_F.stp3D model, Rev. F

New card for the schedule

W-2219 Pos. 3 core insert, Rev. F

  • Sinker EDM 30 h, on SE-1 or SE-2
  • Fri 20 Nov at the earliest, after external welding Wed–Thu
  • New T1 for W-2219: Fri 27 Nov
Toolroom schedule, week 47, excerpt, as of Tuesday, 17 Nov 2026, 9:30 am
MachineMon 16Tue 17Wed 18Thu 19Fri 20Sat 21Sun 22Wk 48
HSC-1W-2241 Mill slidesW-2248 Mould plates
HSC-2W-2219 Electrodes Pos. 7W-2230 Electrodes
CellCell HSC-3 and SE-3: electrodes and small parts, unattended at night and at weekends
SE-1W-2241 EDM slidesW-2230 Mould inserts, 18 hW-2230 Finish Mon
SE-2W-2219 Pos. 7 cavity insertW-2248 Core pins
DE-1W-1834 Spare insert K3W-2248 Slide guide
AssemblyW-1834 Polish spare K3W-2230 Assembly

W-2219, the changed toolW-2230: slips if W-2219 moves up on SE-1. T1 Wed 25 NovWeekend: unattended only

What happens here every month

  1. 20customer changes
  2. 4planning rounds
  3. 80quotes
  4. 60job costings
  5. 40mould services

Together that is 4,524 hours a year, about 2.6 full-time roles. And every change nobody bills comes out of Norvelta’s own pocket.

What hurts there

  1. 01
    Project know-how sits in old tool files

    About 1,100 tools in use, each with its concept, sampling and corrections. When a similar request comes in, only the design engineer who did it back then knows where the file is and what is really in it.

  2. 02
    No quote goes out without a design engineer

    Feasibility, comparable tools, EDM hours: every request lands in design. And design is tied up with the current tool projects. The faster competitor wins the order.

  3. 03
    Nobody knows for sure which revision applies

    The customer’s revision, the design revision, the correction after T0, the repair on the running tool: what was built and what is documented drift apart. Pick the wrong one and you pay twice.

What demi does · An example

Two schedules by 9:40, price and T1 date with the customer by 11:20

  1. The new revision

    demi reads Mail #4719 and the 3D model and lays Rev. F over Rev. E: two ribs moved by 1.5 mm, one wall 0.3 mm thinner, a new revision mark.

    Mail #4719ÄM-2219-06
  2. What is affected

    The agent maps the change in 4-cavity tool W-2219 to positions 3 and 7, core and cavity inserts in 1.2343, four of each. Plus eight electrodes and six NC programs.

    W-2219 Pos. 3Pos. 7
  3. Effort and quote

    Three similar changes show the effort: 55 hours, 30 of them sinker EDM, plus external welding. The draft change quote is ready.

    ÄM-1907-03ÄM-2011-02ÄM-2104-05ÄA-2219-06
  4. Two options

    The planning solver recalculates the schedule, the agent explains it. A: W-2219 runs its EDM on SE-1 from Friday and carries on unattended on Saturday. W-2230 runs its EDM unattended on SE-2 on Saturday and Sunday, and its T1 holds. B: its T1 slips to Wednesday, 2 Dec.

    Option AOption B
  5. The approval

    The toolroom manager picks A. The project manager approves the change quote. By 11:20, customer #8019 has the price and the new T1 date.

    Human approvesLog
Option A, approved at 11:00 am: detail of sinker EDM and assembly
MachineMon 16Tue 17Wed 18Thu 19Fri 20Sat 21Sun 22Wk 48
SE-1W-2241 EDM slidesW-2219 Pos. 3, Rev. F, 30 h
SE-2W-2219 Pos. 7 cavity insertW-2248 Core pinsW-2230 18 h unattended
AssemblyW-1834 Polish spare K3W-2230 Assembly Mon–Tue

W-2219 Pos. 3, Rev. FWeekend: unattended

Until nowOne option at 11:00Worked out by hand from the whiteboard, the ERP and two spreadsheets. What it means for the other tools only shows up the following week.
With demiTwo options at 9:40Each with its knock-on effects for all 34 tools. At 11:00 the team decides instead of calculating.

By hand, a planning round takes eight hours. Of those, the calculation below credits demi with only 86 minutes: 30% of the eight hours, times 0.6.

NorveltaMould makingExample company

Steel on, steel off. Since 1951.

About 140 new tools a year: hot-runner moulds from Lüdenscheid

From button dies to hot-runner moulds

  1. Embossing dies for buttons, badges and plaques: that is how an engraver from Lüdenscheid’s button industry starts out in his own workshop.

  2. Norvelta builds its first compression moulds for Bakelite switch covers, and from 1966 injection moulds for thermoplastics.

  3. A stamping die shop of its own: the same customer gets the progressive die for the contacts and the mould that overmoulds them.

  4. The automated milling and EDM cell goes live. At night and at weekends it runs unattended.

  5. When no one in the engraver’s family wanted to carry on, the head of design took over the firm. He trained here as a toolmaker and is now the owner. About 140 new tools a year, plus around 580 changes, repairs and inserts.

Profile

Founded
1951 in Lüdenscheid
People
180 in nine departments, including 50 in parts manufacturing and 12 apprentices. All departments in the org chart
Site
Lüdenscheid: design, parts manufacturing with the cell, mould and die assembly, a tryout centre with five injection moulding machines
Customers
Injection moulders for connectors and sensor housings, electrical installation, e-mobility, household appliances, medical disposables
Exports
35%, mainly Austria, Switzerland, the Czech Republic, Poland and France
Revenue
About €24 million
In use
About 1,100 tools at customers, around 300 of them under a maintenance contract
Machines
9 HSC machining centres, 6 sinker and 4 wire EDM machines, 5 grinding, 2 turning and 2 deep-hole drilling machines, 2 spotting presses, a tryout press for stamping dies, 2 CMMs
Systems
ERP with shop-floor data, CAD and PDM, CAM, cell controller, metrology lab, tool files, mailboxes

Four product lines, every piece a one-off

  • SWInjection moulds1 to 16 cavities, hot runner, 2K
  • STStamping and progressive diesContacts and busbars, up to 800 strokes/min
  • FEMould inserts and spare partsfor its own tools and those of other makers
  • VRFixtures and gaugesInspection and assembly fixtures

Office Floor <=> Toolroom

Where demi works at Norvelta: eight of 14 stations

demi can work at all 14 stations. Pick a use case and see which ones it touches.

Office Floor

  1. O1Customers & markets 
  2. O2Request & feasibility3
  3. O4Quotes & estimating1 3
  4. O5Order & project management1 4
  5. O6Design & changes1
  6. O8Scheduling & machine loading2
One record. Every fact runs both ways.

Toolroom

  1. S1Parts manufacturing: milling, EDM, grinding2 4
  2. S5Tool service5
  3. S6Tools at the customer5
  • demi works here
  • Next at Norvelta
  • demi can work here too
  • Line: the path of ÄM-2219-06, from the email through design and the quote into the parts manufacturing schedule

The payoff

Example calculation: five use cases free up 861 hours a year

≈ €55,965 per yearEstimate, not a promise
StartUse caseVolume per monthShareToday per yearFreed upValue per year
1Track customer changes to the toolEngineering20 × 2 h30%480 h86 h€5,590
2Schedule the toolroom across all projectsProduction4 × 8 h30%384 h69 h€4,485
3Build quotes from similar past ordersSales80 × 3 h30%2,880 h518 h€33,670
4Job costing per order at a glanceManagement60 × 45 min40%540 h130 h€8,450
5Plan mould maintenance by shot countService40 × 30 min40%240 h58 h€3,770
Total4,524 h861 h€55,965

Of 4,524 hours, we count 861: volume times time times twelve months, then only the cautious share of that, times 0.6 for partly digital processes. That is about 0.5 full-time roles. Calculated at €65 per hour: €49.50 labour cost in manufacturing according to Destatis, plus workplace, IT and overheads. A number doesn’t fit your company? You can change every one of them in the configurator.

The start

How Norvelta starts: like a tool, with T0, T1 and acceptance

Which systems and use cases join in the first 90 days
The first 90 daysDay 1Week 1Weeks 2 to 4Month 2Month 3
Milestones
As with a toolT0First case runs, read-onlyT1Cases 1 to 3 in daily useAcceptanceWriting back to the ERP
Systems
Mailboxes, tool filesProject mailbox and tool folders, read-only
ERP with shop-floor data, CAD and PDMRead-only, via a small connector in their own network
CAM, cell controllerRead-only
Metrology labRead-only
Use cases
1 Customer changesWith approval. In daily use from week 4
2 SchedulingWith approval
3 QuotesWith approval
4 Job costingWith approval
5 Mould maintenanceWith approval
Writing back
Into the ERPAfter approval

Why customer changes come first

A change nobody bills comes straight out of the margin: ÄA-2219-06 alone is worth €5,855. The tool number is already in all three sources: the mailbox, the PDM and the ERP. demi only reads them and brings them together. From week 2, scheduling and quotes work on the same data, job costing as soon as the cell controller and CAM deliver the run times per insert.

What Norvelta does itself

  • ITTwo days for the connections
  • Toolroom managementOne hour a week
  • Project managersTwo weeks of reviewing drafts, alongside normal work

1Data

Seven systems become one record

1,208entries
1,289links
7systems

An excerpt from Norvelta’s record.

AConnected

  • ERP with shop-floor data
    Requests, quotes, orders under the tool number, BOMs, operations, time bookings, progress invoicesHours land on the tool, rarely on the position. Job costing happens months later
  • CAD and PDM
    Tool designs, standard parts, electrodes, drawings, revisionsThe customer’s revision and the tool’s revision are two different counters
  • CAM
    NC programs for HSC milling, electrodes and wireProgramming is the hidden bottleneck
  • Cell controller
    Pallets and electrodes with RFID chips, the queue for nights and weekendsKnows where every electrode is. Nobody else does
  • Metrology lab
    Measuring programs, inspection reports, sampling reportsOne PDF per sampling run. The values never reach the ERP
  • Tool files
    One folder per tool: customer data, tooling standard, hardening reports, photosWhat’s in it, only the original design engineer knows
  • Mailboxes
    Requests, new customer revisions, date changes, weekly reports with shot countsThe real change log

Nothing gets replaced. Running a different ERP? demi connects to everything, from SAP and Oracle to the specialist software from the next town. At first, demi only reads. A person connects a system after seeing who will read what.

BHeld together

The same tool. Seven systems. Now one entry.
Tool W-2219ERP, order since 8 Jul 2026
Customer #8019, asset no. 70114582ERP, customer’s purchase order
Housing 4471-310, Rev. FMailboxes, Mail #4719
Tool as built: Rev. EPDM, released 2 Oct 2026
Pos. 3 and 7, ×4 eachPDM, BOM W-2219
1.2343 ESR, 51 HRCTool file, hardening report H-26-1182
Electrodes E-2219-031 to -038CAM, cell controller
Sinker EDM SE-1, 30 hERP, operation 40
Change quote ÄA-2219-06ERP, approved 17 Nov 2026
T1 Fri 27 Nov 2026ERP, milestone
Target value, customer Rev. FWall 1.7 mm4471-310_F, section A–A
Measured value, T0 samplingWall 2.02 mmInspection report MP-2219-T0, 42 features

CLinked

Customer #8019 gets W-2219, a 4-cavity hot-runner mould for housing 4471-310, built to Rev. F from today.

Who?

Customers, contacts, teams

  • Customer #8019Injection moulder for sensor housings, customer since 2014
  • K-8019-2Tool purchasing, a contact person
  • OE-PLNorvelta project management

ERP, mailboxesordered by customer #8019

What kind?

Tool type and BOM

  • SW 4-HK4-cavity, hot runner with valve gates
  • Pos. 3Core insert, ×4
  • Pos. 7Cavity insert, ×4

PDM, ERPis an SW 4-HK

Where?

Machines and workstations

  • SE-1SE-2Sinker EDM
  • CellHSC-3 and SE-3, unattended
  • M3Tryout centre, sampling

ERP, cell controllermade on SE-1 and SE-2

What’s going on?

Operations and dates

  • T0Fri 13 Nov 2026, tryout centre M3
  • Op 40Sinker EDM, Pos. 3
  • T1Fri 27 Nov 2026

ERPoperation on this tool

Which one exactly?

Tool W-2219

4-cavity hot-runner mould for housing 4471-310

  • Until acceptance, W-2219 is also the order number. After that, the tool runs at the customer under asset no. 70114582.

ERPtool number = order

What applies?

Quotes, opportunities, payments

  • ÄA-2219-06Change quote, €5,855
  • #26-0958Quote for request A-26-0951, with W-2219 as the reference tool
  • 2nd thirddue at T1

ERPquote for this tool

What’s in writing?

Emails, reports, programs

  • Mail #4719Rev. F with 3D model
  • ÄM-2219-06Change notice
  • AB-2219-T0Sampling report
  • MP-2219-T0Inspection report, 42 features

Mailboxes, tool files, metrology lababout this tool

What should it be?

Requirements

  • WR-8019 Rev. 4Customer’s tooling standard: standard parts, hot runner, cooling connections
  • 4471-310 FWall 1.7 mm

Tool filerequirement for this tool

What do we make of it?

Findings

  • F-26-102Left wall measures 2.02 mm at T0: for 1.7 mm, 0.32 mm of steel goes on, not 0.3

demifinding on this tool

At the pump maker, the pump with its serial number sits in the middle; at the machine builder, the line at the customer’s site; at the space supplier, the flight unit in orbit. At Norvelta, it is the tool with its number. The grid stays, the middle changes.

DWhat it can do

  • Recognise

    W-2219, “the housing tool for #8019” and asset no. 70114582 are the same tool.

  • Unify

    Revision, index and version become one change history per tool.

  • Trace

    Every value shows its source, exact location and version. Unclear rows are kept too.

  • Look back

    The tool as built, Rev. E. Not as it was quoted.

  • Write back

    After approval, the change quote lands in the ERP.

2Rights

The org chart becomes the permission system

Anyone who can’t see costing in the ERP can’t see it in demi either. And a customer’s CAD data is visible only to those who need it for their work.

180 people, nine departments

Department by department, a tool is costed, designed, scheduled, milled and spark-eroded, assembled and spotted, and finally sampled in the tryout centre. After acceptance, it passes to tool service.

Management and administration 12Management 2 · Finance 4 · HR 2 · IT 2 · Assistants 2
  • 1Sales and project management 13
    • Costing 3
    • Project management 7
    • Inside sales 3
  • 2Design and CAM 32
    • Mould design 16
    • Die and fixture design 5
    • CAM and electrodes 9
    • Simulation 2
  • 3Production planning and purchasing 10
    • Toolroom management and scheduling 3
    • Purchasing 4
    • Stores and shipping 3
  • 4Parts manu­facturing 50
    • HSC milling 24
    • EDM 14
    • Grinding 7
    • Turning and deep-hole drilling 5
  • 5Tool assembly 28
    • Moulds 20
    • Stamping dies 8
  • 6Tryout centre and quality 13
    • Sampling 7
    • Metrology lab and QM 6
  • 7Tool service 10
    • Changes and repairs 7
    • Maintenance at customers 3
  • ·Apprentices 12
    • Toolmakers 9
    • Machinists 3

12 + 13 + 32 + 10 + 50 + 28 + 13 + 10 + 12 = 180 people

Who opens which room

WhoTools at customersCustomer CAD dataQuotes & pricesCosting & actual hoursScheduleHRApproves
Costingreadsreadseditsedits, actual hours read-onlyreads–Quote, price
Project managersown toolsown toolsreadsown tools, otherwise hours onlyreads–Change quote, date to the customer
Design and CAMreadsedits––reads–Design revision, NC program
Toolroom management and schedulingreadsreads–hours onlyedits–Schedule, unattended weekend running
Parts manufacturing–per operation––reads–Time booking
Tool serviceeditsreadsreadshours onlyreads–Maintenance date, repair quote
HR–––––edits–
Planning agent, AI coworker–––hours onlyreads–Never
Engineering change agent, on someone’s behalfAs much as the person who starts it. No more.Never

Every room has keys. They come from your systems and never multiply on their own.

A tool’s margin is visible only to costing and to the project manager in charge of it. Actual hours are also visible to anyone who plans or quotes a repair. A customer’s CAD data opens only for those who need it for their work, and in parts manufacturing only per operation.

An agent carries the keys of the person it works for. An AI coworker has its own, and always a person who is accountable for it. Every access is in the log.

3Intelligence

Five agents do the work, people approve

  1. Engineering change agent

    Works for the person who starts it

    TriggerSomeone in project management starts it on an email with a new customer revision
    ReadsCustomer revision, tool revision in the PDM, BOM, hardening reports, earlier changes
    DoesLays the new revision over the old one, maps the change to the positions in the BOM, across all cavities, and drafts a change quote from three comparable earlier changes
    ApprovalProject management, design
  2. Planning agent

    AI coworker, accountable: toolroom management

    TriggerA new card, a time booking in the ERP, a machine breakdown
    ReadsSchedule, time bookings, cell controller, T0 and T1 milestones of all tools
    DoesThe planning solver recalculates the schedule, the agent explains it: which milestone is at risk, what the options are, what can run unattended
    ApprovalToolroom management
  3. Quote agent

    Works for the person who starts it

    TriggerSomeone in costing starts it on a request with part data
    ReadsRequest, part geometry, earlier tools, job costings, sampling reports
    DoesFinds similar tools by cavity count, hot runner, slides and part size, shows planned against actual and drafts the costing
    ApprovalCosting, date: project management
  4. Job costing agent

    AI coworker, accountable: costing

    TriggerAcceptance of a tool, and every Friday for all open orders
    ReadsTime bookings per operation, run times per insert from the cell controller and CAM, purchase orders, change notices, invoices
    DoesCompares planned and actual per tool, position and operation, and finds changes that were never billed
    ApprovalCosting
  5. Maintenance agent

    AI coworker, accountable: head of tool service

    TriggerA customer’s weekly report with shot counts
    ReadsShot counts, maintenance intervals, repair history, spare inserts in stock
    DoesWorks out from the shot counts when a tool is due for maintenance, such as W-1834 going from 242,000 to 250,000 shots, places the maintenance in the customer’s next tool change and checks the spares
    ApprovalTool service

Norvelta prices new tools with hourly rates per cost centre, from milling to spotting, and standard parts at catalogue price. Changes go into the quote at a single hourly rate, plus external work such as welding. Rates and prices sit in the ERP; the schedule is computed by a planning solver that demi connects.

Calculations run on Norvelta’s own rules and data, not in the language model. Anything that goes out or is written back to a system is approved by a person.

The roadmap

Next up: sampling, steel and heat treatment, concept

  1. Sampling and assembly

    demi already reads the inspection reports. Next, sampling and corrections per cavity become a case of their own: assembly sees before T1 what stood out at T0.

    S3S4
  2. Steel, heat treatment, coating

    Purchase orders, EN 10204 3.1 certificates and the heat treater’s dates are attached to the tool. If a heat treater’s date starts to slip, scheduling sees it the same day.

    O7S2
  3. Concept and simulation

    Fill simulations and concept decisions from earlier tools are ready for every new request: gating, cooling, ejection, and how it all turned out at sampling.

    O3

Sources

Why data first, then rights, then AI

60%

Through 2026, Gartner expects organisations to abandon 60% of AI projects that lack AI-ready data.

Gartner · 2025 · on step 1, dataOpen the source (opens in a new tab)
Least privilege

Share sensitive data in LLM apps on a least-privilege basis only, meaning just what a user or process needs.

OWASP GenAI Security Project · 2025 · on step 2, rightsOpen the source (opens in a new tab)
70%

70% of AI’s potential value sits in core functions such as sales, manufacturing and supply chain.

Boston Consulting Group · 2025 · on step 3, intelligenceOpen the source (opens in a new tab)
NorveltaMould makingExample company

Norvelta doesn’t exist. Your company does.

In 20 minutes we show you demi on a case like yours: bring the data together, set the rights, let AI do the work.

Norvelta Formenbau GmbH is made up: a typical company in Tool & Mould Making, not a real one. An estimate from our assumptions, not a promise. You can change every number in the configurator.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases