Who?
Customers, contacts, teams
Customer #2207Drive manufacturer, organisation with the relationship “customer since 2016”K-2207-4Buyer, personOE-VT-AKQuotes & costing
CRMrun by customer #2207
Ebert & Lorenz Maschinenbau GmbH & Co. KG · Villingen-Schwenningen (Germany), family-owned·,
Getting started with AI · Machinery & Plant Engineering
Ebert & Lorenz doesn’t exist. Everything else on this page will feel familiar.
demi turns your systems into one record, carries over your rights and lets AI agents prepare the routine work. First the data, then the rights, then the AI. A person always approves.
What five use cases free up in one business unit
+1,183 h per yearEstimate, not a promise≈ €76,895 per year, calculated cautiouslyStation list
| OP10 | Load, measure shaft | Measuring station |
|---|---|---|
| OP20 | Press-fit gear | Assembly press HP-400 |
| OP30 | Press-fit bearing | Assembly press HP-100 |
| OP40 | Fit retaining ring | Robot |
| OP50 | Test | End-of-line test rig |
| OP60 | Mark, unload | Laser |
World leader in press-fit joining. Family-owned since 1971.
Werner Ebert, a toolmaker from the clock industry, and Rudolf Lorenz, a master electrician at a Schwenningen clock factory, start a business together. Ebert builds the fixtures and Lorenz the controls the clock factories use to assemble their movements.
The quartz watch arrives and the clock factories shrink. Ebert & Lorenz switches to automatic assembly machines, and its new customers are car-parts suppliers between the Black Forest and the Swabian Jura.
The first assembly press with force-displacement monitoring. It grows into the HP series, to this day the heart of almost every line.
The first plant abroad, in Shanghai, close to the customers. Plants in Poznań and Brno follow, plus sales and service in Chicago, Lyon, Modena and Dubai.
The founders have handed over to the next generation: Katrin Ebert and Jonas Lorenz run the group. With the servo-electric HP series, Ebert & Lorenz is the world market leader in press-fit and assembly lines for makers of e-drives and sensors, each line built to a customer’s requirement specification.
This page calculates the five use cases and every figure for one business unit: assembly lines at the main plant in Villingen-Schwenningen.
The problem
The purchasing team of a drive manufacturer writes to Ebert & Lorenz’s sales team. They need a second line like 23-077, for the new shaft W-48 with a second gear, at a cycle time of 16 instead of 18 seconds. Quote due by 27 November.
The requirement specification runs to 240 pages. Everyone here knows line 23-077. What it really cost and what was changed afterwards are spread across three places:
In the ERPThe 2023 quote, costed at 2,950 assembly hours.
In the job files14 changes after the factory acceptance test and an acceptance report with a three-week delay.
In one person’s headThe project manager from back then is commissioning a line in Mexico until the end of the month.
Three engineers search for three hours each. The quote goes out on day 9, at the 2023 price, which wasn’t enough even back then.
LH-2207-W48.pdf240 pages
Requirement spec, shaft W-48Page 37 of 240
… 612 requirements
Together that is 6,040 hours a year, about 3.4 full-time roles. Many of the people who commission a line on their own at a customer’s site are PLC and robot programmers from engineering, where 17 of the 112 reach retirement age by 2030.
Line 23-077, the changes that followed, the job costing: it’s all there, but spread across the ERP, PDM and job folders. The next similar quote still starts from zero.
“Can OP20 manage 16 seconds too? Can the second gear be press-fitted?” An experienced engineer knows the answer, and right now that engineer is at a line on a customer’s site.
Thirty years of press-fitting and testing know-how rest with a few individuals. When they leave, the knowledge leaves with them.
What demi does · An example
demi reads the email and the requirement specification: 240 pages, 612 requirements. Cycle time 16 seconds, shaft W-48 with a second gear.
Three similar jobs, found by stations, cycle time and part family. The closest is 23-077, the same line at the same customer.
The as-built BOM, revision C: 14 changes after the factory acceptance test. The customer runs PLC version 2.4.1.
Assembly costed at 2,950 hours, actual 3,420. Commissioning at OP20 took three weeks longer.
Costing and scope of supply, every line item with its source job. New: station OP25 for the second gear. The 23 requirements that 23-077 doesn’t meet are at the top, starting with the cycle time: 17.6 s at factory acceptance, 16 s required.
Engineering confirms that OP20 can manage 16 s. The sales engineer and costing change two items and approve. The quote goes out on day 4.
The three engineers only spend nine hours searching when a whole line like 23-077 is on the table. The day-to-day business is quotes for single presses and cells, and in the calculation below each of them gives the engineers 32 minutes back.
Office Floor <=> Assembly Floor
demi can work at all 14 stations. Pick a use case and see which ones it touches.
The payoff
| Start | Use case | Volume per month | Share | Today per year | Freed up | Value per year |
|---|---|---|---|---|---|---|
| 1 | Build quotes from similar past ordersSales | 80 × 3 h | 30% | 2,880 h | 518 h | €33,670 |
| 2 | See what a design change affectsEngineering | 40 × 2 h | 30% | 960 h | 173 h | €11,245 |
| 3 | Find existing parts instead of designing newEngineering | 100 × 30 min | 30% | 600 h | 108 h | €7,020 |
| 4 | Find your installed base by serial numberService | 300 × 10 min | 40% | 600 h | 144 h | €9,360 |
| 5 | Spare-part quote from a nameplate photoService | 250 × 20 min | 40% | 1,000 h | 240 h | €15,600 |
| Total | 6,040 h | 1,183 h | €76,895 |
Of 6,040 hours, we count 1,183: volume times time times twelve months, then only the cautious share of that, times 0.6 for partly digital processes. That is about 0.7 full-time roles. Calculated at €65 per hour: €49.50 labour cost in manufacturing according to Destatis, plus workplace, IT and overheads. A number doesn’t fit your company? You can change every one of them in the configurator.
The start
| The first 90 days | Day 1 | Week 1 | Weeks 2 to 4 | Months 2 and 3 |
|---|---|---|---|---|
| Systems | ||||
| Mailboxes, job files | Sales and service mailboxes, job folders, read-only | |||
| ERP, PDM | Read-only, via a small connector in their own network | |||
| CRM, E-CAD | Read-only | |||
| PLC archive | Read-only | |||
| Use cases | ||||
| 1 Quotes | With sign-off. Part of daily work from day 30 | |||
| 2 Design change | With sign-off | |||
| 3 Existing parts | With sign-off | |||
| 4 Installed base | With sign-off | |||
| 5 Spare-part quote | With sign-off | |||
| Writing back | ||||
| Into the ERP | After sign-off | |||
They are the biggest item, 518 hours a year. They only need read access: mailbox and job files from day 1, ERP and PDM from week 1. Everyone already knows every line by its job number. And every draft stays in-house until sales and costing approve it. Engineering follows in week 2, once demi knows the as-built BOMs.
1 Data
An excerpt from Ebert & Lorenz’s record.
Nothing gets replaced. Running a different ERP? demi connects to everything, from SAP and Oracle to the specialist software from the next town. At first, demi only reads. A person connects a system after seeing who will read what.
| Job 23-077 | ERP |
|---|---|
| Customer #2207, Plant 2, Hall 3 | CRM |
| Drawing 23-077-000-001 | PDM |
| Revision C | PDM, 14 change notices |
| Cycle time 18 s | Job files, LH-2207-W40, page 12 |
| PL d, Cat. 3 | Job files, CE technical file 23-077 |
| PLC version 2.4.1 | PLC archive, backup from the customer |
| Control cabinet +S1 | E-CAD |
| Assembly 3,420 h | ERP, job costing NK-23-077 |
| Inquiry A-26-1162 | Mailboxes, Mail #6208 |
Customer #2207 runs line 23-077, an MZ-6 with assembly press HP-400, in Hall 3 of its plant.
Who?
Customer #2207Drive manufacturer, organisation with the relationship “customer since 2016”K-2207-4Buyer, personOE-VT-AKQuotes & costingCRMrun by customer #2207
What kind?
MZ-6Assembly line, six stationsHP-400Assembly press at OP20STL-23-077-CAs-built BOM300-4410Bracket, used in 14 machinesPDM, ERPis an MZ-6 with HP-400
Where?
ST-2207-02The customer’s Plant 2H3-L4Hall 3, line bay 4CRMin Hall 3 since 2024
What’s happening?
T-26-0388Service case: press force at OP20SAT-23-077Site acceptance at the customerERPservice call on this line
Which one exactly?
Job 23-077
SN 24-0142Serial number on the nameplateERPbuilt to job
What applies?
CH-26-0219Opportunity: second line#26-0846Quote for inquiry A-26-1162#23-0112Quote from 2023WV-2207-01Maintenance contractCRM, ERPquote for this line
What’s in writing?
Mail #6208Inquiry with requirement specificationFAT-23-077Factory acceptance testÄM-23-077-14Change 14 of 14PLC 2.4.1Program version at the customerMailboxes, files, PLC archiveis about this line
What should it be?
LH-2207-W40Requirement specification from 2023LH-2207-W48Requirement 4.2.7: 16 s at mostJob filesrequirement for its successor
What do we conclude?
F-26-031OP20 reworked, three extra weeks of commissioningdemifinding about this line
At the pump maker, the pump with its serial number sits in the middle; at the logistics company, the shipment; at the space supplier, the flight unit in orbit. At Ebert & Lorenz, it is the line at the customer’s site. The grid stays, the middle changes.
Job 23-077, “Line 4” at the customer and the folder “Welle Achse 2” are the same line.
Press force in tonnes, kN or N becomes one value in kN.
Every value shows its source, exact location and version. Unclear rows are kept too.
The as-built BOM, revision C, not the one in the quote.
After sign-off, the quote lands in the ERP.
2 Rights
What only costing sees in the ERP, only costing sees in demi. And remote access to a line at a customer goes only to someone the customer has cleared for that service call.
Left to right, the way a job moves through the company.
30 + 22 + 24 + 112 + 24 + 158 + 42 + 8 = 420 people
| Who | Machines at customers | Engineering | Quotes & prices | Costing & margins | Remote access | HR | Approves |
|---|---|---|---|---|---|---|---|
| Sales engineers | reads | reads | own customers | – | – | – | Technical content of the quote |
| Quotes & costing | reads | reads | edits | edits | – | – | Quote, price |
| Project managers | own job | reads | own job | own job | – | – | Acceptance report, change-order quote |
| Engineering | reads | edits | – | – | – | – | Change notice |
| Software & PLC | reads | edits | – | – | per service call | – | PLC version |
| Service | edits | reads | reads | – | per service call | – | Spare-part quote |
| HR | – | – | – | – | – | edits | – |
| Customer #2207 in the portal | own | own docs | own | – | own | – | Remote access per service call |
| Machine agent, AI coworker | reads | reads | – | – | – | – | Never |
| Quote agent, on someone’s behalf | As much as the person who starts it. Never more. | Never | |||||
Every room has keys. They come from your systems and never multiply on their own.
Only the people who do the costing see margins. Project managers see the figures of their own job, nothing else.
An agent carries the keys of the person it works for. An AI coworker has its own, and always a person who is accountable for it. Every access is in the log.
3 Intelligence
Works for the person who starts it
AI coworker, accountable: head of engineering
Works for the person who starts it
AI coworker, accountable: head of service
AI coworker, accountable: head of service
Every draft quote follows the costing scheme in Ebert & Lorenz’s ERP.
Calculations run on Ebert & Lorenz’s own rules and data, not in the language model. Anything that goes out or is written back to a system is approved by a person.
The roadmap
From 20 January 2027 the new EU Machinery Regulation applies. For each job, demi compiles the CE technical file from the risk assessment, the as-built BOM and the PLC version, plus the operating instructions in the language of the country where the line runs. A person signs the declaration of conformity.
Reports, PLC versions and open items for each station land in the record, not on a laptop. Then service knows every version the line has ever had.
Actual hours per station from job costing plan the next assembly. Production orders and parts run in the same record.
Sources
Gartner expects that through 2026, organisations will abandon 60% of AI projects that lack AI-ready data.
Gartner · 2025 · on step 1, dataOpen the sourceExpose sensitive data in LLM apps only on a least-privilege basis: only what the user or process needs.
OWASP GenAI Security Project · 2025 · on step 2, rightsOpen the source70% of AI’s potential lies in core functions such as sales, production and the supply chain.
Boston Consulting Group · 2025 · on step 3, intelligenceOpen the sourceIn 20 minutes we show you demi on a case like yours: bring the data together, set the rights, let AI do the work.
Ebert & Lorenz Maschinenbau GmbH & Co. KG is made up: a typical company in Machinery & Plant Engineering, not a real one. An estimate from our assumptions, not a promise. You can change every number in the configurator.