Skip to content
Rennhardt AerospaceSpace Systems · Neumarkt plantExample company

Rennhardt Aerospace UK Limited · Bristol, since 1936, 14,000 people, 15 locations in 15 countries

Getting started with AI · Aerospace

How a space-industry supplier gets started with AI

Rennhardt Aerospace doesn’t exist. Everything else on this page will feel familiar.

demi turns your systems into one record, carries over your rights and lets AI agents prepare the routine work. First the data, then the rights, then the AI. A person always approves.

+752 h per yearEstimate, not a promise≈ €48,880 per year, calculated cautiously, from five use cases

In orbitSAT-114540 km, 97.5°, sun-synchronous
Customer #3115

  1. Unit · Flight model FM3

    RA-PDU-28-0043

    Type
    PDU-28
    Bus
    28 V
    Outputs
    12 LCL
    Mass
    3.9 kg
  2. Assembly

    LB-0043-2

    LCL board B, one of four in this unit

  3. Component lot

    DC 2433

    Tantalum chip capacitor C214, batch 2433-117

    Manufacturer notice, Tuesday 9:10
The family tree of unit RA-PDU-28-0043: from the satellite down to the component lot. Every value leads to its source.

The problem

Tuesday at 9:10, a component lot comes under suspicion

A manufacturer reports: tantalum chip capacitors from a later lot failed surge current screening, and date code 2433 is under suspicion too. Rennhardt Aerospace bought 1,100 pieces with this date code, batch 2433-117.

Three customers want to know by tomorrow morning whether their satellites are affected. Nine units with this lot are already flying. No single source knows which satellites have the lot on board:

In the ERPBatch 2433-117. Serial numbers are booked as batches there, and there is no as-built list.

In Excel23 as-built lists, one per unit, kept up to date by one colleague.

In the mailboxWhich satellite carries which unit is written in the customers’ emails.

A trace normally takes two hours. This one takes two days, because the lot sits in 23 units.

FromQuality assurance, manufacturer #L-118
ToEEE parts, Rennhardt Aerospace
SubjectCustomer Notice QN-26-044: tantalum chip capacitors, D/C 2433
Email #5512Dear customer, surge current screening of a later lot showed failures. Parts with date code 2433 may be affected. Please check where you have used them and hold your stock until our analysis is complete.
QN-26-044.pdf
Three spellings, one lot
ERP, goods receipt 11/2024Batch 2433-117
CoC-24-3381, page 1Lot 117, D/C 2433
ABCL-0043.xlsx, row 214DC2433

What happens here every month

  1. 10Traces
  2. 400Certificates and CoCs
  3. 30Discontinuations
  4. 200Requirements with test evidence
  5. 100Production files

Together that is 3,080 hours a year, about 1.8 full-time roles. And many EEE parts have lead times of 26 to 52 weeks: put a lot on hold and you may wait up to a year for replacements.

What hurts there

  1. 01
    Data packages are built by hand

    212 documents per unit from eight sources. One wrong date code stops the delivery.

  2. 02
    Non-conformances wait for the board

    The NRB meets on Wednesdays. Until then, whatever is on hold stands still.

  3. 03
    Few people know which test proves which requirement

    The verification matrix lives in exports and spreadsheets, updated by hand before every review.

What demi does · An example

Before noon, each of the three customers knows its affected units

  1. T+0:00

    The notice

    demi reads email #5512 and the PDF: part, manufacturer, date code 2433. Rennhardt Aerospace bought exactly this lot, batch 2433-117, 1,100 pieces.

    Email #5512ERP
  2. T+0:02

    The stock

    180 pieces are still in stock. demi proposes putting them on hold.

    Batch 2433-117
  3. T+0:05

    The assemblies

    920 pieces are fitted, on 64 LCL boards in 23 units. demi reads this from 23 as-built lists, including where DC2433 is written without a space.

    ABCL-0043LB-0043-2
  4. T+0:08

    The orbit

    Nine units are flying, six are built into satellites at the customer, eight are still at Rennhardt Aerospace. For the 15 with customers, demi names the satellite and the customer.

    SAT-114Customer #3115
  5. T+0:41

    The approval

    Product Assurance checks the list, puts the batch on hold, opens NCR-26-0187 and approves three customer notices, each showing only that customer’s own units.

    A person approvesNCR-26-0187
  6. T+0:55

    Out the door

    Three customers have their answer before noon. Approvals and every access are in the log.

    Log

This time the lot sits in 23 units; normally it is one or two. In that case the search takes two hours, and according to the calculation below, demi saves just under 29 minutes of that per trace.

Rennhardt AerospaceSpace Systems · Neumarkt plantExample company

From lot to orbit.

Neumarkt plant: about 1,400 units in orbit, built and tested at the group’s space-systems plant

From aircraft building to flight hardware

  1. Aircraft builders found a workshop for fuselage parts and fittings in Bremen, Germany. The group grows out of it.

  2. The Neumarkt plant in Bavaria adds space: precision parts and fixtures, soon the first flight parts for satellite structures and the first clean room.

  3. Rennhardt Aerospace builds complete units at the Neumarkt plant: power distribution units, hold-down mechanisms, harnesses. One-offs turn into series production. The group lists on the stock exchange, with plants in several countries.

  4. The group builds aerostructures and space systems. About 1,400 units from the Neumarkt plant are flying, each carrying its file with it, from the component lot into orbit.

Profile

Founded
1936 in Bremen, Germany; a listed European company (SE) with plants in 10 countries
People
14,000 in the group. Neumarkt plant: 340 in nine departments, 106 of them in production and AIT. All departments in the org chart
Site
Neumarkt plant, the group’s space-systems plant, with ISO 8 and ISO 7 clean rooms, a shaker and a thermal vacuum chamber
Customers
Satellite makers 38%, constellation operators 27%, space agencies 12%, launch vehicle makers 10%, research 8%, export customers outside Europe 5%
Revenue
€52 million
Works to
ECSS, certified to EN 9100
Systems
ERP, PLM, requirements, CAQ, test data, spreadsheets, file share, mailboxes

Locations

  • BristolUnited Kingdom · PlantRennhardt Aerospace UK Limited
  • BremenGermany · Group HQRennhardt Aerospace SE
  • ToulouseFrance · R&D and plantRennhardt Aerospace France SAS
  • SevilleSpain · PlantRennhardt Aerospace España S.L.U.
  • WichitaUSA · PlantRennhardt Aerospace North America, Inc.
  • São José dos CamposBrazil · PlantRennhardt Aerospace do Brasil S.A.
  • RzeszówPoland · PlantRennhardt Aerospace Polska Sp. z o.o.
  • PragueCzechia · R&DRennhardt Aerospace CZ, s.r.o.
  • TurinItaly · PlantRennhardt Aerospace Italia S.p.A.
  • CasablancaMorocco · PlantRennhardt Aerospace Maroc SA
  • TianjinChina · PlantRennhardt Aerospace (Tianjin) Co., Ltd.
  • Hong KongHong Kong · Sales and financeRennhardt Aerospace (Hong Kong) Limited
  • DubaiUAE · Regional sales and MRORennhardt Aerospace Middle East L.L.C.
  • RiyadhSaudi Arabia · SalesRennhardt Aerospace Saudi Arabia LLC
  • DohaQatar · SalesRennhardt Aerospace Qatar W.L.L.

Four product lines

  • PDPower distribution units
  • HRHold-down and release mechanisms
  • SPSandwich panels with heat pipes
  • HNSatellite harnesses

The payoff

Example calculation: five use cases free up 752 hours a year

≈ €48,880 per yearEstimate, not a promise
StartUse caseVolume per monthShareToday per yearFreed upValue per year
1Trace batches and serial numbers10 × 2 h40%240 h58 h€3,770
2Check material certificates against the order400 × 10 min50%800 h240 h€15,600
3Spot component discontinuations early30 × 90 min40%540 h130 h€8,450
4Trace requirements to the test evidence200 × 15 min30%600 h108 h€7,020
5Compile the production file per lot100 × 45 min40%900 h216 h€14,040
Total3,080 h752 h€48,880

Of 3,080 hours, we count 752: volume times time times twelve months, then only the cautious share of that, times 0.6 for partly digital processes. That is about 0.4 full-time roles. Calculated at €65 per hour: €49.50 labour cost in manufacturing according to Destatis, plus workplace, IT and overheads. Not counted: a delivery date that holds. A number doesn’t fit your company? You can change every one of them in the configurator.

Office Floor <=> Clean Room

Where demi works at Rennhardt Aerospace: eight of 14 stations

demi can work at all 14 stations. Pick a use case and see which ones it touches.

Office Floor

  1. O1Market & programmes 
  2. O2Inquiry 
  3. O3Specification & requirements4
  4. O4Quote 
  5. O6Development & configuration3 4
  6. O7Purchasing & EEE parts2 3
One record. Every fact runs both ways.

Clean Room

  1. S1Production & clean room1 5
  2. S2Environmental test & AIT4 5
  3. S3Product Assurance & NCR2 5
  4. S4Goods receipt, stores & shipping1 2
  5. S6In orbit & feedback1
  • demi works here
  • Next at Rennhardt Aerospace
  • demi can work here too
  • Line: the life of batch 2433-117, from purchasing through stores, production and test into orbit

The start

How Rennhardt Aerospace starts: first the parts mailbox, then the ERP and the as-built lists

Which systems and use cases join in the first 90 days
The first 90 daysDay 1Week 1Weeks 2 to 4Months 2 and 3
Systems
MailboxesEEE parts mailbox, read-only
Programme mailboxesRead-only, separated by customer
ERP, spreadsheets, file shareRead-only, via a small connector in their own network
CAQ, PLMRead-only
Goods receipt mailboxRead-only, certificates and CoCs
Requirements, test dataRead-only
Use cases
1 TraceabilityWith approval. Part of daily work from day 30
2 CertificatesWith approval
3 DiscontinuationsWith approval
4 RequirementsWith approval
5 Production fileWith approval
Writing back
Hold and NCR into the ERP and the CAQAfter approval

Why traceability comes first

Ten traces a month is not many, but a single suspect lot can stop a delivery. Each trace adds to the family tree: which lot sits on which board, in which unit and on which satellite. Most of the hours go into the certificates and production files. Those cases come later, because every certificate and every file is tied to a lot in the family tree.

What Rennhardt Aerospace does itself

  • IT managementTwo days for the connections
  • Export controlOne day to establish which data is export-controlled
  • Product AssuranceTwo weeks of reviewing drafts, alongside normal work

1 Data

Eight systems become one record

1,412Entries
2,096Links
8Systems

An excerpt from Rennhardt Aerospace’s record.

AConnected

  • ERP
    Sales orders, purchase orders, batches, stock, costsSerial numbers are booked as batches
  • PLM
    Drawings, bills of materials, changes, releasesThe released bill of materials is not the one that was built
  • Requirements
    Customer and derived requirements, verification matrixOne module per programme, test reports linked by hand
  • CAQ
    NCRs, NRB minutes, waivers, calibrationLot and serial number sit in free text
  • Test data
    Vibration test, thermal vacuum, EMC, functional testCurves as files on the lab’s drive
  • Spreadsheets
    As-built lists, one per unitThe truth is an Excel file
  • File share
    Procedures, reports, data packages, CoCsOne folder tree per unit, built by hand
  • Mailboxes
    Manufacturer notices, customer emails, certificatesManufacturer notices arrive only here

Nothing gets replaced. Running a different ERP? demi connects to everything, from SAP and Oracle to the specialist software from the next town. At first, demi only reads. A person connects a system after seeing who will read what.

BHeld together

The same chain. Eight systems. Now one entry.
In orbit
SAT-114, 540 km, 97.5°Mailboxes, integration report from customer #3115
Customer #3115ERP, customer master data
Unit
RA-PDU-28-0043ERP, booked as a batch
Flight model FM3File share, delivery note LS-25-0874
PDU-28PLM, bill of materials rev. C
28 V, 12 LCL up to 5 APLM, PDU-28 datasheet, page 3
3.9 kgPLM, PDU-28 datasheet, page 1
Assembly
LB-0043-2, LCL board BSpreadsheets, ABCL-0043.xlsx, row 38
Component lot
DC 2433Spreadsheets, ABCL-0043.xlsx, row 214
Batch 2433-117ERP, goods receipt 11/2024
CoC-24-3381File share, delivery from manufacturer #L-118
Nominal, datasheet3.90 kg ± 0.10PDU-28, rev. C
Measured, weighing3.87 kgRA-PDU-28-0043, test data

CLinked

Customer #3115 operates the satellite SAT-114, with the unit RA-PDU-28-0043 on board, a PDU-28 as flight model FM3.

Who?

Customers, contacts, teams

  • Customer #3115Constellation operator, an organisation with the relation “customer since 2019”
  • K-3115-4Integration lead, a person
  • OE-PA-EEEProduct Assurance, EEE parts

ERPoperated by customer #3115

What kind?

Product series and bills of materials

  • PDU-28Power distribution unit, 28 V, 12 LCL
  • STL-PDU28-CBill of materials rev. C
  • TC-47-25Tantalum chip capacitor 47 μF, 25 V, on the 12 V auxiliary rail

PLM, ERPis a PDU-28

Where?

Satellites and places

  • SAT-114Satellite, 540 km, sun-synchronous
  • RR-2Clean room 2 in Neumarkt, ISO 7

Mailboxesflying on SAT-114 since March 2026

What is running?

Orders and tests

  • FA-25-0442Production order
  • TV-25-0311Thermal vacuum, four cycles

ERP, test databuilt and tested in 2025

Which one exactly?

RA-PDU-28-0043

The individual unit, flight model FM3

  • Its whole family tree flies with it, down to batch 2433-117.

ERP, spreadsheetsunit with a serial number

What applies?

Contracts, approvals, orders

  • V-3115-03Supply contract, 24 FM and 2 FS
  • RFW-0087Waiver for 20 units
  • B-24-0912Purchase order to manufacturer #L-118

ERP, CAQdelivered under V-3115-03

What is written down?

Emails, lists, data packages

  • Email #5512The manufacturer’s notice
  • ABCL-0043As-built list
  • EIDP-0043Data package, 212 documents

Mailboxes, spreadsheets, file sharedescribes this unit

What should it be?

Requirements

  • REQ-PDU-063Current per output up to 5 A
  • DRL-3115The customer’s document list

RequirementsREQ-PDU-063 applies here

What do we conclude?

Findings

  • F-26-058Batch 2433-117 fitted, unit is flying

demifinding on this unit

At the pump maker, the pump with its serial number sits in the middle; at the machine builder, the line at the customer’s site; at the logistics company, the shipment. At Rennhardt Aerospace, it is the flight unit in orbit. The grid stays, the middle changes.

DWhat it can do

  • Recognise

    Batch 2433-117, Lot 117 and DC2433 are one lot. RA-PDU-28-0043 is the same unit in the ERP, in Excel and in the customer’s email.

  • Unify

    Date codes, batches and serial numbers get one format. Every old spelling is kept as a source.

  • Trace

    Every value shows its source, exact location and version. Unclear rows are kept too.

  • Look back

    The unit as it was built, not as the bill of materials looks today.

  • Write back

    After approval, the hold and the NCR land in the ERP and the CAQ.

2 Rights

The org chart becomes the permission system

What a customer writes about its satellite is never seen by a team that works for another customer.

Neumarkt plant: 340 people, nine departments

Management, administration and IT 22Management 2 · Finance 4 · HR 3 · Legal and export control 3 · Assistants 2 · IT 8

Programmes, development and supply chain

  • Sales and programmes 24
    • Programme management 14
    • Sales 6
    • Contracts 4
  • Development 78
    • Electronics 32
    • Mechanics and structures 20
    • Software and FPGA 12
    • Thermal 8
    • Systems engineering 6
  • Configuration and docs 14
    • Configuration management 6
    • Document control 4
    • Data packages 4
  • Purchasing and supply chain 22
    • Purchasing 6
    • EEE purchasing 6
    • Logistics and shipping 6
    • Goods receipt 4

Hardware and quality

  • Production and AIT 106
    • Electronics production 32
    • Mechanics and bonding 24
    • Clean room AIT 34
    • Harnesses 16
  • Test and environment 26
    • Vibration and shock 8
    • Thermal vacuum 8
    • EMC 4
    • Functional test 6
  • Product Assurance 40
    • Management 2
    • Inspectors 14
    • EEE parts 6
    • Materials and processes 4
    • NCR and NRB 4
    • Reliability 4
    • Audits and suppliers 6
  • Service 8
    • Anomaly support 4
    • Repair 4

22 + 24 + 78 + 14 + 22 + 106 + 26 + 40 + 8 = 340 people

Who opens which room

WhoUnits and as-builtEngineeringCustomer programmesPrices and marginsNCR and NRBControlled dataHRApproves
Programme managementown programmereadsown programmeown programmereads––Customer notice, delivery
Developmentreadseditsown programme–readsafter clearance–Drawing, bill of materials
Configuration and docseditsreadsown programme–readsafter clearance–Configuration baseline, as-built list
Purchasing and supply chainreadsreads––reads––Purchase order
Product Assuranceeditsreadsreads–editsafter clearance–Hold, NCR, customer notice, data package
Legal and export controlreadsreadsreads––edits–Export approval
HR––––––edits–
Customer #3115 in the portalownownown–own––Waiver
Traceability agent, AI coworkerreadsreadsassignment only–reads––Never
Data package agent, acting for a personAs much as the person who starts it. No more.Never

Every room has keys. They come from your systems and never multiply on their own.

Controlled data is seen only by those whom export control has cleared. That applies to people and to every agent.

An agent carries the keys of the person it works for. An AI coworker has its own, and always a person who is accountable for it. Every access is in the log.

3 Intelligence

Five agents do the work, people approve

  1. Traceability agent

    AI coworker, accountable: head of Product Assurance

    Trigger
    A manufacturer notice, an NCR naming a lot, a question about a serial number
    Reads
    Batches in the ERP, as-built lists, deliveries, customers’ satellites
    Does
    Follows the lot to the satellite and back to the purchase order, drafts the hold and the customer notices, each customer seeing only its own units
    Approval
    Product Assurance
  2. Certificate agent

    AI coworker, accountable: head of Product Assurance

    Trigger
    Material certificate or CoC by email
    Reads
    Certificate, CoC, purchase order, delivery note, specification
    Does
    Checks material, properties, lot and date code against the order and the limits by fixed rules, and proposes a hold if anything deviates
    Approval
    Product Assurance inspector
  3. Discontinuation agent

    AI coworker, accountable: head of purchasing

    Trigger
    A manufacturer’s discontinuation or change notice
    Reads
    Bills of materials of all programmes, stock, demand, lead times
    Does
    Finds every use, calculates the remaining demand and proposes the last-time buy
    Approval
    Purchasing, management
  4. Data package agent

    Works for the person who starts it

    Trigger
    Someone from the data package team starts it on a unit before acceptance
    Reads
    The customer’s document list, as-built list, test reports, NCRs, CoCs, signatures
    Does
    Compiles the file per lot and the data package per unit, and names who is responsible for each gap
    Approval
    Product Assurance
  5. Verification agent

    Works for the person who starts it

    Trigger
    Someone from systems engineering starts it on a new specification or a test report
    Reads
    Specification, requirements, test plans, test reports, test data
    Does
    Breaks down the specification, proposes the verification method for each requirement, such as test or analysis, and shows the gaps in the verification matrix
    Approval
    Systems engineering

demi checks limits and radiation hardness against Rennhardt Aerospace’s versioned lists.

Calculations run on Rennhardt Aerospace’s own rules and data, not in the language model. Anything that goes out or is written back to a system is approved by a person.

The roadmap

Next: waivers, test slots and anomalies in orbit

  1. Where a waiver ends

    RFW-0087 allows a known deviation for 20 units. Unit 21 shows it too: before acceptance, demi sees that it is no longer covered and drafts the new request to the customer.

    O5
  2. Test slots

    The thermal vacuum chamber is booked for weeks. demi matches the test slots against delivery dates and milestones and warns early when a test will push back acceptance.

    O8
  3. Anomalies in orbit

    When a customer reports something unusual in the telemetry, the unit’s as-built list, test curves and NCRs are ready in minutes.

    S5

Sources

Why data first, then rights, then AI

60%

Gartner expects that by the end of 2026, companies will abandon 60% of AI projects that lack AI-ready data.

Gartner · 2025 · on step 1, dataOpen the source (opens in a new tab)
Least privilege

Share sensitive data in LLM apps only on a least-privilege basis: only what the user or the process needs.

OWASP GenAI Security Project · 2025 · on step 2, rightsOpen the source (opens in a new tab)
70%

70% of AI’s potential lies in core functions such as sales, production and the supply chain.

Boston Consulting Group · 2025 · on step 3, intelligenceOpen the source (opens in a new tab)
Method and all sources
Rennhardt AerospaceSpace Systems · Neumarkt plantExample company

Rennhardt Aerospace doesn’t exist. Your company does.

In 20 minutes we show you demi on a case like yours: bring the data together, set the rights, let AI do the work.

Rennhardt Aerospace SE (Germany) is made up: a typical group in aerospace, not a real company. An estimate from our assumptions, not a promise. You can change every number in the configurator.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases