Skip to content
Wallner+HardtSensor technologyExample company

Measurement and motion, right at the machine

Wallner+Hardt Sensortechnik GmbH & Co. KG, Kaiserslautern (Germany), since 1958, 5,600 people, 4 plants in 4 countries

Getting started with AI · Electronics & Sensors

How a sensor maker gets started with AI

Wallner+Hardt doesn’t exist. Everything else on this page will feel familiar.

demi turns your systems into one record, carries over your rights and lets AI agents prepare the routine work. First the data, then the rights, then the AI. A person always approves.

Wallner+HardtExample calculation
Based in
Kaiserslautern
Since
1958
People
5,600
Revenue
€1.2 billion

What five use cases free up at the home plant

+627 h per yearEstimate, not a promise≈ €40,755 per year, calculated cautiously
Assembly drawing of the round sensor board LP 4410, top side, scale 10 to 1: microcontroller U1, signal conditioning U3, IO-Link transceiver U2, regulator U4, capacitors C1 to C12 and C14, resistors R1 to R9, four contacts J1 to the measuring cell and four contacts J2 to the M12 connector. U1 is circled in green: discontinued, last order date 31 May 2027.U1U3U2U4FC1C2C3C4C5C6C7C8C9C10C11C12C14R1R2R3R4R5R6R7R8R9L1ED1LED1J11234J2DU1 discontinuedPDN dated 16 Nov 2026Last order date31 May 2027TOPBP 4410-01 · Sheet 1/2ESD sensitiveU1 MSL 3: floor life 168 h,otherwise bakeØ 19.55 mm

Parts list, excerpt

Components on the top side of board LP 4410
U1Microcontroller, 32-bit, QFN-32, MSL 3
U2IO-Link transceiver
U3Bridge signal conditioning
U4Voltage regulator 3.3 V
D1TVS diode 33 V
C7MLCC 0603 X7R, second source
J2M12: 1 L+, 2 OUT2, 3 L−, 4 C/Q
PCB
Ø 19.5 mm, 4 layers
Material
FR-4, 1.0 mm, ENIG
Soldering
SAC305, lead-free
Panel
48 boards

Revisions

Revision table of the assembly drawing
D02/2022U1 variant of the same series due to allocation
E07/2023C7 second source approved
F11/2025U4 successor after discontinuation, same footprint
Wallner+Hardt
TitleSensor board WS-4, side TOP
Drawing no.BP 4410-01
Sheet1/2
Scale10:1
The assembly drawing of sensor board LP 4410, top side. As of Monday night, U1 is discontinued. Every value leads to its source.

The payoff

Example calculation for the home plant: five use cases free up 627 hours a year

≈ €40,755 per yearEstimate, not a promise
StartUse caseVolume per monthShareToday per yearFreed upValue per year
1Spot component end-of-life notices earlyEngineering30 × 90 min40%540 h130 h€8,450
2Find alternative parts during shortagesEngineering60 × 60 min30%720 h130 h€8,450
3Find RoHS and REACH substances in your BOMsQuality40 × 60 min40%480 h115 h€7,475
4Answer technical customer questions with sourcesSales200 × 15 min30%600 h108 h€7,020
5Classify products to ECLASS and ETIM300 × 10 min40%600 h144 h€9,360
Total2,940 h627 h€40,755

Calculated for the home plant in Kaiserslautern, not for the whole group. Of 2,940 hours, we count 627: volume times time times twelve months, then only the cautious share of that, times 0.6 for partly digital processes. That is about 0.4 full-time roles. Calculated at €65 per hour: €49.50 labour cost in manufacturing according to Destatis, plus workplace, IT and overheads. A number doesn’t fit your company? You can change every one of them in the configurator.

The problem

Tuesday, 7:40 am: microcontroller U1 is discontinued

Since Friday, 17 change and discontinuation notices have landed in the component inbox. One of them matters: the manufacturer is discontinuing the microcontroller that sits as U1 on board LP 4410. Last order date: 31 May 2027.

U1 sits in the WS-410, the WS-420 and on the IO-Link card of the ST-220, around 40,000 pieces a year in total. The redesign with a new controller and ported firmware takes 15 months. By Friday, management wants to know how many to buy one last time. That can only be worked out with two systems and inside sales:

In the ERPDemand from orders and forecast, 5,500 pieces in stock, 6,000 on order.

In the PLMEverywhere U1 is used: on two boards and in every BOM revision.

In someone’s headInside sales knows which customer variant will keep running for years.

The two component engineers and purchasing crunch the numbers until Friday. The quantity is still an estimate, and it leaves out the IO-Link card.

Component inbox17 new since Friday
  1. PDNMicrocontroller, 32-bit, QFN-32Entire series, last order 31 May 2027 · U1
  2. PCNMLCC 0402 X7R, 100 nFNew production site · C1 to C6
  3. PCNVoltage regulator 3.3 VTape and reel changed · U4
  4. PDNOptocoupler, FU control boardSuccessor named, same package
  5. PCNIO-Link transceiverData sheet rev. C · U2
  6. LTIGBT module, FU-240 power stageLead time now 26 weeks
  7. PCNTVS diode 33 VMarking changed · D1

+ 10 more: packages, data sheets, sites

What happens at the home plant every month

  1. 30discontinuations
  2. 60searches for alternatives
  3. 40product checks for substances
  4. 200technical customer questions
  5. 300products

Together that is 2,940 hours a year, about 1.7 full-time roles. At the home plant, most of it falls on five people: two component engineers, one person for product security and two from product compliance.

What hurts there

  1. 01
    Discontinuations arrive by email

    60 to 120 notices a month, most of them harmless. Which ones hit a board only becomes clear when they are checked against BOMs, stock and demand, and today a person does that by hand.

  2. 02
    Application engineers are the bottleneck

    “Can the WS-410 take pressure peaks of 25 bar? Will it run on 30 V?” The answer is in a data sheet, a test report or an old email. The hard ones among the 200 questions a month wait for the two people who have known the WS-410 longest.

  3. 03
    The CRA already applies

    Since 11 September 2026, you have to report actively exploited vulnerabilities. If one turns up in an open-source library in firmware 4.1 and 4.2 of the ST-220 controller: which devices at which customers carry it? Today, nobody can tell at the push of a button.

What demi does · An example

Two days before the deadline: 40,000 pieces of U1 approved, IO-Link card included

  1. The notices

    demi reads all 17 and matches them to the components. 15 change the tape, package, site, marking, data sheet or lead time. For the optocoupler, the manufacturer names a successor. Only one discontinuation hits without a replacement: U1.

    Component inboxPDN U1
  2. Where U1 sits

    On two boards and in every BOM revision: LP 4410 in the WS-410 and WS-420, built with BOM revisions E and F, and LP 6120 on the IO-Link card of the ST-220.

    SL 1084 4410-FLP 6120
  3. The demand

    Orders, framework agreements, forecast and repairs: around 40,000 pieces a year, 4,100 of them for the ST-220.

    ERPFC-2027
  4. Stock and purchase orders

    5,500 in stock, 6,000 on order. For assembly and testing, production allows for 3% scrap.

    WarehouseBE-26-1187
  5. The proposal

    15 months of demand come to 50,000, or 51,500 with 3% scrap. Minus the 11,500 in stock and on order, that leaves 40,000. On top of that, two candidates for the new controller, each with a data sheet comparison.

    LTB-26-04F-26-112
  6. The approval

    The hardware & components team and purchasing check every number at its source. Management approves 40,000 pieces, two days before the deadline.

    Human approvesLog

Unlike U1, the optocoupler discontinued on Saturday has a successor right away, in the same package. That is the usual case in the component inbox, and the table above reflects only that case, not the days U1 costs.

Wallner+HardtSensor technologyExample company

Measurement and motion, right at the machine. Since 1958.

Wallner+Hardt: world market leader in IO-Link pressure sensors for mobile machines, family-owned in the third generation

Wallner+Hardt builds pressure sensors, rotary encoders, frequency inverters and controllers for mobile hydraulics, machine and plant builders and building services. In IO-Link pressure sensors for the hydraulics of excavators, cranes and tractors, no maker is bigger. The use cases and figures on this page are for the home plant in Kaiserslautern.

From the sewing machine to every machine

  1. Electrical engineer Heinrich Wallner and businessman Otto Hardt set up a workshop in Kaiserslautern. Wallner builds positioning motors and needle position sensors for industrial sewing machines; Hardt sells them and keeps the books.

  2. The first 58 mm incremental encoder, for machine tools. It grows into the DG series.

  3. The sewing machine drive turns into the first frequency inverter.

  4. An in-house thin-film measuring cell on stainless steel. The WS pressure sensors move into the hydraulics of excavators, cranes and tractors and today bring in more than half of revenue.

  5. Plants in Plzeň, Suzhou and Katowice. Sales and application in Strasbourg, Turin, Detroit and Hong Kong.

  6. IO-Link goes into every new sensor. Wallner+Hardt becomes the world market leader in IO-Link pressure sensors for mobile hydraulics. In-house controllers with an IO-Link master follow.

  7. The component crisis: 14 boards redesigned in 20 months, only because parts were missing.

  8. The Wallner and Hardt families hold all the shares. In the third generation, Katharina Wallner (engineering) and Jonas Hardt (sales and finance) run the company. Now come the CRA and demi, starting at the home plant.

Profile

Founded
1958 in Kaiserslautern, by Heinrich Wallner and Otto Hardt. The plus in the name was already on the first door sign
People
5,600 in the group. At the Kaiserslautern home plant, 290 in seven departments, 104 of them in production. All in the org chart
Sites
Home plant in Kaiserslautern with engineering, EMC lab, one SMT line, assembly and test bay. Three plants abroad, four sales companies, all listed below
Customers
Mobile hydraulics 34%, machine and plant building 28%, electrical wholesale 16%, materials handling and lifts 10%, building services 6%, test rigs 6%
Exports
72% of revenue, a good half of it outside Europe
Revenue
€1.2 billion
Per year
Around 7 million devices, 4.5 million of them pressure sensors
Per month
At the home plant, 60 to 120 change and discontinuation notices, around 200 technical customer questions
Systems
ERP, PLM, ECAD library, firmware repository, MES with test stations, CAQ, CRM with tickets, file share and mailboxes

Locations

  • KaiserslauternGermany · Headquarters, engineering, plantWallner+Hardt Sensortechnik GmbH & Co. KG
  • PlzeňCzechia · PlantWallner+Hardt CZ, s.r.o.
  • KatowicePoland · PlantWallner+Hardt Polska Sp. z o.o.
  • SuzhouChina · PlantWallner+Hardt (Suzhou) Co., Ltd.
  • StrasbourgFrance · SalesWallner+Hardt France SAS
  • TurinItaly · SalesWallner+Hardt Italia S.r.l.
  • DetroitUSA · Sales and applicationWallner+Hardt USA, Inc.
  • Hong KongChina · SalesWallner+Hardt (Hong Kong) Limited

Four product lines

  • WSPressure sensors0 to 600 bar, IO-Link, 4–20 mA
  • DGRotary encodersincremental and absolute, Ø 58 mm
  • FUFrequency inverters0.25 to 22 kW, with STO
  • STControllersCODESYS, 8 IO-Link ports

Office Floor <=> Shop Floor

Where demi works at the Wallner+Hardt home plant: eight of 14 stations

demi can work at all 14 stations. Pick a use case and see which ones it touches.

Office Floor

  1. O1Market & product management 
  2. O2Requests & application engineering3 4
  3. O3Data sheets & product data3 4
  4. O4Quote, order & forecast 
  5. O5Production planning 
  6. O6Hardware & components1 2
  7. O7Firmware & product security 
  8. O8Purchasing & materials planning1 2 3
One record. Every fact runs both ways.

Shop Floor

  1. S3Test stations & calibration 
  2. S5Service & repair4
  3. S6Devices at customers 
  • demi works here
  • Next at Wallner+Hardt
  • demi can work here too
  • Path of a customer question about SN 2437-1146: from application engineering via the data sheet and test report to the device at the customer

The start

How Wallner+Hardt starts at the home plant: discontinuations first, then the CRA

Which systems and use cases join in the first 90 days
The first 90 daysDay 1Week 1Weeks 2 to 4Months 2 and 3
Systems
Mailboxes, ERPComponent inbox, BOMs, stock and demand, read-only, via a small connector in their own network
PLM, ECAD library, firmware repositoryRead-only
MES with test stations, file shareRead-only
CRM with tickets, CAQRead-only
Use cases
1 DiscontinuationsWith approval. Part of daily work from day 30
2 Alternative partsWith approval
3 RoHS and REACHWith approval
4 Technical questionsWith approval
5 Classify products to ECLASS and ETIMWith approval
Writing back
Into the ERPPurchase proposal after approval

Why discontinuations come first

A missed last order stops the WS-410, the WS-420 and the IO-Link card of the ST-220 until the redesign is done 15 months later. The use case only needs read access: the component inbox, BOMs, stock and demand are in the record from day 1, every BOM revision from PLM and the ECAD library from week 1. The CRA cannot wait: its reporting obligation has applied since 11 September 2026. So demi reads the firmware repository in week 1 too and, from week 2, the MES, to see which serial number carries which firmware.

What Wallner+Hardt does itself

  • Head of ITTwo days for the connections
  • Head of hardware & componentsOne hour a week
  • Hardware & componentsTwo weeks of reviewing drafts, alongside normal work
  • Product securityReview the first SBOM of the ST-220 together with demi

1Data

Nine systems become one record

1,215entries
1,316links
9systems

An excerpt from the record of the Kaiserslautern home plant.

AConnected

  • ERP
    Items, BOMs, orders, stock, EDI call-offsCustomer variants are kept as special items
  • PLM
    Mechanical design, ECAD releases, changes, BOM revisionsLibrary and item master are maintained twice
  • ECAD library
    Components with symbol and footprint, approved manufacturers per componentThe life-cycle status of each manufacturer part is out of date
  • Firmware repository
    Source code, builds, ticketsRelease notes in the wiki, no SBOM per release
  • MES with test stations
    Test and calibration values per serial number, installed firmwareIts own database, export only as CSV
  • CAQ
    Inspection plans, complaints, 8D reports, test equipmentComplaints and serial numbers are linked by hand
  • CRM with tickets
    Customers, quotes, returns, failure patternsCustomer parameter sets are buried in emails
  • File share
    Supplier declarations, certificates, declarations of conformityWhich declaration belongs to which revision is in the file name
  • Mailboxes
    Component inbox with PCNs and PDNs, customer emailsEvery notice sits here, not with its component in the library

Nothing gets replaced. Running a different ERP? demi connects to everything, from SAP and Oracle to the specialist software from the next town. At first, demi only reads. A person connects a system after seeing who will read what.

BHeld together

The same device. Nine systems. Now one entry.
SN 2437-1146MES, laser marking, week 37/2024
Type WS-410-0010-R-G14-M12-2PLM, ERP
BOM SL 1084 4410PLM: built with revision E, revision F today
Assembly drawing BP 4410-01PLM, sheet 1 of 2
PCB LP 4410PLM: rev. C in the device and today
U1, microcontrollerECAD library, PDN dated 16 Nov 2026 from the mailboxes
Firmware 3.2.1Firmware repository, build 3.2.1+a41c9e
Test report PZ-24-042113MES, test station P3, 10 Sep 2024
Customer #4126, K-4126-03CRM, parameter set from an email
U1 material declarationFile share, as of 01/2026
Specified value, WS-4 data sheet≤ ±0.25% FSNon-linearity, BFSL
Measured value, test report0.06% FSPZ-24-042113, largest deviation

CLinked

Customer #4126 builds pressure sensor SN 2437-1146, a WS-410 with firmware 3.2.1, into one of its packaging machines.

Who?

Customers, contacts, teams

  • Customer #4126 Packaging machine builder, customer since 2012
  • P-4126-02 Electrical design engineer, person
  • OE-EW-HB Hardware & components

CRMbought by customer #4126

What kind?

Types and BOMs

  • WS-410 Pressure sensor with IO-Link, 0 to 10 bar
  • SL 1084 4410-E As-built BOM
  • LP 4410 Sensor board, rev. C
  • U1 Microcontroller, on two boards

PLM, ECAD libraryis a WS-410, revision E

What’s it made of?

Production and lots

  • FA-24-03817 Production order, 480 pieces
  • R-24-071532 Reel of U1, date code 2431
  • P3 Test station for WS-4

MES, ERPmade in week 37/2024

What’s going on?

Questions and returns

  • T-26-0954 Question: how precisely does it switch at 6.0 bar?
  • RMA-26-0311 Return of a WS-410

CRM with ticketsquestion about this device

Which one exactly?

SN 2437-1146

Pressure sensor WS-410, HW 05, FW 3.2.1

  • The serial number reveals HW 05 and FW 3.2.1: which U1 variant and which firmware this exact sensor carries.

MESdevice by serial number

What applies?

Quotes, contracts, parameters

  • #26-0412 Quote for 2027
  • RV-4126 Framework agreement, 3,000 pieces a year
  • K-4126-03 Parameter set: switch point 6.0 bar

CRM, ERPparameters in this device

What’s in writing?

Emails, notices, reports

  • Mail #3318 Parameter set from the customer
  • PDN U1 Discontinuation notice dated 16 Nov 2026
  • PZ-24-042113 Test and calibration report
  • EU-KE WS-4 Declaration of conformity, rev. 7

Mailboxes, file share, MESabout this device

What should it be?

Requirements

  • DB WS-4 Data sheet: ≤ ±0.25% FS
  • CRA SBOM per firmware release
  • RoHS Limits per homogeneous material

File shareapplies to this type

What do we make of it?

Findings

  • F-26-112 U1 discontinued, last-time buy of 40,000 proposed

demifinding on this device

At the pump maker, the pump with its serial number sits in the middle; at the machine builder, the line at the customer’s site; at the space supplier, the flight unit in orbit. At Wallner+Hardt, it is the device, as far as the company knows it: up to the customer who buys it. The grid stays, the middle changes.

DWhat it can do

  • Recognise

    U1, the type in the PDN and the part number in the ERP are the same component.

  • Unify

    bar, kPa and psi from customer questions become one value in bar.

  • Trace

    Every value shows its source, exact location and version. Unclear rows are kept too.

  • Look back

    The BOM that SN 2437-1146 was built with: revision E, not today’s revision F.

  • Write back

    After approval, the last-time buy lands in the ERP as a purchase proposal.

2Rights

The org chart becomes the permission system

What only purchasing sees in the ERP, only purchasing sees in demi. Only engineering changes schematics and firmware, only service changes returns and devices.

Kaiserslautern home plant: 290 people, seven departments

Each department works with what the one before it delivers: engineering with the request from sales, purchasing with the BOM, the SMT line with U1, quality with the populated board, service with the released WS-410.

Management and administration 22Management 2 · Finance and controlling 8 · HR 5 · IT 5 · Assistants 2
  • 1Sales 42
    • Inside & field sales 22
    • Product management 8
    • Application & support 12
  • 2Engineering 64
    • Hardware & components 24
    • Firmware & product security 22
    • Mechanics & measuring cell 10
    • Test bay & EMC lab 8
  • 3Purchasing and logistics 28
    • Purchasing & materials planning 14
    • Stores & shipping 14
  • 4Production 104
    • SMT placement 26
    • Assembly, sensors & encoders 40
    • Assembly, inverters & controllers 22
    • Adjustment & calibration 16
  • 5Quality 14
    • Quality management 9
    • Product compliance 5
  • 6Service 16
    • Repair & RMA 10
    • Technical hotline 6

22 + 42 + 64 + 28 + 104 + 14 + 16 = 290 people

Who opens which room

WhoDevices & serial numbersSchematics & firmwareComponents & discontinuationsPrices & termsCustomer parameter setsHRApproves
Application & supportreads–––edits–Answer to the customer
Inside & field salesown customers––editsreads–Quote, price
Hardware & componentsreadseditsedits–––Alternative part, successor
Firmware & product securityreadseditsreads–reads–SBOM, CRA report
Purchasing & materials planning––editspurchase prices––Purchase order, last-time buy up to the limit
Product compliance––reads–––Material declaration to customers
Repair & RMAeditsreadsreads–reads–Repair, replacement under warranty
HR–––––edits–
Customer #4126 in the portalown––ownown––
Discontinuation agent, AI coworkerreadsreadsreads–––Never
Questions agent, on someone’s behalfAs much as the person who starts it. No more.Never

Every room has keys. They come from your systems and never multiply on their own.

Only sales sees prices, only purchasing sees purchase prices. A last-time buy above the limit is approved by management.

An agent carries the keys of the person it works for. An AI coworker has its own, and always a person who is accountable for it. Every access is in the log.

3Intelligence

Five agents do the work, people approve

  1. Discontinuation agent

    AI coworker, accountable: head of hardware & components

    TriggerNew change or discontinuation notice in the component inbox
    ReadsECAD library, BOMs of every revision, devices by serial number, orders and forecast, stock, open purchase orders
    DoesFinds every affected board and device, calculates remaining demand and the last-time buy, names successors or candidates
    ApprovalHardware & components and purchasing; above the limit, management
  2. Alternative-part agent

    Works for the person who starts it

    TriggerSomeone from hardware & components or purchasing starts it when a delivery is late
    ReadsData sheets, approved manufacturers in the ECAD library, stock, lead times
    DoesCompares value by value and first shows what is already approved in another device
    ApprovalHardware & components, per product
  3. Substance agent

    AI coworker, accountable: product compliance

    TriggerNew Candidate List, customer request via a portal
    ReadsSupplier declarations, BOMs, product data
    DoesFinds substances across the whole BOM. If a declaration is missing, the part counts as open, never as compliant
    ApprovalProduct compliance
  4. Questions agent

    Works for the person who starts it

    TriggerSomeone from application & support starts it on a customer question
    ReadsData sheets, manuals, IODD, test reports, earlier answers, tickets
    DoesDrafts the answer, every sentence with its source. Anything without a source is flagged as open
    ApprovalApplication & support

demi calculates the last-time-buy quantity from demand, stock and open orders in the ERP, with 3% scrap for assembly and testing.

Calculations run on Wallner+Hardt’s own rules and data, not in the language model. Anything that goes out or is written back to a system is approved by a person.

The roadmap

Next up: SMT line, adjustment and stores

  1. Traceability down to the reel

    Today the record knows the reel for each production order. With the SMT line, every reel is added with its date code, lot and moisture sensitivity level, along with its time outside the dry cabinet. Then, for a quality alert from the manufacturer or a bad lot, the affected serial numbers turn up in minutes.

    S1
  2. Adjustment that learns as it goes

    The adjustment values of every serial number, the measuring cell’s offset and temperature drift, show when a measuring-cell lot drifts, before the device leaves the building.

    S2
  3. The last-time buy in stores

    The 40,000 pieces of U1 are reserved per product. demi compares consumption with the redesign and flags it when stock will run out before the board with the new controller goes into series production.

    S4

Sources

Why data first, then rights, then AI

60%

Through 2026, Gartner expects organisations to abandon 60% of AI projects that lack AI-ready data.

Gartner · 2025 · on step 1, dataOpen the source (opens in a new tab)
Least privilege

Share sensitive data in LLM apps on a least-privilege basis only, meaning just what a user or process needs.

OWASP GenAI Security Project · 2025 · on step 2, rightsOpen the source (opens in a new tab)
70%

70% of AI’s potential value sits in core functions such as sales, manufacturing and supply chain.

Boston Consulting Group · 2025 · on step 3, intelligenceOpen the source (opens in a new tab)
Wallner+HardtSensor technologyExample company

Wallner+Hardt doesn’t exist. Your company does.

In 20 minutes we show you demi on a case like yours: bring the data together, set the rights, let AI do the work.

Wallner+Hardt Sensortechnik GmbH & Co. KG is made up: a typical company in Electronics & Sensors, not a real one. An estimate from our assumptions, not a promise. You can change every number in the configurator.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases