Job costing per order at a glance

You see which jobs really make money and why, and carry that into the next quote.

Today

Whether a job made money is often known months later, sometimes never. Job costing gets postponed because hours, material and outside work sit in different systems. So the same costing mistakes turn up again in every new quote.

An example

At Rabenhammer Präzisionsteile, job 23-118 closes: 400 flanges FL-60 in 42CrMo4. CNC programming took 26 hours instead of the 8 planned. The agent shows that three drawing changes from the customer caused it, none of them invoiced, and flags two open quotes with the same pattern.
Fictional company, typical workflow.

Your data, wherever it lives

Today the cost estimate sits in spreadsheets, the quote as a PDF in the job folder, booked hours in the MES, material issues, outside work and invoices in the ERP, and the customer's drawing changes in e-mails. demi reads, understands and links them per job, with your rights. The AI puts planned and actual side by side per cost element in minutes and explains big variances with their postings, instead of job costing being left undone, and estimating and project management draw the lessons for the next quote.

Where the data lives today

  • Office files
  • PDFs
  • Folders & drives
  • MES
  • ERP
  • E-mails
Data LayerOne view of everything, with your rights

How demi solves it

Three layers in this order: connect the data first, then the rights, then the AI.

  1. 1 · ConnectData Layer

    Data sources in this case: ERP, MES and spreadsheets. demi replaces nothing and links quote, cost estimate, booked hours, material issues, outside work and invoices into one record per job, with planned and actual side by side for each cost element.

  2. 2 · PermitPermission Layer

    Margins and actual costs are visible only to costing, finance and management; anyone reusing a result for a new quote sees hours and quantities. Costing and the project manager review the result and approve it, and this is recorded.

  3. 3 · ActIntelligence Layer

    demi computes actual costs and the gap per cost element exactly from the bookings; the language model only words the explanation. The agent explains large gaps with the records behind them.

How it runs

  1. 1

    A job is closed or reaches a milestone.

  2. 2

    The agent collects every booking and sets it against the cost estimate.

  3. 3

    Large gaps get an explanation, each pointing to the booking.

  4. 4

    Costing and the project lead review the result and add what is missing.

  5. 5

    The lesson is ready the next time a similar job is quoted.

What changes

  • You know which jobs actually make money

  • Costing errors are found and fixed

  • Customer changes get invoiced instead of forgotten

What does it bring you?

Check it with your own numbers

Every starting value is an assumption you can change. The calculation sits right below, step by step.

Assumption, editable

Your numbers

Result

+216 hfreed per year

Assumptions and calculation

demi puts estimate and actual cost per order side by side and explains the gap; you draw the lessons.

45 min → 27 min per case

How does it run today?

What is already digital saves less: the factor lowers the share demi brings.

How we calculate

60 orders × 45 min × 40% × 1.0 (manual) × 12 months = 12,960 min = 216 h

Value per year, before demi costs

Freed per year+216 h

Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.

= Value per year, before demi costs

+€14,040

gained per year

216 h ÷ 1,760 h per role = 0.1 full-time roles

An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.

Combine with more cases and get the package

Questions about this use case

Which costs go into the job costing?

Everything that is booked: hours per operation, material, outside work, tooling and invoices. You define which cost elements and overheads apply. If a booking is missing, the agent shows the gap instead of estimating a value.

When is the result available?

As soon as the bookings are in, not at year end. You can also look at a job midway, for example after design or the first delivery. That way you can step in while the job is still running.

Does this improve future quotes?

Yes, that is the point. For the next similar job the agent shows where earlier calculations were off and proposes adjusted hours. Price and times are still decided by costing.

What if hours were booked wrongly or to the wrong job?

Then it shows up in the job costing, because the gap has no matching explanation. The agent flags such bookings for review. The correction is made in your own booking system, and demi then checks against the current state.

See this case with your data

In the demo we show you the workflow on your own systems.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases