Today
Contract manufacturers receive many inquiries with drawings and manage to quote only some of them in time. Costing depends on a few experienced estimators.
An example
Rabenhammer Präzisionsteile receives a drawing for 500 shafts in 42CrMo4, Ø 40 h6, L 320 mm, hardened to HRC 58. The agent finds three similar shafts and proposes turning, hardening and grinding with the recorded times. Hardening is costed as outside work at the heat-treater's last price.
Your data, wherever it lives
Requests arrive today by e-mail with drawings as PDFs or CAD files, routings and actual costs of similar parts sit in the ERP, old drawings in the PLM, material prices and machine hour rates in the estimators' spreadsheets. demi reads, understands and links them, with your rights. The AI drafts the costing with similar parts and recorded times in a few minutes, and costing checks the price and approves the quote.
Where the data lives today
- E-mails
- PDFs
- CAD & drawings
- ERP
- PLM
- Office files
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
Data sources in this case: the ERP, PLM and spreadsheets. demi replaces nothing and links the drawing with material prices, machine hour rates, routings of similar parts and actual job costs.
- 2 · PermitPermission Layer
Hour rates and margins are visible only to costing. An estimator approves the quote before anything is written back, and the approval is recorded.
- 3 · ActIntelligence Layer
The agent reads material, dimensions, tolerances and surfaces from the drawing, finds similar parts and proposes operations and times from recorded jobs, each with its source. It computes the price with your fixed rates; the language model only reads the drawing.
How it runs
- 1
The inquiry arrives by e-mail with a drawing.
- 2
The agent reads material, dimensions, tolerances, surfaces and quantity.
- 3
It finds similar parts and takes over their operations and recorded times.
- 4
Material, machine time and outside work are costed with your rates.
- 5
Costing reviews, adjusts and releases the quote.
What changes
More inquiries get a quote
The same costing logic in every quote
Faster answers to buyers
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+324 hfreed per year
Assumptions and calculation
demi reads material, dimensions and tolerances from the drawing and pre-costs the part; you check the price.
45 min → 31.5 min per case
How we calculate
120 drawing enquiries × 45 min × 30% × 1.0 (manual) × 12 months = 19,440 min = 324 h
Value per year, before demi costs
Freed per year+324 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€21,060
gained per year
324 h ÷ 1,760 h per role = 0.2 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Which drawings can it read?
PDF drawings and scans, multi-page drawing sets included. It reads material, dimensions, tolerances, fits, surface specifications and the title block. Values it is unsure about are flagged right on the drawing, so costing can check them.
How does it handle surface treatments we buy in?
As outside work with its own cost block. The agent uses the supplier's last price or valid quote for hardening, coating or plating. Those prices sit in your ERP. If a price is missing, it flags the line instead of guessing.
Does it keep material surcharges current?
The agent costs with the material prices and surcharges in your ERP or price table, as of the quote date. When purchasing changes a surcharge, it applies from the next quote. The draft states which version was used.
Who can see our machine hour rates?
Only costing. Sales sees the quoted price and the delivery date, but no rates or margins. The team can work on inquiries without the cost base spreading.
