Who?
Customers, contacts, teams
Customer #7052Deli food maker, customer since 2011K-7052-3Quality manager, personOE-QSQuality & regulatory
ERP, portalgoes to customer #7052
Polivo UK Limited · Leeds·,
Getting started with AI · Plastics & Packaging
Polivo doesn’t exist. Everything else on this page will feel familiar.
demi turns your systems into one record, carries over your rights and lets AI agents prepare the routine work. First the data, then the rights, then the AI. A person always approves.
What five use cases free up at the home plant
+385 h per yearEstimate, not a promise≈ €25,025 per year, calculated cautiouslyCarton labelBatch 26-314-2-0710 Nov 2026 · Shift 2 · TFA 07
What the base revealsBE-500-R50
The problem
In the injection moulding shop of the Weißwasser home plant, 36 machines and around 120 moulds are running. The toolroom works out when a mould is due for maintenance, from shot counts in the MES and intervals in a notebook. The ERP knows whether the spare inserts are in stock. Production planning knows when the next changeover window is coming. Nobody sees it all together.
Shift log SGM 07 · Early shift
The mould stands idle for 31 hours, 180,000 closures go to sorting, and on Friday the dairy gets a partial delivery. It had been due for three weeks. Only a notebook knew.
SG-3802Tool card
Closure VS-38 T, 38 mm, tethered · 48 cavities, valve-gated hot runner · on SGM 07, 350 t, 3.6 s cycle
Cavity runningFlash, shut off: 17 and 32
Together that is 1,740 hours a year, about 1.0 full-time roles. Twelve toolmakers keep the notebooks for the moulds, and the four oldest of them retire by 2030.
Which parameters really run stably on which machine with which mould: only the colleague who dialled in the item knows. If that colleague isn’t around, it’s trial and error again, and the machine stands idle.
Shot counts in the MES, repairs in the notebook, spare inserts in the ERP, sample reports on the network drive. Anyone who looks it up often finds the state of two repairs ago.
Brand owners bring their own portals, test specifications and questionnaires. Which formulation is approved for which customer, nobody can say at the push of a button.
The payoff
| No. | Use case | Volume per month | Share | Today per year | Freed up | Value per year |
|---|---|---|---|---|---|---|
| 1 | Plan mould maintenance by shot countToolroom | 40 × 30 min | 40% | 240 h | 58 h | €3,770 |
| 2 | Pre-fill 8D reports with real case dataQuality | 15 × 3 h | 30% | 540 h | 97 h | €6,305 |
| 3 | Trace batchesQuality and logistics | 10 × 2 h | 40% | 240 h | 58 h | €3,770 |
| 4 | Answer customer substance questionnairesQuality, regulatory | 30 × 60 min | 40% | 360 h | 86 h | €5,590 |
| 5 | Prove your recycled contentQuality, sustainability | 20 × 90 min | 40% | 360 h | 86 h | €5,590 |
| Total | 1,740 h | 385 h | €25,025 |
Calculated for the Weißwasser home plant. Of 1,740 hours, we count 385: volume times time times twelve months, then only the cautious share of that, times 0.6 for partly digital processes. That is about 0.2 full-time roles. Calculated at €65 per hour: €49.50 labour cost in manufacturing according to Destatis, plus workplace, IT and overheads. A number doesn’t fit your company? You can change every one of them in the configurator.
What demi does · An example
The same autumn on SGM 07, with demi. Maintenance lands on the desk seven weeks earlier and fits into a stop that happens anyway.
demi works it out from the shots booked in the MES: SG-3802 will reach 6.0 million in about 30 days. The toolroom gets the alert, not the notebook.
Insert of cavity 17 replaced in March, two flash reports on 17 and 32 since August. Spare inserts for both cavities: not in stock.
demi drafts the purchase order for the inserts. The toolroom confirms, purchasing places the order. Three weeks’ lead time is now enough.
The inserts are in. On Thursday 15 October, SGM 07 changes colour anyway. demi puts the maintenance into this stop, production planning approves.
Nine hours during the colour change instead of 31 hours in the middle of an order. Inserts 17 and 32 replaced, counter and file up to date. As the owner, the dairy gets the maintenance record; Polivo’s internal costs stay in-house.
SGM 07 runs on 48 of 48 cavities. The 1.2 million VS-38 T closures for the dairy ship on Friday, in full.
The 31 hours on SGM 07 are the costly exception: most mould maintenance jobs don’t save a delivery date. In the table above, each maintenance job is counted at just 30 minutes of planning.
Every cup knows its month.
Polivo makes cups, closures, trays and films for food and cosmetics, in plants in Germany, Poland and Czechia. In yoghurt and dessert cups made of food-contact rPET, the family company is the world market leader. Customers ask about recycled content, food contact compliance and approvals. The use cases and figures on this page are calculated for the home plant in Weißwasser.
For the glassworks of Weißwasser, at the time one of the largest glassmaking centres in the world, the mould maker Emil Voigt builds iron moulds for pressed glass.
Alongside the glass moulds, the first polystyrene cups appear; in town they are soon just called “Poli-Voigt”. Every mould gets a date clock, the mould maker’s mark. Every mould still has one today.
Ingrid Voigt, the founder’s granddaughter, buys back the business the GDR had nationalised in 1972. She gives it the cups’ old nickname: Polivo.
The first thermoforming line starts up, for yoghurt cups that go to dairies in Saxony and Brandenburg.
The first plant abroad: in Liberec, Polivo moulds lids and closures. The Łódź plant for cups and trays follows in 2011.
Polivo has extruded its own film since 2009, and since 2015 with rPET from registered recycling processes. That makes it the world market leader in dairy cups made of recycled material. By 2021, sales companies in Lyon, Leeds and Charlotte have joined.
Jana and Martin Voigt run Polivo in the fourth generation: six sites in six countries, 1,800 people. The EU Packaging Regulation has applied since August, and every customer wants to know what is in their cup.
Office Floor <=> Moulding Floor
demi can work at all 14 stations. Pick a use case and see which ones it touches.
The start
| The first 90 days | Day 1 | Week 1 | Weeks 2 to 4 | Months 2 and 3 |
|---|---|---|---|---|
| Systems | ||||
| Mailboxes, customer portals, CAQ | Quality inbox, portals and CAQ, read-only | |||
| ERP, MES | Read-only, via a small connector in their own network | |||
| Warehouse management, dosing logs | Read-only | |||
| Maintenance, toolroom notebooks | Read-only, notebooks scanned | |||
| Use cases | ||||
| 2 8D reports | With approval. Part of daily work from day 30 | |||
| 3 Traceability | With approval | |||
| 4 Substance questionnaires | With approval | |||
| 1 Mould maintenance | With approval | |||
| 5 Recycled content | With approval | |||
| Writing back | ||||
| Into the ERP and the tool file | After approval | |||
The 8D reports free up the most, 97 hours a year, and all demi has to do for them is read: the CAQ already knows every complaint with its batch and cavity, and from week 1 the MES adds the machine data. Traceability and questionnaires depend on stock movements and dosing logs, and those are in the record from week 2. Mould maintenance needs the toolroom’s notebooks. demi reads them in by week 4, and from month 2 the tool agent does the planning.
1Data
An excerpt from Polivo’s record.
Nothing gets replaced. Running a different ERP? demi connects to everything, from SAP and Oracle to the specialist software from the next town. At first, demi only reads. A person connects a system after seeing who will read what.
| 1Formulation REZ-PET-50R-03, 01 PET | Dosing log, film line EXT 2, roll 26-1874 |
|---|---|
| 2Date clock 11/26 | Tool file TF-0420, set on 2 Nov |
| 3Cavity 14 of 24, TF-0420 | Tool file, cavity measurement in the CAQ |
| 4Item BE-500-R50 | ERP, customer item 7052-0500 |
| 5DoC BE-500-R50 v4 | CAQ, under Regulations (EU) 10/2011 and 2022/1616 |
| Batch 26-314-2-07 | MES, order FA 26-04812 |
| rPET lot R26-0918 | ERP goods receipt, certificate from the mailbox |
| Migration test 26-M-0412 | CAQ, lab report |
| 15 pallets, each with its own SSCC | Warehouse management |
| Customer #7052, LS 26-118733 | ERP, customer portal |
Customer #7052 receives batch 26-314-2-07: cups BE-500-R50 from the 24 cavities of tool TF-0420, with 50% rPET from lot R26-0918. This one comes from cavity 14.
Who?
Customer #7052Deli food maker, customer since 2011K-7052-3Quality manager, personOE-QSQuality & regulatoryERP, portalgoes to customer #7052
What kind?
BE-500-R50500 ml cup, 50% rPETREZ-PET-50R-03FormulationSPEC 7052-0500Customer specification, Rev. 06ERP, portalis a BE-500-R50 to formulation 03
Where?
TFA 07Thermoforming line, North plantTF-0420Thermoforming tool, 24 cavitiesCavity 14with date clock 11/26MES, maintenanceformed on TFA 07
What’s going on?
FA 26-04812Production orderPA 26-3318Top-load sample testMES, CAQproduced in FA 26-04812
Which one exactly?
Batch 26-314-2-07
MESbooked in shift 2
What applies?
DoC BE-500-R50 v4Declaration of complianceRV-7052-2026Framework agreement with price adjustment clauseRN 2026-Q4-7052Recycled-content record, Q4, due at quarter endCAQ, ERPapplies to this batch
What’s in writing?
26-M-0412Migration reportR26-0918Supplier’s rPET certificateLS 26-118733Delivery noteMail #5520Call-off for week 46CAQ, warehouse, mailboxesabout this batch
What should it be?
SPEC 7052-0500Top load ≥ 250 NSPEC 7052-050050% rPET per quarterCustomer portalrequirement for this batch
What do we make of it?
F-26-044Top load at cavity 14 at the low end of the spread, keep watchingdemifinding on this batch
At the pump maker, the pump with its serial number sits in the middle; at the machine builder, the line at the customer’s site; at the space supplier, the flight unit in orbit. At Polivo, it is the batch: a cup has no serial number, but it carries its cavity and its month, and its batch knows the day. The grid stays, the middle changes.
Cavity 14, impression 14 and “mould 0420/14” are one and the same.
The labels Stauchwert, top load and axial load become one value in newtons.
Every value shows its source, exact location and version. Unclear rows are kept too.
The formulation actually dosed for this film roll, not the one in the master record.
After approval, the hold and the purchase order land in the ERP.
2Rights
What only Quality sees in the ERP, only Quality sees in demi. Formulations stay in-house, even when a customer asks. And the owner of a customer mould sees its file, without Polivo’s costs.
The call-off arrives in inside sales, the finished pallet waits in the warehouse and every department in between has a hand in making the cup. The chart shows the home plant; the whole group has 1,800 people.
18 + 16 + 10 + 15 + 146 + 22 + 18 + 15 = 260 people
| Who | Formulations | Complaints & 8D | Specifications & prices | Tool files | Certificates & declarations | HR | Approves |
|---|---|---|---|---|---|---|---|
| Sales & customer service | – | reads | own customers | – | reads | – | Quote, price |
| Application engineering | edits | reads | specifications | reads | reads | – | Formulation, first samples |
| Quality & regulatory | reads | edits | specifications | reads | edits | – | Hold, 8D, declaration |
| Toolroom | – | reads | – | edits | – | – | Mould maintenance |
| Production shift supervisors | own line | reads | – | reads | – | – | First-off approval |
| Purchasing & planning | – | – | specifications | reads | suppliers | – | Purchase order, changeover window |
| HR | – | – | – | – | – | edits | – |
| Customer #7019 in the portal | – | own | own | own mould | own | – | Repairs at its own cost |
| Tool agent, AI coworker | – | – | – | reads | – | – | Never |
| Questionnaire agent, on someone’s behalf | As much as the person who starts it. No more, and never formulations in an answer. | Never | |||||
Every room has keys. They come from your systems and never multiply on their own.
Only those who develop or test formulations see them. A customer sees its own complaints, its declarations and the file on its own mould.
An agent carries the keys of the person it works for. An AI coworker has its own, and always a person who is accountable for it. Every access is in the log.
3Intelligence
Like the maintenance board in the toolroom: every card is an agent, with its trigger, sources, work and the person who approves.
AI coworker, accountable: head of the toolroom
Works for the person who starts it
AI coworker, accountable: head of quality
Works for the person who starts it
AI coworker, accountable: head of regulatory & sustainability
AI coworker: its own keys, a person is accountable for itOn someone’s behalf: the keys of the person who starts it
demi works out a mould’s due date from the booked shots, the recycled content by mass balance from goods receipts and dosing logs, and affected quantities from pallets and deliveries.
Calculations run on Polivo’s own rules and data, not in the language model. Anything that goes out or is written back to a system is approved by a person.
The roadmap
Around 600 call-off lines a month, and far from all of them come in by EDI. Inside sales scrapes the rest together from customer portals and emails. demi brings those lines into the ERP, checks every line against stock and the framework agreement and shows deviations before anyone confirms.
A lighter cup, a new lid, a new IML decoration: demi puts together the initial sample inspection report from drawing, measurements and approvals and shows every change to mould and item.
Colour and mould changes on 36 injection moulding machines and eight thermoforming lines: demi proposes the changeover sequence for the whole week, not just the window for one maintenance job. On the film lines, demi shows for each roll how much trim skeleton flows back as regrind.
Sources
Through 2026, Gartner expects organisations to abandon 60% of AI projects that lack AI-ready data.
Gartner · 2025 · on step 1, dataOpen the source (opens in a new tab)Share sensitive data in LLM apps on a least-privilege basis only, meaning just what a user or process needs.
OWASP GenAI Security Project · 2025 · on step 2, rightsOpen the source (opens in a new tab)70% of AI’s potential value sits in core functions such as sales, manufacturing and supply chain.
Boston Consulting Group · 2025 · on step 3, intelligenceOpen the source (opens in a new tab)In 20 minutes we show you demi on a case like yours: bring the data together, set the rights, let AI do the work.
Polivo Kunststoffverpackungen GmbH & Co. KG is made up: a typical company in Plastics & Packaging, not a real one. An estimate from our assumptions, not a promise. You can change every number in the configurator.