Today
Every site enquiry is priced on the phone with a freight-zone table and a calculator. How far the site really is on roads fit for trucks, and which declaration of performance matches grade and required standard, someone works out from scratch every time. By the time the quote is ready, the contractor has often ordered from the next quarry.
An example
At Montanis Hartsteinwerke, a road builder sends an e-mail enquiry for 2,400 t of 0/32 crushed stone base course to TL SoB-StB 20 for a municipal road, laying from 12 May, site 38 km away. The agent routes via the main road, because the shorter route crosses a bridge rated for only 7.5 t, and with 25 t payload per load from the weighbridge data arrives at 96 loads over four laying days. Ex-works price, haulage per tonne and tolls appear separately in the draft, together with the declaration of performance for 0/32 to DIN EN 13242. The salesperson grants a volume discount on the ex-works price and sends the quote after 20 minutes.
Your data, wherever it lives
Enquiries arrive today by e-mail, as a bill of quantities in a PDF or as a note from a phone call; prices sit in the ERP, haulage rates in spreadsheets, declarations of performance in document storage and weighing data at the weighbridge. demi reads, understands and links them with map data, with your rights. The AI prices material and haulage on the real route within minutes, and your sales team decides on the price.
Where the data lives today
- E-mails
- PDFs
- ERP
- Office files
- DMS & archive
- Web & portals
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
Data sources in this case: enquiries by e-mail, the ERP, haulage rates in spreadsheets, declarations of performance and test reports in document storage, map data and weighbridge data. demi replaces nothing and links every enquiry to customer and price list, grades and stockpile levels, earlier loads to the same area and the valid declaration of performance for each grade. Haulage is priced on real routes, not as the crow flies.
- 2 · PermitPermission Layer
Ex-works prices, haulage rates and customer discounts are visible only to sales and dispatch. Sales management approves quotes above a set quantity or with special prices. Declarations of performance go to the customer only in their valid, approved version, and every approval is recorded.
- 3 · ActIntelligence Layer
The agent reads site, grade, grading, quantity and date from the enquiry, even from a bill of quantities, and matches them to your grades. It calculates route, driving time, tolls and number of loads by fixed rules from map data, your haulage rates and the payload from your weighbridge data. If no grade meets the required standard or the access is unclear, it says so before calculating.
How it runs
- 1
The enquiry arrives by e-mail, as a bill of quantities or as a note from a phone call.
- 2
The agent reads site, grade, grading, quantity and date and matches the grade to your range.
- 3
From map data it calculates route, driving time and tolls, from your weighbridge data the payload per load.
- 4
Ex-works price, haulage per tonne and the valid declaration of performance go into the draft quote.
- 5
Sales checks it, adjusts the price and sends the quote.
What changes
Quotes arrive while the contractor is still comparing
Haulage priced on real routes instead of freight zones
The right declaration of performance comes with every quote
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+240 hfreed per year
Assumptions and calculation
demi reads the enquiry, prices material and haulage and attaches the declaration; you check it.
25 min → 15 min per case
How we calculate
120 site enquiries × 25 min × 40% × 1.0 (manual) × 12 months = 14,400 min = 240 h
Value per year, before demi costs
Freed per year+240 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€15,600
gained per year
240 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
How does demi calculate haulage to the site?
With your haulage rates, for example per tonne and kilometre or per hour and vehicle, on the real truck route with closures, weight limits and toll roads. The payload per load comes from your weighbridge data. Every value in the quote shows where it comes from.
Which declaration of performance does demi attach?
The valid version for exactly the grade being quoted, matching the standard in the enquiry, such as DIN EN 13242 for base course or DIN EN 13450 for railway ballast. If none of your grades meets the required standard, demi says so instead of attaching the wrong declaration.
What if the enquiry gives no exact address?
Then the agent locates the site by road, plot or coordinates from the bill of quantities and shows it on the map. If access is unclear, it proposes a question to the customer, and your sales team confirms the unloading point.
Does demi check whether there is enough material in stock?
Yes. demi compares the requested quantity with stockpile levels and quantities already promised in the ERP. If stock will not last until the laying date, demi shows this in the draft and proposes split deliveries or an equivalent grade; your sales team decides.
