Today
A quote is written under time pressure, from templates, old quotes and e-mails. Then a data sheet in an old revision is attached, the copper surcharge is missing, the payment terms depart from your policy, or the cover letter says “maintenance-free” or “penalty accepted”. None of these errors shows until the order is signed and starts costing money.
An example
Wattaris is about to quote six compact substations with 630 kVA transformers TR 20/0.4 kV, Dyn5, ONAN to a solar park operator. Before sending, the agent flags four points: the copper surcharge is missing, which puts the price 3% below the floor; the attached data sheet is revision B, while revision C with changed loss values is released; the cover letter says “maintenance-free for its whole service life”, which your policy does not allow; and the promised ten weeks do not match the switchgear shop, which cannot deliver before 14 weeks. The sales engineer adds the surcharge, swaps the data sheet, deletes the sentence and writes 15 weeks; the head of sales releases the quote.
Your data, wherever it lives
A quote is built today from Word templates and old quotes; costing and costs sit in the ERP, drawings and data sheets in the PLM, terms of sale and policies in the DMS, agreements with the customer in the CRM and e-mails. demi reads, understands and links them, with your rights. The AI checks every quote within minutes, and you decide what goes out.
Where the data lives today
- ERP
- CRM
- PLM
- DMS & archive
- E-mails
- Office files
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
Data sources in this case: the ERP, the CRM, the PLM, the DMS and e-mail. demi replaces nothing and links the draft quote with costing and costs in the ERP, the customer record and earlier agreements in the CRM, the released drawings and data sheets in the PLM, your terms of sale and policies in the DMS and the e-mail thread with the customer. So demi checks the quote against what applies, not against a template.
- 2 · PermitPermission Layer
Costs and margins are visible only to those who see them today; the check report shows sales the result, such as a price below the floor, without the costing behind it. Deviations above your thresholds go to the person who may approve them. What was checked, accepted or corrected is logged.
- 3 · ActIntelligence Layer
The agent checks price against cost and minimum margin, terms against your policy, lead time against capacity and replenishment, attachments against the released revisions and the text for risky promises. It recognises such promises by meaning, not only by keyword: “no maintenance needed” counts like “maintenance-free”. Every flag shows its location, the rule and a proposal; sales decides.
How it runs
- 1
The quote is ready: cover letter, items, terms and attachments exist as a draft.
- 2
The agent checks price against cost, terms against your policy and lead time against capacity.
- 3
It compares every attachment with the released revision and reads the text for risky promises.
- 4
Every deviation appears with its location, the rule and a correction, sorted by weight.
- 5
You correct it or obtain the approval; only then does the quote go out.
What changes
Wrong revisions and forgotten surcharges found before sending
Risky promises caught before they are signed
The same check for every quote, even under time pressure
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+144 hfreed per year
Assumptions and calculation
demi checks each quote against costs, policy, capacity and revisions; you correct and release it.
15 min → 9 min per case
How we calculate
120 quotes × 15 min × 40% × 1.0 (manual) × 12 months = 8,640 min = 144 h
Value per year, before demi costs
Freed per year+144 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€9,360
gained per year
144 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Which points does demi check before sending?
The ones you define. Typical are price against cost and minimum margin, surcharges, payment terms, liability and warranty against your policy, lead time against capacity, attachments against the released revision, and the text for promises such as “maintenance-free” or “penalty accepted”. The list grows with every case you add.
Does demi spot risky promises that are worded differently?
Yes. The agent reads by meaning: “no maintenance required” or “needs no servicing” count like “maintenance-free”, “liquidated damages acknowledged” like “penalty accepted”. Every finding appears in the check report with its location, and you decide whether the sentence stays.
Does the check hold the quote up?
No. The check runs within minutes once the draft is ready. Without findings you carry on; with findings you see location and proposal and correct on the spot.
Who may release a quote despite a finding?
Whoever may do so today: sales management for a price below the floor, management or the legal department for deviating liability terms. You set the thresholds and responsibilities, and every release is logged.