Today
From 20 January 2027 the EU Machinery Regulation replaces the Machinery Directive. Every machine type placed on the market after that date needs a risk assessment that covers new requirements, such as protecting the control system against corruption, plus a new declaration of conformity and matching instructions. Anyone who builds, links or substantially modifies their own lines counts as the manufacturer for them. Nobody can see at a glance which file has which gaps.
An example
Tannried Möbelwerk links and extends part of its own lines and keeps 9 CE files for them, from the panel saw with a robot loader to the paint line. A new edge-banding line and a rebuild of the assembly line are due in 2027. The agent lays the new regulation next to the files and templates: the edge-banding line's remote maintenance access needs protection against corruption and a log of interventions, the risk assessment template does not yet know the new requirements, and the rebuild lacks an assessment of whether it is substantial. The head of engineering assigns the tasks and releases the roadmap.
Your data, wherever it lives
Risk assessments sit as Word files and PDFs on the drive and in SharePoint, declarations of conformity in the DMS, BOMs and instructions in the PLM, test records in folders per line. demi reads, understands and links them, with your rights. The AI lays the new regulation next to every file in hours instead of weeks, and your experts decide how each gap is closed.
Where the data lives today
- DMS & archive
- PLM
- PDFs
- Office files
- SharePoint
- Folders & drives
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
Data sources in this case: DMS, PLM and file shares. demi replaces nothing and links, per machine type, the risk assessment, declaration of conformity, instructions, applied standards and test records with the BOM, the control system and the variants. demi writes back only after approval.
- 2 · PermitPermission Layer
The files are visible to engineering, product safety and the people authorised to compile the technical documentation. The responsible person releases the roadmap and every assessment of a gap, and each decision is recorded with name and date.
- 3 · ActIntelligence Layer
The agent checks every file against the checklist your experts derive from the regulation and backs each finding with the place in the document. Where evidence is missing, it reports a gap instead of assuming. How a requirement is interpreted is decided by your experts.
How it runs
- 1
Your experts store the requirements of the new regulation as a checklist; the agent suggests entries.
- 2
The agent reads every CE file: risk assessment, declaration of conformity, instructions, applied standards and test records.
- 3
Per machine type it shows which requirement is covered and which is missing, with the reference.
- 4
It bundles the gaps into tasks, estimates the effort and orders them by each machine type's next delivery date.
- 5
Product safety assesses, assigns the tasks and releases the roadmap.
What changes
A clear status per machine type, every gap documented
The most urgent gaps first, ordered by delivery date
New files built to the new regulation from the start
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+230 hfreed per year
Assumptions and calculation
demi lays the new regulation next to every CE file and shows each gap with evidence; you plan and release.
16 h → 11.2 h per case
How we calculate
4 machine types × 16 h × 30% × 1.0 (manual) × 12 months = 230 h
Value per year, before demi costs
Freed per year+230 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€14,950
gained per year
230 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
How does demi know the requirements of the new Machinery Regulation?
From the regulation's text and the checklist your experts derive from it and maintain. The agent suggests entries, for example on protection against corruption, logging or digital instructions; only approved entries are added. If the interpretation changes, it re-checks every file.
Does this also affect machines already in operation?
Machines placed on the market or put into service before 20 January 2027 stay under the old directive. If one of them is substantially modified later, the new regulation applies to the modification. The agent shows which upcoming rebuilds are affected; whether a rebuild is substantial is your call.
Does demi show whether a machine type needs a notified body?
Yes, as a proposal: the agent checks whether a type falls into the categories of Annex I of the regulation, for example because of a self-learning safety function, and which conformity procedure then applies. Your experts confirm the classification.
What changes for the instructions?
Instructions may be digital, but on request at the time of purchase they must still be provided on paper free of charge. The agent checks per type whether instructions, languages and delivery fit and shows the passages that need to change.
