Today
Every machine variant needs a complete technical file, a risk assessment and a correct declaration of conformity. The new machinery regulation raises the bar. Today someone gathers standards, test reports and manuals from PLM, DMS and file shares, one variant at a time.
An example
Ebert & Lorenz Maschinenbau builds the HP-250 press as a variant with an attached robot cell. The agent carries over 80 hazards from the base model, flags 6 new ones from the robot cell with a PL d target and reports one applied standard whose edition has changed. The head of engineering adds the safeguards and releases the file.
Your data, wherever it lives
Variants, BOMs and drawings live today in the PLM, CAD and ERP, risk assessments as spreadsheets and Word files in project folders, test reports, certificates and manuals as PDFs in the DMS, the Machinery Regulation and the lists of harmonised standards on the web. demi reads, understands and links them per variant, with your rights. In minutes the AI carries over what still applies from the base model and shows every change and every gap, and the authorised person completes and signs.
Where the data lives today
- PLM
- CAD & drawings
- ERP
- Office files
- Folders & drives
- DMS & archive
- PDFs
- Web & portals
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
The case needs data from the PLM, ERP and DMS. demi replaces nothing and links variants and BOMs with applied standards, risk assessments, test reports, certificates and manuals; every variant knows its base model and its changes. demi writes back only after approval.
- 2 · PermitPermission Layer
The file is released by whoever holds that authority for technical documentation at your company. Authorities and test bodies receive exactly the released set, and every version stays on record.
- 3 · ActIntelligence Layer
The agent builds the file per variant, carries over matching hazards from the base model, flags new ones and drafts the risk assessment and declaration from your templates. It checks every applied standard and piece of evidence exactly against the stored edition and validity and lists gaps with their source.
How it runs
- 1
Create or select the new variant
- 2
The agent takes over the base model's file and shows what has changed
- 3
It checks standard editions, test reports and certificates for currency
- 4
The risk assessment and declaration of conformity are drafted
- 5
The responsible person closes the gaps and releases the file
What changes
An up-to-date file for every variant
Outdated standards and evidence caught
New variants released sooner
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+173 hfreed per year
Assumptions and calculation
demi assembles documents, risk assessment and declaration of conformity per variant; you sign.
8 h → 5.6 h per case
How we calculate
6 CE files × 8 h × 30% × 1.0 (manual) × 12 months = 173 h
Value per year, before demi costs
Freed per year+173 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€11,245
gained per year
173 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Does it cover the new machinery regulation?
demi works with the requirements your experts store as a checklist, for the existing directive as well as the new regulation. The agent checks every file against that list and shows what is missing. How a requirement is interpreted is decided by your experts.
Can it reuse risk assessments from similar machines?
Yes. The agent starts from the approved assessment of the base model or a similar variant and carries over only hazards from assemblies that are unchanged. Anything new or modified is flagged for review.
Who signs the declaration of conformity?
Always a person: whoever is authorised to sign at your company. demi prepares the draft with every reference to standards and evidence, and records who approved which version and when.
How does demi know a standard is outdated?
For every applied standard demi stores the edition the file relies on. When you add a new edition or your standards subscription reports a change, the agent shows every file that still points to the old one.
