Today
Every plant for combustible dusts needs its ATEX documents: zones from the customer's URS, an ignition hazard assessment for every assembly, marking, operating manual and declaration of conformity. Most assemblies were already assessed in earlier plants, but the assessment sits as a document in a project folder from five years ago. So the file starts almost from scratch on every project, shortly before delivery, and an ignition source spotted in the predecessor can be missing from the next one.
An example
Dosmera builds a sack discharge station with a screw feeder for corn starch: zone 21 inside, zone 22 outside, maximum surface temperature 125 °C according to the URS. Of 38 assemblies the agent finds 33 with an assessment from earlier plants under equal or stricter conditions. It flags three deviations, among them a feeder running at 120 instead of 60 revolutions per minute, and two new assemblies without a predecessor. The design engineer assesses five assemblies anew instead of 38, and the file is ready for the factory acceptance test.
Your data, wherever it lives
Today the building blocks of an ATEX file sit in many project folders: ignition hazard assessments of earlier plants as documents, bills of materials and drives in PLM and ERP, zones and dust values in the customer's URS, templates on the shared drive. demi reads and understands all of it and links it per assembly, with your access rights. The AI then assembles the file for a new plant from checked predecessors in hours, instead of someone rewriting it shortly before delivery, and your expert signs.
Where the data lives today
- PLM
- ERP
- CAD & drawings
- Folders & drives
- Office files
- PDFs
- E-mails
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
Data sources in this case: PLM, ERP, drawings, project folders, your templates and the customer's URS. demi replaces nothing and links every plant to its assemblies, materials, drives and speeds, to the zones inside and outside, the dust values of the product and the ignition hazard assessments of earlier plants with the same assemblies. So every assembly sits next to the assessment that already exists for it.
- 2 · PermitPermission Layer
Design and technical writing edit the assessments; only the people your company has named for it may release and sign. The customer's URS and documents stay in their project room, and every step is recorded.
- 3 · ActIntelligence Layer
The agent reads zones and dust values from the URS, such as zone 21 inside, zone 22 outside, minimum ignition energy and maximum permitted surface temperature. For each assembly it checks whether an assessment exists for the same assembly under equal or stricter conditions and takes it over as a draft with its source. It flags every deviation, such as a higher speed or a different seal, and lists assemblies without a predecessor for a new assessment. Whether an ignition source is under control is decided by your expert.
How it runs
- 1
Take zones and dust values from the customer's URS
- 2
Hold the new plant's bill of materials against assessed assemblies of earlier plants
- 3
Take over assessments with their source, flag deviations and new assemblies
- 4
Derive marking, operating manual and declaration of conformity as drafts
- 5
The named expert reviews, completes and signs
What changes
ATEX files that are ready when the design is
What was found in the predecessor is in the new project too
Every assessment traceable with source and signature
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+173 hfreed per year
Assumptions and calculation
demi reuses checked assessments of identical assemblies as a draft; your expert reviews and signs.
8 h → 5.6 h per case
How we calculate
6 plants × 8 h × 30% × 1.0 (manual) × 12 months = 173 h
Value per year, before demi costs
Freed per year+173 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€11,245
gained per year
173 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Does demi set the zones?
No. The operator sets the zones in their explosion protection document, and they come with the URS. demi takes them over with their source and reports when a detail is missing or contradictory.
Which standard does the agent assess against?
Against the structure you store, for example EN ISO 80079-36 for non-electrical equipment. It takes over existing assessments and fills your template; new ignition sources are assessed by your expert.
What happens when an assembly has changed?
Then the agent does not quietly reuse the old assessment. It shows what is different, such as speed, material, seal or drive, and puts the assembly up for review.
Who signs in the end?
Your company, as today. demi drafts the assessment, marking, operating manual and declaration of conformity, every statement with its source. Reviewing and signing stay with the people you have named for it.