Today
Work instructions are written by hand for every variant. After a change they go out of date fast, because nobody knows which instructions are affected. At the station, people then build to an old revision.
An example
At Talwerk Antriebstechnik, engineering moves housing 600-120 to revision D. The agent finds three affected assembly instructions and takes the new tightening torque of 25 Nm for the cover screws from the drawing. Manufacturing engineering reviews the three drafts and releases them the same day.
Your data, wherever it lives
Today drawings and BOMs sit in CAD and PLM, routings in the ERP, the instructions as text files in the DMS or on the MES terminal, phone photos of assembly steps in folders, and changes arrive as change notices. demi reads, understands and links them per station and variant, with your rights. The AI drafts each instruction in minutes instead of hours and keeps it current after every change, and manufacturing engineering releases it.
Where the data lives today
- CAD & drawings
- PLM
- ERP
- Office files
- DMS & archive
- MES
- Photos, video & audio
- Folders & drives
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
The case needs data from the PLM, MES, DMS and ERP. demi replaces nothing and links drawings, BOMs, routings, photos and change notices to the work instructions per station. demi only writes back after approval.
- 2 · PermitPermission Layer
Manufacturing engineering releases instructions, and at the station operators see only the released version. Every release is recorded with revision and date.
- 3 · ActIntelligence Layer
The agent drafts step-by-step instructions per variant and experience level and copies torques, dimensions and part numbers verbatim from drawing and BOM, citing the drawing revision. After a change it finds every affected instruction.
How it runs
- 1
Bring together drawing, BOM and routing for the variant
- 2
Draft the instruction step by step with images
- 3
Have manufacturing engineering review and release it
- 4
On a change, find the affected instructions
- 5
Propose the update and have it released again
What changes
Current instructions at every station
New variants documented faster
Fewer assembly errors
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+324 hfreed per year
Assumptions and calculation
demi writes the instruction from drawing, routing and images and keeps it current; you approve.
3 h → 2.1 h per case
How we calculate
30 work instructions × 3 h × 30% × 1.0 (manual) × 12 months = 324 h
Value per year, before demi costs
Freed per year+324 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€21,060
gained per year
324 h ÷ 1,760 h per role = 0.2 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Can demi create instructions with images?
Yes. demi uses photos from the station, views from the drawing and existing images and assigns them to the steps. If a step has no image, the agent flags the gap instead of filling it.
How do instructions stay current after a change?
Every instruction knows the drawing revision and BOM items its values come from. When a change notice arrives, the agent checks which instructions use those items and proposes the update. It only takes effect once released.
Can operators read the instruction in their own language?
Yes. A released instruction can be output in other languages. Torques, dimensions and part numbers stay unchanged; only the text is translated.
Where are the instructions shown?
Where you use them today, for example on the station terminal. demi does not replace your leading system and only writes back after approval.
