Who?
Customers, contacts, teams
Customer #2208Beverage bottler, customer since 2009P-2208-01Plant engineer, personOE-EK-KSElectrical engineering Kassel
CRMrun by customer #2208
head office: Kassel, Germany · since 1949 · 1,400 people · 3 plantsElmeris UK Limited · Manchester
Getting started with AI · Electrical Engineering & Switchgear
Elmeris doesn’t exist. Everything else on this page will feel familiar.
demi turns your systems into one record, carries over your rights and lets AI agents prepare the routine work. First the data, then the rights, then the AI. A person always approves.
What five use cases free up
+1,191 h per yearEstimate, not a promise≈ $77,415 per year, a cautious estimatedemi’s change list, extract
| 47.3 | -T4 5.5 instead of 4.0 kW, not in the parts list |
|---|---|
| 47.2 | -Q12 setting 13 instead of 10 A |
| 47.6 | New wire -K12:14 to X3:22, terminal in use |
| 47.9 | New bridge X3:23 to X3:24 |
| 52.2 | Cable -W52 renumbered |
| 61.5 | Wire moved from -A3:5 to -A3:7 |
| 88.3 | -Q31 setting 2.5 instead of 2.2 A |
Revisions
| A | 05/2026 | Released for production |
|---|---|---|
| B | 09/2026 | Two more drives, customer change |
| C | 11/2026 | As built, after commissioning |
The payoff
| Start | Use case | Volume per month | Share | Today per year | Freed up | Value per year |
|---|---|---|---|---|---|---|
| 1 | Red-pen markups back into the schematicEngineering, electrical engineering | 12 × 8 h | 30% | 1,152 h | 207 h | $13,455 |
| 2 | Design and routine verification to IEC 61439Quality & test bay | 30 × 2 h | 30% | 720 h | 130 h | $8,450 |
| 3 | Build quotes from similar past ordersSales & proposal engineering | 80 × 3 h | 30% | 2,880 h | 518 h | $33,670 |
| 4 | Spot missing parts before you release an orderProduction, production planning | 400 × 10 min | 40% | 800 h | 192 h | $12,480 |
| 5 | Find your installed base by serial numberService | 300 × 10 min | 40% | 600 h | 144 h | $9,360 |
| Total | 6,152 h | 1,191 h | $77,415 |
Of 6,152 hours, we count 1,191: volume times time times twelve months, then only the cautious share of that, times 0.6 for partly digital processes. That is about 0.7 full-time roles. Calculated at $65 per hour: $48.62 labor cost in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead. A number doesn’t fit your company? You can change every one of them in the configurator.
The problem
Commissioning of filling line 3 at customer #2208 finished on Thursday. On Friday at 16:40 the return reached the mailbox: 23 pages marked in red out of 186 sheets, 17 as scans and 6 as phone photos. On them: rewired conductors, new bridges, changed settings and a swapped inverter.
The customer gets the as-built documentation, and only with it does the final invoice go out. The electrical engineer who drew the cabinet has long moved on to the next order. For every change she needs three sources:
In the mailbox23 pages, no sheet number in the file name. The photos are called IMG_4471.jpg.
In E-CADProject =A1187 as it stood before commissioning, revision B.
In the ERPParts list SL-1187 with the old inverter, shipped long ago.
It takes three weeks until all the changes are in E-CAD. That is how long the final invoice waits, and service works from the old drawing.
=A1187=A0994=A1152=A1139+ 9 more: photos, queries, test reports
Together 6,152 hours a year, about 3.5 full-time roles. Most of it falls on electrical engineering and proposal engineering: the same people who should be drawing the next cabinet and pricing the next quote.
At every commissioning, wires are moved, bridged and swapped. It takes weeks until the changes are in E-CAD. Until then the drawing does not match the cabinet, and the final invoice waits.
A circuit breaker has a 26-week lead time, purchasing proposes another make. Whether the main switchboard still sits within its design verification is checked by hand today, if someone remembers.
Which earlier MCC comes closest to a new inquiry, and where the wiring hours ran away, is known by two proposal engineers. The big quotes wait for them.
What demi does · Example run
demi reads the 17 scans and 6 photos and matches every page to its sheet. For the photos without a sheet number, what is in the picture helps: columns, devices and terminals.
41 markups, each with sheet, column, device, old and new state: 17 rewired conductors, 9 new bridges, 6 settings on motor protection breakers, 8 new cable numbers and one swapped inverter.
The new wire from -K12:14 is meant for X3:22, and that terminal is already in use: by guard door switch -S3 on sheet 52. Inverter -T4 at 5.5 kW is not in the parts list.
The larger inverter adds 61 W of power loss to the cabinet: 1,087 instead of 1,026 W. The limit is 1,150 W at 35 °C. The temperature rise stays within the design verification.
The electrical engineer accepts 39 changes in one morning and enters them in E-CAD. She clears two with commissioning: the new wire goes to X3:25, and the rating plate photo shows -T4 is the 5.5 kW type.
The head of electrical engineering approves revision C, with parts list index C. The as-built documentation goes to the customer, the final invoice the same day.
Not every return is this thick. On average a commissioning at Elmeris brings 15 to 20 changes, and the table above counts that average, not the three weeks SWS-1200 would have waited.
One feeder is swapped, the plant keeps running. Since 1949.
Elmeris builds control cabinets, main low-voltage switchboards, motor control centers and distribution boards for machine builders, the process industry and buildings. In withdrawable motor control centers for the process industry, Elmeris is the world market leader.
An electrician sets up a workshop for switch panels in Kassel. The town’s factories are starting up again and need power at every machine.
The first motor control center with withdrawable units, for a chemical plant. One feeder can be swapped while the others keep running.
The second generation takes over. The withdrawable units become a series with fixed sizes, tested like a device.
The Brno plant for withdrawable units and sheet metal. Since 2004 the Wrocław plant has wired control cabinets.
Sales in Dubai and Saudi Arabia: MCCs for desalination plants and refineries. Then Pittsburgh, with service and cabinets to UL 508A.
The third generation leads, together with a managing director from outside the family. Now demi arrives, first in electrical engineering in Kassel.
Office Floor <=> Shop Floor
demi can work at all 14 stations. Pick a use case and see which ones it touches.
The start
| The first 90 days | Day 1 | Week 1 | Weeks 2 to 4 | Months 2 and 3 |
|---|---|---|---|---|
| Systems | ||||
| Mailboxes, E-CAD | Commissioning mailbox and the E-CAD projects with parts lists, read-only, through a small connector in your own network | |||
| ERP, file storage | Read-only | |||
| Test bay database, production control | Read-only | |||
| CRM, service tool | Read-only | |||
| Use cases | ||||
| 1 Red pen | With approval. Part of daily work from day 30 | |||
| 2 Design verification | With approval. Readings from week 2 | |||
| 3 Quotes | With approval | |||
| 4 Missing parts | With approval | |||
| 5 Plants by serial number | With approval | |||
| Writing back | ||||
| Into the ERP | Parts list with a new index, after approval | |||
Every return that sits waiting holds up a final invoice, and until then service works from a drawing that does not match the cabinet. The use case only needs reading: the commissioning mailbox and the E-CAD projects are in the record from day 1, orders and design verifications from the ERP and file storage from week 1. That is why demi also checks every swap against the verification from week 1, and the test bay readings join from week 2.
1Data
An extract from Elmeris’s record.
Nothing gets replaced. Running a different ERP? demi connects to everything, from SAP and Oracle to the specialist software from the next town. At first, demi only reads. A person connects a system after seeing who will read what.
| SN 26-04471 | ERP, rating plate, built in week 41/2026 |
|---|---|
| Type SWS-1200 | ERP, E-CAD |
| Schematic =A1187 | E-CAD: built to rev. B, rev. C today |
| Parts list SL-1187 | ERP: index B, index C after approval |
| Terminal X3:22 | E-CAD, terminal plan: used by -S3 |
| Inverter -T4 | Red pen on sheet 47, rating plate photo, mailboxes |
| Design verification BN-SWS-12 | File storage: system verification and temperature-rise calculation |
| Routine verification SP-26-04471 | Test bay database, 09.10.2026 |
| Customer #2208, specification LH-2208 | CRM, specification from an email |
| Commissioning IB-26-0311 | Service tool, 09 to 12.11.2026 |
Customer #2208 runs control cabinet SN 26-04471, an SWS-1200 with schematic rev. C, on its filling line 3.
Who?
Customer #2208 Beverage bottler, customer since 2009P-2208-01 Plant engineer, personOE-EK-KS Electrical engineering KasselCRMrun by customer #2208
What kind?
SWS-1200 Control cabinet, IP54=A1187 Schematic, 186 sheetsSL-1187 Parts list, index B as built-T4 Frequency inverter, 5.5 kW todayE-CAD, ERPis an SWS-1200, rev. B
Made from?
FA-26-08812 Production order, wiring KasselSP-26-04471 Routine verification, 48 test itemsP2 Test station in the test bayProduction control, test baybuilt in week 41/2026
What’s open?
IB-26-0311 Commissioning, 09 to 12.11.T-26-0418 Query: spare inverter in stock?Service toolcall-out on this cabinet
Which one exactly?
SN 26-04471
ERPcabinet by serial number
What applies?
#26-0233 Quote, line 3A-26-1187 OrderLH-2208 Specification: 20% spare, IP54CRM, ERPcontract for this cabinet
What’s written?
Mail #5521 Return with 23 pagesSP-26-04471 Routine verification reportBN-SWS-12 Design verification, temperature riseMailboxes, file storage, test bayis about this cabinet
What should be?
IEC 61439-2 Design and routine verificationIEC 81346 Reference designationsLH-2208 20% spare per terminal stripFile storage, CRMapplies to this cabinet
What do we think?
F-26-207 X3:22 used twice, -T4 missing from the parts listdemifinding on this cabinet
At the pump maker the center is the pump with its serial number, at the sensor maker the device. At Elmeris it is the cabinet, wired as it really is after commissioning. The grid stays, the center changes.
-T4 on the phone photo, the item in the parts list and the article in the ERP are the same device.
mm², AWG and kcmil from drawings for North America become one cross-section.
Every value shows its source, place and version. Unclear markups are kept too.
The schematic SN 26-04471 was built to: rev. B, not rev. C after commissioning.
After approval, the parts list with its new index lands in the ERP.
2Rights
What only purchasing sees in the ERP, only purchasing sees in demi. Only electrical engineering changes schematics; only standards & verification and the test bay change verifications and test reports.
Each area works with what the one before delivers: electrical engineering with the order from sales, purchasing with the parts list, wiring with the released schematic, the test bay with the finished cabinet, commissioning with the tested SWS-1200.
96 + 168 + 236 + 120 + 610 + 80 + 90 = 1,400 people
| Who | Schematics & parts lists | Verifications & test reports | Costing & prices | Suppliers & purchase prices | Plants at the customer | HR | Approves |
|---|---|---|---|---|---|---|---|
| Proposal engineering | reads | reads | edits | – | reads | – | Quote, price |
| Electrical engineering | edits | reads | – | – | reads | – | Schematic and parts list, change by change |
| Standards & verification | reads | edits | – | – | – | – | Design verification |
| Test bay | reads | edits | – | – | – | – | Routine verification, by the test engineer |
| Purchasing & scheduling | reads | – | – | edits | – | – | Purchase order, another make only with verification |
| Commissioning | reads | reads | – | – | edits | – | Red pen, commissioning report |
| Service & spare parts | reads | reads | spare parts | – | edits | – | Call-out, spare parts quote |
| HR | – | – | – | – | – | edits | – |
| Customer #2208 in the portal | own | own | – | – | own | – | – |
| Red-pen agent, AI coworker | reads | reads | – | – | reads | – | Never |
| Quote agent, on behalf | As much as the person who starts it. Never more. | Never | |||||
Every room has keys. They come from your systems and never multiply on their own.
Only sales sees prices, only purchasing sees purchase prices. Purchasing orders another make only once standards & verification has checked it against the design verification.
An agent carries the keys of the person it works for. An AI coworker has its own, and always a person who is accountable for it. Every access is in the log.
3Intelligence
AI coworker, accountable: head of electrical engineering
AI coworker, accountable: standards & verification
Works for the person who starts it
AI coworker, accountable: head of production planning
Works for the person who starts it
A fixed, versioned method calculates the power loss from data sheets, enclosure and ambient temperature, not the language model. Standards & verification decides which method applies.
Calculations run on Elmeris’s own rules and data. Anything that goes out or is written back to a system is approved by a person.
The roadmap
Rated current and section layout are in the drawing. demi prepares the cutting and bending list for every copper busbar from them, and sheet metal & copper approves instead of redrawing.
Every wire with cross-section, color, length, destination and ferrule, per cabinet from E-CAD. What the red pen changes is already in the list for the next cabinet of the same series.
Every complaint hangs on the cabinet and its as-built parts list. So quality management sees which other orders carry the same component before the next customer calls.
Sources
Through 2026, Gartner expects organizations to abandon 60% of AI projects that lack AI-ready data.
Gartner · 2025 · on step 1, dataOpen the source (opens in a new tab)Share sensitive data in LLM apps on a least-privilege basis only, meaning just what a user or process needs.
OWASP GenAI Security Project · 2025 · on step 2, rightsOpen the source (opens in a new tab)70% of AI’s potential value sits in core functions such as sales, manufacturing and supply chain.
Boston Consulting Group · 2025 · on step 3, intelligenceOpen the source (opens in a new tab)In 20 minutes we show you demi on a case like yours: bring the data together, set the rights, let AI do the work.
Elmeris does not exist: a made-up example company in Electrical Engineering & Switchgear, not a real firm. An estimate from our assumptions, not a promise. You can change every number in the configurator.