Who?
Customers, contacts, teams
Customer #4126Packaging machine builder, customer since 2012P-4126-02Electrical design engineer, personOE-EW-HBHardware & components
CRMbought by customer #4126
Measurement and motion, right at the machine
Wallner+Hardt Sensortechnik GmbH & Co. KG·,
Getting started with AI · Electronics & Sensors
Wallner+Hardt doesn’t exist. Everything else on this page will feel familiar.
demi turns your systems into one record, carries over your rights and lets AI agents prepare the routine work. First the data, then the rights, then the AI. A person always approves.
What five use cases free up at the home plant
+627 h per yearEstimate, not a promise≈ $40,755 per year, calculated cautiouslyParts list, excerpt
| U1 | Microcontroller, 32-bit, QFN-32, MSL 3 |
|---|---|
| U2 | IO-Link transceiver |
| U3 | Bridge signal conditioning |
| U4 | Voltage regulator 3.3 V |
| D1 | TVS diode 33 V |
| C7 | MLCC 0603 X7R, second source |
| J2 | M12: 1 L+, 2 OUT2, 3 L−, 4 C/Q |
Revisions
| D | 02/2022 | U1 variant of the same series due to allocation |
|---|---|---|
| E | 07/2023 | C7 second source approved |
| F | 11/2025 | U4 successor after discontinuation, same footprint |
The payoff
| Start | Use case | Volume per month | Share | Today per year | Freed up | Value per year |
|---|---|---|---|---|---|---|
| 1 | Spot component end-of-life notices earlyEngineering | 30 × 90 min | 40% | 540 h | 130 h | $8,450 |
| 2 | Find alternative parts during shortagesEngineering | 60 × 60 min | 30% | 720 h | 130 h | $8,450 |
| 3 | Find RoHS and REACH substances in your BOMsQuality | 40 × 60 min | 40% | 480 h | 115 h | $7,475 |
| 4 | Answer technical customer questions with sourcesSales | 200 × 15 min | 30% | 600 h | 108 h | $7,020 |
| 5 | Classify products to ECLASS and ETIM | 300 × 10 min | 40% | 600 h | 144 h | $9,360 |
| Total | 2,940 h | 627 h | $40,755 |
Calculated for the home plant in Kaiserslautern, not for the whole group. Of 2,940 hours, we count 627: volume times time times twelve months, then only the cautious share of that, times 0.6 for partly digital processes. That is about 0.4 full-time roles. Calculated at $65 per hour: $48.62 labor cost in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead. A number doesn’t fit your company? You can change every one of them in the configurator.
The problem
Since Friday, 17 change and discontinuation notices have landed in the component inbox. One of them matters: the manufacturer is discontinuing the microcontroller that sits as U1 on board LP 4410. Last order date: May 31, 2027.
U1 sits in the WS-410, the WS-420 and on the IO-Link card of the ST-220, around 40,000 pieces a year in total. The redesign with a new controller and ported firmware takes 15 months. By Friday, management wants to know how many to buy one last time. That can only be worked out with two systems and inside sales:
In the ERPDemand from orders and forecast, 5,500 pieces in stock, 6,000 on order.
In the PLMEverywhere U1 is used: on two boards and in every BOM revision.
In someone’s headInside sales knows which customer variant will keep running for years.
The two component engineers and purchasing crunch the numbers until Friday. The quantity is still an estimate, and it leaves out the IO-Link card.
U1C1 to C6U4U2D1+ 10 more: packages, data sheets, sites
Together that is 2,940 hours a year, about 1.7 full-time roles. At the home plant, most of it falls on five people: two component engineers, one person for product security and two from product compliance.
60 to 120 notices a month, most of them harmless. Which ones hit a board only becomes clear when they are checked against BOMs, stock and demand, and today a person does that by hand.
“Can the WS-410 take pressure peaks of 25 bar? Will it run on 30 V?” The answer is in a data sheet, a test report or an old email. The hard ones among the 200 questions a month wait for the two people who have known the WS-410 longest.
Since September 11, 2026, you have to report actively exploited vulnerabilities. If one turns up in an open-source library in firmware 4.1 and 4.2 of the ST-220 controller: which devices at which customers carry it? Today, nobody can tell at the push of a button.
What demi does · An example
demi reads all 17 and matches them to the components. 15 change the tape, package, site, marking, data sheet or lead time. For the optocoupler, the manufacturer names a successor. Only one discontinuation hits without a replacement: U1.
On two boards and in every BOM revision: LP 4410 in the WS-410 and WS-420, built with BOM revisions E and F, and LP 6120 on the IO-Link card of the ST-220.
Orders, framework agreements, forecast and repairs: around 40,000 pieces a year, 4,100 of them for the ST-220.
5,500 in stock, 6,000 on order. For assembly and testing, production allows for 3% scrap.
15 months of demand come to 50,000, or 51,500 with 3% scrap. Minus the 11,500 in stock and on order, that leaves 40,000. On top of that, two candidates for the new controller, each with a data sheet comparison.
The hardware & components team and purchasing check every number at its source. Management approves 40,000 pieces, two days before the deadline.
Unlike U1, the optocoupler discontinued on Saturday has a successor right away, in the same package. That is the usual case in the component inbox, and the table above reflects only that case, not the days U1 costs.
Measurement and motion, right at the machine. Since 1958.
Wallner+Hardt builds pressure sensors, rotary encoders, frequency inverters and controllers for mobile hydraulics, machine and plant builders and building services. In IO-Link pressure sensors for the hydraulics of excavators, cranes and tractors, no maker is bigger. The use cases and figures on this page are for the home plant in Kaiserslautern.
Electrical engineer Heinrich Wallner and businessman Otto Hardt set up a workshop in Kaiserslautern. Wallner builds positioning motors and needle position sensors for industrial sewing machines; Hardt sells them and keeps the books.
The first 58 mm incremental encoder, for machine tools. It grows into the DG series.
The sewing machine drive turns into the first frequency inverter.
An in-house thin-film measuring cell on stainless steel. The WS pressure sensors move into the hydraulics of excavators, cranes and tractors and today bring in more than half of revenue.
Plants in Plzeň, Suzhou and Katowice. Sales and application in Strasbourg, Turin, Detroit and Hong Kong.
IO-Link goes into every new sensor. Wallner+Hardt becomes the world market leader in IO-Link pressure sensors for mobile hydraulics. In-house controllers with an IO-Link master follow.
The component crisis: 14 boards redesigned in 20 months, only because parts were missing.
The Wallner and Hardt families hold all the shares. In the third generation, Katharina Wallner (engineering) and Jonas Hardt (sales and finance) run the company. Now come the CRA and demi, starting at the home plant.
Office Floor <=> Shop Floor
demi can work at all 14 stations. Pick a use case and see which ones it touches.
The start
| The first 90 days | Day 1 | Week 1 | Weeks 2 to 4 | Months 2 and 3 |
|---|---|---|---|---|
| Systems | ||||
| Mailboxes, ERP | Component inbox, BOMs, stock and demand, read-only, via a small connector in their own network | |||
| PLM, ECAD library, firmware repository | Read-only | |||
| MES with test stations, file share | Read-only | |||
| CRM with tickets, CAQ | Read-only | |||
| Use cases | ||||
| 1 Discontinuations | With approval. Part of daily work from day 30 | |||
| 2 Alternative parts | With approval | |||
| 3 RoHS and REACH | With approval | |||
| 4 Technical questions | With approval | |||
| 5 Classify products to ECLASS and ETIM | With approval | |||
| Writing back | ||||
| Into the ERP | Purchase proposal after approval | |||
A missed last order stops the WS-410, the WS-420 and the IO-Link card of the ST-220 until the redesign is done 15 months later. The use case only needs read access: the component inbox, BOMs, stock and demand are in the record from day 1, every BOM revision from PLM and the ECAD library from week 1. The CRA cannot wait: its reporting obligation has applied since September 11, 2026. So demi reads the firmware repository in week 1 too and, from week 2, the MES, to see which serial number carries which firmware.
1Data
An excerpt from the record of the Kaiserslautern home plant.
Nothing gets replaced. Running a different ERP? demi connects to everything, from SAP and Oracle to the specialist software from the next town. At first, demi only reads. A person connects a system after seeing who will read what.
| SN 2437-1146 | MES, laser marking, week 37/2024 |
|---|---|
| Type WS-410-0010-R-G14-M12-2 | PLM, ERP |
| BOM SL 1084 4410 | PLM: built with revision E, revision F today |
| Assembly drawing BP 4410-01 | PLM, sheet 1 of 2 |
| PCB LP 4410 | PLM: rev. C in the device and today |
| U1, microcontroller | ECAD library, PDN dated Nov 16, 2026 from the mailboxes |
| Firmware 3.2.1 | Firmware repository, build 3.2.1+a41c9e |
| Test report PZ-24-042113 | MES, test station P3, Sep 10, 2024 |
| Customer #4126, K-4126-03 | CRM, parameter set from an email |
| U1 material declaration | File share, as of 01/2026 |
Customer #4126 builds pressure sensor SN 2437-1146, a WS-410 with firmware 3.2.1, into one of its packaging machines.
Who?
Customer #4126 Packaging machine builder, customer since 2012P-4126-02 Electrical design engineer, personOE-EW-HB Hardware & componentsCRMbought by customer #4126
What kind?
WS-410 Pressure sensor with IO-Link, 0 to 10 barSL 1084 4410-E As-built BOMLP 4410 Sensor board, rev. CU1 Microcontroller, on two boardsPLM, ECAD libraryis a WS-410, revision E
What’s it made of?
FA-24-03817 Production order, 480 piecesR-24-071532 Reel of U1, date code 2431P3 Test station for WS-4MES, ERPmade in week 37/2024
What’s going on?
T-26-0954 Question: how precisely does it switch at 6.0 bar?RMA-26-0311 Return of a WS-410CRM with ticketsquestion about this device
Which one exactly?
SN 2437-1146
MESdevice by serial number
What applies?
#26-0412 Quote for 2027RV-4126 Framework agreement, 3,000 pieces a yearK-4126-03 Parameter set: switch point 6.0 barCRM, ERPparameters in this device
What’s in writing?
Mail #3318 Parameter set from the customerPDN U1 Discontinuation notice dated Nov 16, 2026PZ-24-042113 Test and calibration reportEU-KE WS-4 Declaration of conformity, rev. 7Mailboxes, file share, MESabout this device
What should it be?
DB WS-4 Data sheet: ≤ ±0.25% FSCRA SBOM per firmware releaseRoHS Limits per homogeneous materialFile shareapplies to this type
What do we make of it?
F-26-112 U1 discontinued, last-time buy of 40,000 proposeddemifinding on this device
At the pump maker, the pump with its serial number sits in the middle; at the machine builder, the line at the customer’s site; at the space supplier, the flight unit in orbit. At Wallner+Hardt, it is the device, as far as the company knows it: up to the customer who buys it. The grid stays, the middle changes.
U1, the type in the PDN and the part number in the ERP are the same component.
bar, kPa and psi from customer questions become one value in bar.
Every value shows its source, exact location and version. Unclear rows are kept too.
The BOM that SN 2437-1146 was built with: revision E, not today’s revision F.
After approval, the last-time buy lands in the ERP as a purchase proposal.
2Rights
What only purchasing sees in the ERP, only purchasing sees in demi. Only engineering changes schematics and firmware, only service changes returns and devices.
Each department works with what the one before it delivers: engineering with the request from sales, purchasing with the BOM, the SMT line with U1, quality with the populated board, service with the released WS-410.
22 + 42 + 64 + 28 + 104 + 14 + 16 = 290 people
| Who | Devices & serial numbers | Schematics & firmware | Components & discontinuations | Prices & terms | Customer parameter sets | HR | Approves |
|---|---|---|---|---|---|---|---|
| Application & support | reads | – | – | – | edits | – | Answer to the customer |
| Inside & field sales | own customers | – | – | edits | reads | – | Quote, price |
| Hardware & components | reads | edits | edits | – | – | – | Alternative part, successor |
| Firmware & product security | reads | edits | reads | – | reads | – | SBOM, CRA report |
| Purchasing & materials planning | – | – | edits | purchase prices | – | – | Purchase order, last-time buy up to the limit |
| Product compliance | – | – | reads | – | – | – | Material declaration to customers |
| Repair & RMA | edits | reads | reads | – | reads | – | Repair, replacement under warranty |
| HR | – | – | – | – | – | edits | – |
| Customer #4126 in the portal | own | – | – | own | own | – | – |
| Discontinuation agent, AI coworker | reads | reads | reads | – | – | – | Never |
| Questions agent, on someone’s behalf | As much as the person who starts it. No more. | Never | |||||
Every room has keys. They come from your systems and never multiply on their own.
Only sales sees prices, only purchasing sees purchase prices. A last-time buy above the limit is approved by management.
An agent carries the keys of the person it works for. An AI coworker has its own, and always a person who is accountable for it. Every access is in the log.
3Intelligence
AI coworker, accountable: head of hardware & components
Works for the person who starts it
AI coworker, accountable: product compliance
Works for the person who starts it
demi calculates the last-time-buy quantity from demand, stock and open orders in the ERP, with 3% scrap for assembly and testing.
Calculations run on Wallner+Hardt’s own rules and data, not in the language model. Anything that goes out or is written back to a system is approved by a person.
The roadmap
Today the record knows the reel for each production order. With the SMT line, every reel is added with its date code, lot and moisture sensitivity level, along with its time outside the dry cabinet. Then, for a quality alert from the manufacturer or a bad lot, the affected serial numbers turn up in minutes.
The adjustment values of every serial number, the measuring cell’s offset and temperature drift, show when a measuring-cell lot drifts, before the device leaves the building.
The 40,000 pieces of U1 are reserved per product. demi compares consumption with the redesign and flags it when stock will run out before the board with the new controller goes into series production.
Sources
Through 2026, Gartner expects organizations to abandon 60% of AI projects that lack AI-ready data.
Gartner · 2025 · on step 1, dataOpen the source (opens in a new tab)Share sensitive data in LLM apps on a least-privilege basis only, meaning just what a user or process needs.
OWASP GenAI Security Project · 2025 · on step 2, rightsOpen the source (opens in a new tab)70% of AI’s potential value sits in core functions such as sales, manufacturing and supply chain.
Boston Consulting Group · 2025 · on step 3, intelligenceOpen the source (opens in a new tab)In 20 minutes we show you demi on a case like yours: bring the data together, set the rights, let AI do the work.
Wallner+Hardt Sensortechnik GmbH & Co. KG is made up: a typical company in Electronics & Sensors, not a real one. An estimate from our assumptions, not a promise. You can change every number in the configurator.