Who?
Customers, specifiers, suppliers
Customer #1744Hotel company, organisationK-1744-2Interior designer, personL-208Mirror supplierL-114Panel mill
CRM, ERPbuild and supply for this project
Tannried Möbelwerk GmbH (Germany)·,
Getting started with AI · Wood & Furniture
Tannried builds tables, cabinets, wall panels and chairs for offices, hotels and schools. Many variants, special requests in contract business and proof of origin for the wood.
Tannried doesn’t exist. Everything else on this page will feel familiar.
demi turns your systems into one record, carries over your rights and lets AI agents prepare the routine work. First the data, then the rights, then the AI. A person always approves.
What five use cases free up
+711 h per yearCutting plan
SP 26-11-118
| Part | Description | Size in mm | Edge | Per board |
|---|---|---|---|---|
| 26-0412-03-017 | Left side panel | 2,200 × 576 | K1 front, K2 top/bottom | 2 |
| 26-0412-03-018 | Right side panel | 2,200 × 576 | K1 front, K2 top/bottom | 1 |
| 26-0412-03-024 | Shelf | 570 × 540 | K1 front | 3 |
| 26-0412-03-031 | Filler panel | 1,162 × 300 | K1 front | 2 |
| R-0331 | Offcut, to the offcut store | 447 × 300 | none | 1 |
Yield 93.6%Offcut 2.3%Waste 4.1%Batch WE 26-1187, FSC Mix 70%Grain lengthwise
Whole buildings, furnished. Since 1952.
Contract furniture and interior fit-out from a single source: from desks for an insurance company to a 118-room hotel, designed, built and installed by Tannried’s own people.
A joiner’s workshop in a hamlet in the Alpine foothills. It repairs farmhouse furniture and fits out guest rooms for the inns on Lake Tegernsee and Lake Schliersee.
The first hotel series: wardrobes, beds and benches for the hotels that tourism in the Alpine foothills needs.
A move to the Miesbach industrial estate and the first panel saw. School furniture for the new schools in the district.
Office furniture for Munich’s office buildings and the first CNC machining centre.
Interior fit-out: wall panels and flame-retardant cladding for hotels and hospitals.
A new hall with nesting CNC and an edgebander for zero-joint edges. The plant is heated with its own wood chips.
Interior fit-out and installationFrom these four lines, Tannried furnishes whole buildings and installs everything with its own people, floor by floor.
The problem
Panel saw release list for week 10
| Job | Project and contents | Qty | ERP | Reality |
|---|---|---|---|---|
| 26-0398 | Office building, desk TI-1600 | 60 | available | in stock |
| 26-0401 | Secondary school, pupil desk size 6 | 210 | available | in stock |
| 26-0403 | Dealer, mobile pedestal RC-3 | 48 | available | in stock |
| 26-0405 | Lakeside hotel, bedside table NT-450 | 64 | available | in stock |
| 26-0407 | Insurer, filing cabinet OH 5 | 36 | available | in stock |
| 26-0409 | Hospital, wall panel PL-19 B-s1,d0 | 140 | available | in stock |
| 26-0411 | OB 26-031, desk TI-1400 | 118 | available | in stock |
| 26-0412 | OB 26-031, wardrobe KS-1200 with mirror door | 118 | available | mirror door not until week 11, edge K1 from Mon |
| 26-0414 | OB 26-031, headboard PL-KT18 | 118 | available | in stock |
| 26-0418 | Care home, resident wardrobe SR-900 with mirror door | 40 | available | mirror door not until week 11 |
| 26-0421 | Town hall, coat cupboard SR-600 with mirror door | 12 | available | mirror door not until week 11 |
| 26-0424 | University, conference table TI 1,800 × 900 | 30 | available | edge K1 missing |
| 26-0426 | Dealer, sideboard SB-1800 | 20 | available | in stock |
| 26-0430 | Vocational school, teacher’s desk TI-1400 | 14 | available | in stock |
The “Reality” column isn’t in any system. The ERP counts anything on order as available.
Every Thursday, production planning releases next week’s jobs to the saw. Among them are 118 wardrobes for a new 118-room hotel, project OB 26-031, customer #1744. The hotel opens on 1 July.
The ERP says “available” 14 times. What’s really missing sits in three other places:
In purchasing’s inboxTuesday’s email from the mirror supplier: mirror doors not until week 11. It affects three jobs.
In the edgebanding storeK1, ABS 2 mm light oak: 80 metres on the roll, 26-0424 needs 360.
In the planners’ headsWhich job from week 11 can be brought forward so the saw doesn’t stand idle.
If they cut anyway, 170 half-finished carcasses sit in the buffer until the mirror doors arrive. And the hotel opens on 1 July.
Together that is 3,200 hours a year, about 1.8 full-time roles. Nearly half of it goes into special variants in engineering and planning.
Hotel, office, hospital: sizes, finishes, fire safety, emission class, test reports. Every line item is checked by hand against the product range.
FSC, PEFC and, from 30 December, the EU Deforestation Regulation: the evidence on wood species and origin sits with suppliers, in emails and in folders.
Fronts, edges, fittings, sizes: production planning knows which combinations can be built and which parts belong together. Sales doesn’t.
What demi does · An example
Before the early shift, demi checks all 14 jobs: the BOM against the panel store, edgebanding store, fittings, bought-in parts and CNC programs.
In purchasing’s inbox, demi finds Tuesday’s email from the mirror supplier. Three jobs turn red, each with the email as its source.
K1 light oak: 80 metres in stock, 360 needed, more arriving on Monday. 26-0424 turns amber: cutting yes, edging from Monday.
For the free hours at the saw, demi suggests two jobs from week 11 whose material is all in house.
Planning reads the list, opens two sources and releases 13 jobs. It moves the three red ones to week 11.
demi drafts the message to the OB 26-031 project manager: carcasses in week 11, installation of the first floor from week 14 as agreed. Planning sends it off.
Release check 26-0412OB 26-031 · Thu 26 Feb 2026
Planning, seen 6:15moved to week 11
Most jobs are complete, and planning only needs a quick look. So in the calculation below, only 2.4 of the ten minutes per production order are freed up.
The payoff
| Start | Use case | Volume per month | Share | Today per year | Freed up | Value per year |
|---|---|---|---|---|---|---|
| 1 | Match tenders to your productsEstimating and tenders | 10 × 4 h | 50% | 480 h | 144 h | €9,360 |
| 2 | Spot missing parts before you release an orderProduction planning | 400 × 10 min | 40% | 800 h | 192 h | €12,480 |
| 3 | Trace batches and serial numbersService and quality | 10 × 2 h | 40% | 240 h | 58 h | €3,770 |
| 4 | Variant BOM from the customer's requirementsEngineering and planning | 40 × 3 h | 30% | 1,440 h | 259 h | €16,835 |
| 5 | Declarations of performance from test resultsQuality | 10 × 2 h | 40% | 240 h | 58 h | €3,770 |
| Total | 3,200 h | 711 h | €46,215 |
Of 3,200 hours, we count 711: volume times time times twelve months, then only the cautious share of that, times 0.6 for partly digital processes. That is about 0.4 full-time roles. Calculated at €65 per hour: €49.50 labour cost in manufacturing according to Destatis, plus workplace, IT and overheads. A number doesn’t fit your company? You can change every one of them in the configurator.
Office Floor <=> Shop Floor
demi can work at all 14 stations. Pick a use case and see which ones it touches.
The start
From then on, the EU Deforestation Regulation applies to Tannried. When Tannried buys wood or boards from an importer, it needs the reference number of the importer’s due diligence statement. For its own imports, Tannried submits the statement itself. For every delivery, Tannried keeps a record of the supplier for five years. That is why use case 1 runs from day 1.
| The first 90 days | Day 1 | Week 1 | Weeks 2 to 4 | Months 2 and 3 |
|---|---|---|---|---|
| Systems | ||||
| Mailboxes, file sharePurchasing, goods in, certificates and test reports, read-only | Purchasing, goods in, certificates and test reports, read-only | |||
| ERP, panel storeRead-only, via a small connector in their own network | Read-only, via a small connector in their own network | |||
| CAD/CAM, CRM, cutting optimisationRead-only | Read-only | |||
| Shop-floor data and production controlRead-only | Read-only | |||
| Use cases | ||||
| 1 TenderWith approval | With approval | |||
| 2 Missing partsWith approval | With approval | |||
| 3 TraceabilityWith approval | With approval | |||
| 4 Variant BOMWith approval | With approval | |||
| 5 Declarations of performance from test resultsWith approval | With approval | |||
| Writing back | ||||
| Batch holds into the panel store, releases into the ERPAfter approval | After approval | |||
It starts with two sources, the mailboxes and the file share, and from week 1 it adds the batch data from the ERP and the panel store. And it has a fixed deadline. Every delivery demi checks before then is cleanly tied to its batch on 30 December. The tender depends on the product range in the ERP, missing parts on the stock in the ERP and the panel store. demi knows both from week 2, and from then on these two use cases run as well. The variant BOM saves the most time, 259 hours a year, and still only comes in month 2: for that, demi needs the design rules from CAD/CAM.
Data
An excerpt from Tannried’s record.
Nothing gets replaced. Running a different ERP? demi connects to everything, from SAP and Oracle to the specialist software from the next town. At first, demi only reads. A person connects a system after seeing who will read what.
| Item | Description | Compliance | Per room | Total | Source |
|---|---|---|---|---|---|
| 03.01 | Wardrobe KS-1200 with luggage rack and mirror door | E05 | 1 | 118 | ERP, job 26-0412 |
| 03.02 | Desk TI-1400 with cable duct | EN 15372 | 1 | 118 | ERP, job 26-0411 |
| 03.03 | Headboard PL-KT18, upholstered | EN 1021-1/-2 | 1 | 118 | CAD/CAM, upholstery |
| 03.04 | Wall panel PL-19, oak veneer | B-s1,d0 | 4 | 472 | File share, classification report |
| 03.05 | Bedside table NT-450 | E05 | 2 | 236 | ERP |
| 03.06 | Chair ST-21, stained beech | EN 16139 | 1 | 118 | ERP, chair making |
Delivery floor by floor from week 14 · installation by Tannried · opening on 1 July
Table TI 1,800 × 900 · FSC · E05 · HPL · EN 15372Table TI product series · data sheet TI 1.800 × 900.pdf · job 26-0424, university
Customer #1744 is building the new hotel OB 26-031 with 118 rooms. Each room has a KS-1200 from job 26-0412.
Who?
Customer #1744Hotel company, organisationK-1744-2Interior designer, personL-208Mirror supplierL-114Panel millCRM, ERPbuild and supply for this project
What kind?
KS-1200-KAWardrobe with luggage rackTI-1400Desk with cable ductEH-04Light oak decorERP, CAD/CAMfurniture from these series
Which one exactly?
26-0412-03-017Left side panelWE 26-1187Panel batch, FSC Mix 70%LA 26-221Lacquer batch for the PL-19 wall panelsShop-floor data, panel storebuilt into this project
What’s going on?
26-0412Wardrobes, saw week 11SP 26-11-118Cutting planMA 26-0388-02Installation floor 2ERP, production controlrunning for this project
Where?
OB 26-031
CRM, file shareroom schedule, as of the mock-up room
What applies?
AB-26-0388Order: furnishing for room type BMZ-031Mock-up room, signed off on 14 JanWeek 14Floor-by-floor delivery startsERP, CRMapplies to this project
What’s in writing?
Email 24 FebMirror doors not until week 11PB 2025-1184Test report to EN 15372FSCPanel mill’s certificate, checkedMailboxes, file shareabout this project
What should it be?
03.01Wardrobe, 118 pcs03.04Wall panel B-s1,d0, 472 pcs1 JulyOpeningFile sharerequirement for this project
What do we make of it?
F-26-077Mirror doors week 11: 26-0412 moves to week 11, installation from week 14 holdsdemifinding on this project
At the pump maker, the pump with its serial number sits in the middle; at the machine builder, the line at the customer’s site; at the space supplier, the flight unit in orbit. At Tannried, it is the project: a hotel with its room schedule, which turns into jobs, cutting plans and parts. The grid stays, the middle changes.
“KS 1200”, “wardrobe type B” and item 03.01 are the same wardrobe.
Running metres and 150-metre rolls become one value in metres, “the two-mil edge” becomes K1, ABS 2 mm.
Every value shows its source, exact location and version. Unclear rows are kept too.
Which panel batch and which lacquer batch went into floor 2, even five years from now.
After approval, batch holds land in the panel store and releases in the ERP.
Rights
What only estimating sees in the ERP, only estimating sees in demi. The dealer sees its own jobs, the hotel its own project, no other.
A hotel project starts on the left with the tender, runs through BOMs, panels, the saw and installation, and ends with the follow-up delivery after handover.
26 + 28 + 16 + 21 + 108 + 16 + 6 + 9 = 230 people
| Who | Projects & room schedules | Quotes & prices | Costing & margins | BOMs & CNC | Wood origin & certificates | HR & hours | Approves |
|---|---|---|---|---|---|---|---|
| Sales and projects | edits | own projects | – | reads | reads | – | Bid or no bid, dates |
| Estimating and tenders | reads | edits | edits | reads | reads | – | Price, deviations |
| Engineering and planning | reads | – | – | edits | reads | – | Variant, release to the saw |
| Purchasing and logistics | reads | – | purchase prices | reads | edits | – | Purchase order, goods in |
| Quality and certificates | reads | – | – | reads | edits | – | Batch hold, origin |
| On-site installation | own project | – | – | reads | – | own hours | Handover per floor |
| Service and follow-up deliveries | reads | reads | – | reads | reads | – | Follow-up delivery |
| HR | – | – | – | – | – | edits | – |
| Dealer in the portal | own jobs | own prices | – | – | certificates | – | Purchase order |
| Customer #1744 in the portal | own project | own | – | – | certificates | – | Acceptance |
| Origin agent, AI coworker | – | – | – | – | reads | – | Never |
| Tender agent, on someone’s behalf | As much as the person who starts it. No more. | Never | |||||
Every room has keys. They come from your systems and never multiply on their own.
For hotel project OB 26-031, the fitters see the room schedule and their own hours, the project manager sees the quote prices, and only estimating sees the margin. A dealer sees its own jobs and no others.
An agent carries the keys of the person it works for. An AI coworker has its own, and always a person who is accountable for it. Every access is in the log.
Intelligence
Works for the person who starts it
AI coworker, accountable: head of production planning
Works for the person who starts it
Works for the person who starts it
A variant’s part sizes, edge pattern and drilling pattern follow from the rules in the configurator and CAD/CAM, from the 32 mm grid to the number of hinges per door height.
Calculations run on Tannried’s own rules and data, not in the language model. Anything that goes out or is written back to a system is approved by a person.
The roadmap
From the deadline on, the origin check runs every day. Next come three stations that still work without demi today.
Every offcut like R-0331 keeps its size, decor and batch. When the cutting optimisation nests it into a new cutting plan, the FSC claim and the proof of origin go with it onto every new part.
Which lacquer batch, which edgebander, which CNC program: straight from shop-floor data and the finishing line onto the part. Then a follow-up delivery matches the first one straight away.
What stands in every hotel, floor by floor, with batch and test report. It becomes the digital product passport as soon as the EU rule for furniture arrives.
Sources
Through 2026, Gartner expects organisations to abandon 60% of AI projects that lack AI-ready data.
Gartner · 2025 · on step 1, dataOpen the source (opens in a new tab)Share sensitive data in LLM apps on a least-privilege basis only, meaning just what a user or process needs.
OWASP GenAI Security Project · 2025 · on step 2, rightsOpen the source (opens in a new tab)70% of AI’s potential value sits in core functions such as sales, manufacturing and supply chain.
Boston Consulting Group · 2025 · on step 3, intelligenceOpen the source (opens in a new tab)In 20 minutes we show you demi on a case like yours: bring the data together, set the rights, let AI do the work.
Tannried Möbelwerk GmbH is made up: a typical company in Wood & Furniture, not a real one. An estimate from our assumptions, not a promise. You can change every number in the configurator.