Who?
Customers, contacts, teams
Customer #9061Steel service centre, customer since 2009K-9061-3Head of maintenance, personOE-KD-PDInspection service within customer service
CRMoperated by customer #9061
Conveyra UK Limited · Birmingham·, group HQ Neunkirchen (Saar), Germany·, since 1952·, 2,400 people·, 7 sites in 7 countries
Getting started with AI · Conveying & Intralogistics
Conveyra builds overhead cranes and electric chain hoists, plus belt and vertical conveyors for the material flow in the same hall, and leads the world market in automated coil cranes. Every crane system is engineered to a specification, inspected every year and looked after for decades. The cases and figures on this page are calculated for the Overhead Cranes business unit at the home plant in Neunkirchen: 350 of the group’s 2,400 people.
Conveyra doesn’t exist. Everything else on this page will feel familiar.
demi turns your systems into one record, carries over your rights and lets AI agents prepare the routine work. First the data, then the rights, then the AI. A person always approves.
What five use cases free up
+1,189 h per yearEstimate, not a promise≈ €77,285 per year, calculated cautiouslyCrane inspection logEquipment record
Hoist service life used (14 Oct 2026)62%
Next inspection 10/2027Tag on the crane, month 10 punched. The inspection service comes every year.
ConveyraManufacturer and
inspection service
Periodic inspectionPB 26-0542-10
ResultFit for continued use. Correct defects 1 and 2 by .
Note to the operator: Crane runway, rail fixing loose at column 7.
Competent person, Conveyra customer service
Defects corrected, confirmed by the operator:
The problem
Customer #9061, a steel service centre in Saarlouis, is building Hall 3 for laser cutting and small-parts dispatch. The general contractor ordered two BK 10 t overhead cranes and 46 m of belt conveyor from Conveyra, job K 26-0388. Today is acceptance day for the hall.
The cranes have passed their inspection before first use. The conveyor is running. Then the site manager asks for the final invoice at the agreed price, with no extra costs. Three months of project emails and installation reports hold seven change requests, five of them outside the scope of supply. Not one is recorded as a change order:
In the mailboxes412 emails over three months. Six of them contain a request, usually in the third paragraph.
In the installation reportTwo days of waiting time for the installation crew, because the crane runway had not been surveyed.
In someone’s headThe installation manager agreed to the requests on site. He is already at the next site, in Trier.
Without evidence, the project manager signs. €55,970 of extra work is lost with the final invoice.
Minutes: hall acceptanceK 26-0388
BK 10 t overhead cranes, serial nos. 26-0611 and 26-0612: inspection before first use passed, static test at 12.5 t.
Belt conveyor, 48 m with four curves: in operation, test run without findings.
Final invoice: the general contractor’s site management demands closure with no extra costs.
Change orders: none recorded.
Together that is 6,630 hours a year, about 3.8 full-time roles, in the Overhead Cranes business unit alone. By 2030, six competent persons from the inspection service and five service technicians from maintenance and breakdown service will have worked their last day: eleven of the 64 people in customer service.
Requests come in by word of mouth on site or in the third paragraph of an email. Everything gets built. What gets billed is what someone wrote down.
Serial number in the ERP, inspection log in the service app, circuit diagram in E-CAD, CE file on the file share, service life on the inspector’s laptop. “Which crane is this?” costs a search every time.
On error F31, is it the brake rectifier, the coil or the air gap first? It’s mostly an old hand on the phone who knows. The service report only says what was replaced, not how they got there.
What demi does · An example
The project manager starts the change-order agent on job K 26-0388, three days before acceptance.
412 emails over three months, nine installation reports, the site diary and the general contractor’s bill of quantities.
Each with the email or report it is based on, with date and sender.
Order confirmation and bill of quantities: five requests fall outside, two are within the scope of supply.
Change-order quotes based on Conveyra’s price list and installation rates from the ERP, each with its evidence.
Project management and sales review the drafts and change one price. Unit management approves the change order for the vertical conveyor, because it is over €25,000.
On the table at Thursday’s acceptance
| No. | Request | Evidence | Scope | Change order |
|---|---|---|---|---|
| NT-01 | Last straight of the belt conveyor from 10 to 12 moutsideMail #7714 14 Aug | Mail #7714 14 Aug | outside | €8,940 |
| – | Cranes in RAL 1007 instead of RAL 1028includedMail #7741 20 Aug | Mail #7741 20 Aug | included | – |
| NT-02 | Additional vertical conveyor up to the mezzanineoutsideMail #7790 2 Sep | Mail #7790 2 Sep | outside | €31,400 |
| NT-03 | Two days of waiting, crane runway not surveyedoutsideMB-06 23 Sep | MB-06 23 Sep | outside | €4,380 |
| – | Lift height 7.0 instead of 6.5 mincludedMail #7868 30 Sep | Mail #7868 30 Sep | included | – |
| NT-04 | Conductor rail 6 m longeroutsideMail #7902 7 Oct | Mail #7902 7 Oct | outside | €3,150 |
| NT-05 | Second radio transmitter per crane, with control handoveroutsideMail #7955 21 Oct | Mail #7955 21 Oct | outside | €8,100 |
| 7 requests, 5 change orders | €55,970 |
The two requests within the scope of supply are listed too: the site manager sees that Conveyra draws a clean line.
Five open change orders on one job are not the rule at Conveyra, and the €55,970 is not counted in any figure on this page. The example calculation below only counts the time demi frees up per change order when searching emails and installation reports and drafting the quote: about 22 minutes.
Lift. Convey. Inspect. Since 1952.
Ernst Molitor, a crane foreman at the Neunkirchen ironworks, opens a workshop next to the works gate. With six people, he repairs cranes and mine winches.
The first in-house overhead cranes for rolling-mill and foundry halls, plus belt conveyors for the coal from the mines.
The Neunkirchen mines have been closed since 1968. In July 1982 the ironworks stops making iron and steel too. Molitor Kranbau now builds for machine builders, steel traders and automotive suppliers, and in 1986 delivers its first automated coil crane to a steel service centre.
Its own range of electric chain hoists. From then on, every chain hoist comes from Neunkirchen. For the heavy cranes, the plant buys in wire rope hoists.
The second generation takes the firm abroad, with companies in Atlanta and Shanghai. For the world market the family gives it a name that is easy to say anywhere: Molitor Kranbau becomes Conveyra.
2,400 people, the world market leader in automated coil cranes, companies in six countries and an in-house inspection service. Run by Lena and Jakob Molitor, the third generation.
Office Floor <=> Shop Floor
demi can work at all 14 stations. Pick a use case and see which ones it touches.
The payoff
| Start | Use case | Volume per month | Share | Today per year | Freed up | Value per year |
|---|---|---|---|---|---|---|
| 1 | Find and bill change ordersProject management | 15 × 2 h | 30% | 360 h | 65 h | €4,225 |
| 2 | Find your installed base by serial numberService | 300 × 10 min | 40% | 600 h | 144 h | €9,360 |
| 3 | From error code to cause, step by stepService | 150 × 45 min | 25% | 1,350 h | 203 h | €13,195 |
| 4 | Build quotes from similar past ordersSales | 80 × 3 h | 30% | 2,880 h | 518 h | €33,670 |
| 5 | Variant BOM from the customer's requirementsEngineering | 40 × 3 h | 30% | 1,440 h | 259 h | €16,835 |
| Total | 6,630 h | 1,189 h | €77,285 |
Calculated for the Overhead Cranes business unit. Of 6,630 hours, we count 1,189: volume times time times twelve months, then only the cautious share of that, times 0.6 for partly digital processes. That is about 0.7 full-time roles. Calculated at €65 per hour: €49.50 labour cost in manufacturing according to Destatis, plus workplace, IT and overheads. A number doesn’t fit your company? You can change every one of them in the configurator.
The start
| The first 90 days | Day 1 | Week 1 | Weeks 2 to 4 | Months 2 and 3 |
|---|---|---|---|---|
| Systems | ||||
| Mailboxes, file share | Project mailboxes and job folders, read-only | |||
| ERP, service app | Read-only, via a small connector in their own network | |||
| E-CAD, load spectrum recorder | Read-only | |||
| CRM, configurator, PDM | Read-only | |||
| Use cases | ||||
| 1 Change orders | With approval. Part of daily work from day 30 | |||
| 2 Installed base | With approval | |||
| 3 Error code | With approval | |||
| 4 Quotes | With approval | |||
| 5 Variant BOM | With approval | |||
| Writing back | ||||
| Into the ERP | After approval | |||
They free up the fewest hours, 65 a year, but every change order found is money for work Conveyra has already done. The requests the change-order agent looks for are already in each job’s project mailbox and job folder. Approval lies with project management; above €25,000, with unit management. From week 1, demi knows every crane by its serial number through the ERP and the service app. The breakdown service, quotes and engineering build on that.
1Data
An excerpt from Conveyra’s record.
Nothing gets replaced. Running a different ERP? demi connects to everything, from SAP and Oracle to the specialist software from the next town. At first, demi only reads. A person connects a system after seeing who will read what.
| Serial no. 16-0542 | Source: ERP, delivery for job K 16-0219 |
|---|---|
| Customer #9061, Hall 2 | Source: CRM |
| Crane runway KB 1, 54 m | Source: file share, survey by the hall builder |
| KZ 10 t, S/N 1611-0287 | Source: ERP, as-built BOM |
| FEM 2m (ISO M5) | Source: configurator, design of 16-0542 |
| 62% used | Source: load spectrum recorder, read out 14 Oct 2026 |
| Inspection entry PB 26-0542-10 | Source: service app |
| Defect M 26-0091, load chain | Source: service app, photo 3 of 7 |
| Circuit diagram SP-16-0542 | Source: E-CAD |
| Declaration of conformity KE 16-0542 | Source: file share, CE file |
Customer #9061 runs crane 16-0542, a BK 10 t with a KZ 10 t chain hoist, in Hall 2 on crane runway KB 1.
Who?
Customer #9061Steel service centre, customer since 2009K-9061-3Head of maintenance, personOE-KD-PDInspection service within customer serviceCRMoperated by customer #9061
What kind?
BK 10 tSingle-girder overhead craneKZ 10 tHoist, S/N 1611-0287STL-16-0542As-built BOM52-118-07Load chain, in 212 hoistsPDM, ERPis a BK 10 t with a KZ 10 t
Where?
ST-9061-01The customer’s Saarlouis plantH2-KB1Hall 2, crane runway KB 1, 54 mH3Hall 3, acceptance on 19 NovCRMin Hall 2 since 2016
What’s going on?
T 26-1290Breakdown with error F31: brake does not releaseSB 26-04417Service report on the breakdownService appservice call on this crane
Which one exactly?
Crane 16-0542
ERPdelivered with K 16-0219
What applies?
WV 9061-02Maintenance contract with inspection#26-0412Quote: chain and hookK 16-0219Job for the 2016 deliveryERPcontract for this crane
What’s in writing?
PB 26-0542-10Inspection entry 2026KE 16-0542Declaration of conformitySP-16-0542Circuit diagramBA-BK-DE/FRManual, rev. 4Service app, file share, E-CADabout this crane
What should it be?
M 26-0091Correct defect 1 by 30 NovM 26-0092Correct defect 2 by 30 NovD 1,600 hService life, FEM 2mService appdeadline on this crane
What do we make of it?
F-26-044D will be reached around 2032, plan a general overhaulF-26-045Chain 52-118-07 close to the discard limit in three of this customer’s cranesdemifinding on this crane
At the pump maker, the pump with its serial number sits in the middle; at the machine builder, the line at the customer’s site; at the space supplier, the flight unit in orbit. At Conveyra, it is the crane with its serial number. The grid stays, the middle changes.
Crane 16-0542, “the ten-tonner in Hall 2” at the customer and the folder “SLS H2 BK” are the same crane.
The labels FEM 2m, ISO M5 and “Gruppe 2m” become one value with one service life.
Every value shows its source, exact location and version. Unclear rows are kept too.
The BOM as built in 2016 and as it stands today, with the chain from 2021, not the one in the quote.
After approval, the change order lands in the ERP.
2Rights
What only estimating sees in the ERP, only estimating sees in demi. And at the customer’s site, only the people the operator approves can see a crane’s inspection log.
Until a crane is in place at the operator’s site, sales, engineering, production and installation all have it in hand. After that, customer service keeps coming back to it for decades.
15 + 26 + 14 + 44 + 26 + 114 + 38 + 64 + 9 = 350 people
| Who | Cranes in the field, inspection logs | Engineering, circuit diagrams | Quotes, prices | Costing, change orders | Project mailboxes | HR | Approves |
|---|---|---|---|---|---|---|---|
| Unit management and staff functions | reads | – | reads | reads | – | HR only | Change order over €25,000 |
| Sales | reads | reads | edits | reads | – | – | Quote, price |
| Project management | own job | reads | reads | own job | own job | – | Change order, acceptance |
| Engineering | reads | edits | – | – | own job | – | BOM, circuit diagram |
| On-site installation | per job | reads | – | – | own site | – | Installation report |
| Customer service | edits | reads | spare parts | – | – | – | Inspection finding, spare-part quote |
| Quality and CE | reads | reads | – | – | – | – | Declaration of conformity |
| Customer #9061 in the portal | own cranes | own documents | own | – | – | – | Defects corrected |
| Installed-base agent, AI coworker | reads | reads | – | – | – | – | Never |
| Change-order agent, on someone’s behalf | As much as the person who starts it. No more. | Never | |||||
Every room has keys. They come from your systems and never multiply on their own.
Prices, costing and change orders are seen only by those responsible for them. In the portal, the customer sees only its own cranes, documents and quotes.
An agent carries the keys of the person it works for. An AI coworker has its own, and always a person who is accountable for it. Every access is in the log.
3Intelligence
Works for the person who starts it
AI coworker, accountable: head of customer service
Works for the person who starts it
Works for the person who starts it
AI coworker, accountable: head of engineering
At Conveyra, a change order costs what the price list and installation rates say, and a new crane or conveyor what the in-house costing comes to.
Calculations run on Conveyra’s own rules and data, not in the language model. Anything that goes out or is written back to a system is approved by a person.
The roadmap
The inspector dictates the finding, demi writes the entry in the inspection log. The declaration of conformity and the manual are produced for each serial number, in German and French. From 20 January 2027, the new EU Machinery Regulation applies.
Welding records, weld inspection reports and 3.1 inspection certificates are linked to the main girder and the serial number, not filed in a folder. Then the inspector can still find them twenty years later.
Hoist delivery dates, available installation crews and the hall builder’s runway date in one plan. Then you see a two-day wait coming.
Sources
Through 2026, Gartner expects organisations to abandon 60% of AI projects that lack AI-ready data.
Gartner · 2025 · on step 1, dataOpen the source (opens in a new tab)Share sensitive data in LLM apps on a least-privilege basis only, meaning just what a user or process needs.
OWASP GenAI Security Project · 2025 · on step 2, rightsOpen the source (opens in a new tab)70% of AI’s potential value sits in core functions such as sales, manufacturing and supply chain.
Boston Consulting Group · 2025 · on step 3, intelligenceOpen the source (opens in a new tab)In 20 minutes we show you demi on a case like yours: bring the data together, set the rights, let AI do the work.
Conveyra Fördertechnik GmbH & Co. KG is made up: a typical company in Conveying & Intralogistics, not a real one. An estimate from our assumptions, not a promise. You can change every number in the configurator.