Who?
Customers, contacts, teams
Customer #1520Grid operator, organisation with a framework agreement since 2025K-1520-3Network supervisor, personOE-PFTest bay
CRMoperated by customer #1520
Wattaris Energy UK Limited · London·,
Getting started with AI · Energy & Utilities
Wattaris doesn’t exist. Everything else on this page will feel familiar.
demi turns your systems into one record, carries over your rights and lets AI agents prepare the routine work. First the data, then the rights, then the AI. A person always approves.
What five use cases free up
+893 h per yearEstimate, not a promise≈ €58,045 per year, calculated cautiouslyThe problem
Test bay schedule, week 48Loss measurement system LMS-2 · Calibration certificate KAL-25-118 · 31 routine tests
Mon
5units
26-1288 to 26-1292Tue
6units
26-1293 to 26-1298Wed
4units
26-1299, 26-130026-1284, 26-1285: voltage-regulated, with on-load tap changerThu
12units
Acceptance by the inspector from #1520
26-1301 to 26-1312RV-2025-17, call-off 10Fri
4units
26-1313 to 26-1316from Mon
28units
Every transformer gets a routine test to IEC 60076-1: no-load and load losses, ratio, winding resistance, dielectric tests. LMS-2 measures the losses.
The head of the test bay walks through the bay before the shift starts. The calibration sticker on the LMS-2 loss measurement system reads: valid until 27 November 2026. That is Friday.
Until Friday, the calibration still covers 31 routine tests, twelve of them on Thursday, witnessed by the inspector from grid operator #1520. From Monday, 28 more transformers from the same call-off are waiting, and no customer accepts a test report made with an instrument out of calibration.
Three people spend two days phoning round calibration labs. The first free slot is in December. Call-off 10 slips by two weeks.
In the CAQ systemInstrument LMS-2, next calibration 27 Nov 2026. In October, the reminder went to a shared mailbox that nobody reads any more.
In the technical specificationTL-1520 Rev. 7, section 8.4.2 on page 61: every instrument must be within its calibration interval on the test day, and its calibration certificate must be attached to the test report.
In someone’s headThe metrology coordinator who books the dates with the lab has been on parental leave for three weeks.
Together that is 3,600 hours a year, about 2 full-time roles. The test bay, on which every calibration deadline and every acceptance test depends, loses four of its 14 people to retirement by 2030.
Type test reports, evidence for the VDE-AR-N 4110 plant certificate at grid connection substations, declarations of conformity: for every project, someone has to pull together the versions that are valid.
Grid operators and municipal utilities list hundreds of requirements. Each one is checked by hand against data sheets, type test reports and certificates.
Power ratings, converters, protection relays, firmware versions: only a few people in the company know which combination is certified for which project.
What demi does · An example
demi reads the CAQ system every morning. The next calibration of LMS-2 is due on 27 November, in 46 days.
The test bay schedule already lists 31 routine tests for week 48, plus the acceptance of call-off 10 on Thursday. TL-1520 requires an instrument within its calibration interval on the test day.
An appointment request to the calibration lab for Tuesday, 24 November, in the morning. The test bay schedule moves that day’s six transformers to the afternoon. The head of the test bay approves.
The lab calibrated LMS-2 in the test bay in the morning. From 13:40, the day’s six transformers are on test. The new certificate KAL-26-131 goes into the CAQ system as soon as the head of the test bay approves it. Next calibration: 24 November 2027.
The inspector from #1520 accepts the twelve transformers 26-1301 to 26-1312. Every test report carries the new certificate.
The remaining 28 transformers go into the test bay from Monday. The delivery date in the framework agreement holds.
Service visits under maintenance contracts and periodic inspections at grid connection substations make up most of the deadlines. Nobody spends two days phoning calibration labs for those, as with LMS-2, so the calculation below counts each deadline at its routine effort only.
Every substation has two numbers: the grid operator’s and ours.
Founded in Essen: meters and distribution transformers for the Ruhr’s municipal utilities.
The Senftenberg plant is born: the Lusatian pits that are still working need their mobile 30/6 kV substations converted. Electricians and engineers from the open-cast mines’ power supply take on the job. In 1993 the first compact substation for eastern Germany’s newly built distribution grids leaves the hall.
Stock market listing. Senftenberg gets its own winding shop, and the 630 kVA transformer becomes the plant’s standard unit.
After the wind farms (since 2004), now solar parks too: grid connection substations on former mining land. Sales and project companies in Europe, North America, Asia and Africa.
Since 1 January, the entire 24 kV range leaves the factory free of SF6, with vacuum and dry air.
Office Floor <=> Shop Floor & Test Bay
demi can work in all 14 steps. Pick a use case and see which ones it touches.
The payoff
| Start | Use case | Volume per month | Share | Today per year | Freed up | Value per year |
|---|---|---|---|---|---|---|
| 1 | Find your installed base by serial numberService | 300 × 10 min | 40% | 600 h | 144 h | €9,360 |
| 2 | Stay on top of inspections and maintenance proofService | 80 × 20 min | 40% | 320 h | 77 h | €5,005 |
| 3 | Spare-part quote from a nameplate photoService | 250 × 20 min | 40% | 1,000 h | 240 h | €15,600 |
| 4 | Match tenders to your productsSales | 10 × 4 h | 50% | 480 h | 144 h | €9,360 |
| 5 | Manual answers right at the machineKnowledge | 400 × 15 min | 40% | 1,200 h | 288 h | €18,720 |
| Total | 3,600 h | 893 h | €58,045 |
Of 3,600 hours, we count 893: volume times time times twelve months, then only the cautious share of that, times 0.6 for partly digital processes. That is about 0.5 full-time roles. Calculated at €65 per hour: €49.50 labour cost in manufacturing according to Destatis, plus workplace, IT and overheads. A number doesn’t fit your company? You can change every one of them in the configurator.
The start
| The first 90 days | Day 1 | Week 1 | Weeks 2 to 4 | Months 2 and 3 |
|---|---|---|---|---|
| Systems | ||||
| ERP, mailboxes | Deliveries and serial numbers, read-only | |||
| E-CAD, CAQ, test bay system | Read-only, via a small connector in their own network | |||
| DMS, service planning | Read-only | |||
| CRM, tender portals | Read-only | |||
| Use cases | ||||
| 1 Installed base | With approval. Part of daily work from day 30 | |||
| 2 Inspection deadlines | With approval | |||
| 3 Spare-part quote | With approval | |||
| 4 Tender | With approval | |||
| 5 Manual on site | With approval | |||
| Writing back | ||||
| Into the CAQ system and service planning | After approval | |||
Use case 1 creates it. Use cases 2, 3 and 5 build on it. Only once demi knows that ONS 4711 at the grid operator and S 26-0472 in the ERP are the same substation does the spare part find its variant, the answer its manual and the maintenance its substation. Reading is enough for that: ERP and mailboxes from day 1, E-CAD from week 1. The next calibration deadline is already in the calendar, so for the inspection deadlines demi also reads the CAQ and test bay systems from week 1. Technical specifications and maintenance contracts join from week 2, with the DMS and service planning.
1Data
An excerpt from Wattaris’ record.
Nothing gets replaced. Running a different ERP? demi connects to everything, from SAP and Oracle to the specialist software from the next town. At first, demi only reads. A person connects a system after seeing who will read what.
| ONS 4711 “Am Sportplatz” | E-CAD, title block of ÜS-26-0561-01 (call-off 9 under RV-2025-17); CRM, customer #1520 |
|---|---|
| KS 630, S 26-0472 | ERP, order 26-0561 |
| ÜS-26-0561-01 Rev. B | E-CAD |
| AT 630/20, serial no. 26-1187 | Test bay system, SP-26-1187 |
| RS 24, SN R 26-0933 | ERP, as-built BOM |
| LV, 8 feeders, 400 A | E-CAD, circuit diagram |
| IAC AB 20 kA 1 s | DMS, TP-23-044, page 12 |
| LMS-2, KAL-25-118 | CAQ |
| Maintenance WV-1520-03 | Service planning |
| Mail #5174 | Mailboxes, question about the fault passage indicator |
Customer #1520 calls it ONS 4711, Wattaris calls it S 26-0472: a KS 630 with transformer 26-1187.
Who?
Customer #1520Grid operator, organisation with a framework agreement since 2025K-1520-3Network supervisor, personOE-PFTest bayCRMoperated by customer #1520
What kind?
KS 630Compact substation, non-walk-inAT 630/20Transformer, Dyn5, ONANRS 24Switchgear, SF6-freeERP, DMSis a KS 630
Where?
ONS 4711“Am Sportplatz”, #1520’s network areaMV ring 7between ONS 4710 and ONS 4712CRM, E-CADsits on ring 7
What’s going on?
IBN-26-0472Commissioning on 19 Nov 2026SP-26-1187Routine test of the transformerService planning, test bay systemjob at this substation
Which one exactly?
ONS 4711 = S 26-0472
ERP, CRMbuilt under order 26-0561
What applies?
RV-2025-17Framework agreement, call-off 9WV-1520-03Maintenance contractCH-26-0352Opportunity: follow-on contract 2028#26-0904Quote for tender V-26-117CRM, ERPcontract for this substation
What’s in writing?
ÜS-26-0561-01Single-line diagram, Rev. BTP-23-044Type test report, internal arcMail #5174Network supervisor asks about K2E-CAD, DMS, mailboxesabout this substation
What should it be?
TL-1520Rev. 7, 8.4.2: instrument within its calibration interval on the test dayTier 2P0 ≤ 540 W, Pk ≤ 4,600 WDMSrequirement for this substation
What do we make of it?
F-26-112Calibrate LMS-2 before call-off 10, or the test bay stands stilldemifinding on the instrument that tests its transformer
At the pump maker, the pump with its serial number sits in the middle; at the machine builder, the line at the customer’s site; at the space supplier, the flight unit in orbit. At Wattaris, it is the substation in the customer’s grid. The layout stays, the middle changes.
ONS 4711 at the grid operator, S 26-0472 in the ERP and “Sportplatz” in the service report are the same substation.
Load losses in W, kW or per cent become one value in watts, referred to 75 °C.
Every value shows its source, exact location and version. Unclear rows are kept too.
The substation as delivered, revision B, not as quoted.
After approval, the new calibration certificate lands in the CAQ system and the maintenance in service planning.
2Rights
Only the quotes & tenders team sees margins in the ERP, and only that team sees them in demi. And a grid operator sees its own substations, diagrams and test reports in the portal, never anyone else’s.
ONS 4711 passed through the departments in turn: call-off 9 in sales, the diagram in engineering, the transformer and switchgear from production, the routine test in the test bay, commissioning by service on 19 Nov 2026.
26 + 32 + 44 + 24 + 214 + 14 + 44 + 12 = 410 people
| Who | Substations in the grid | Diagrams & docs | Quotes & prices | Costing & margins | Test bay & reports | HR | Approves |
|---|---|---|---|---|---|---|---|
| Sales, grid operators | own customers | reads | own customers | – | reads | – | Technical content of the quote |
| Quotes & tenders | reads | reads | edits | edits | reads | – | Quote, price |
| Engineering | reads | edits | reads | – | reads | – | Diagram, deviation |
| Test bay | – | reads | – | – | edits | – | Test report, instrument |
| Service & commissioning | edits | reads | reads | – | reads | – | Spare-part quote, maintenance |
| HR | – | – | – | – | – | edits | – |
| Grid operator #1520 in the portal | own | own diagrams | own | – | own reports | – | Acceptance in the test bay |
| Deadline agent, AI coworker | reads | reads | – | – | reads | – | Never |
| Tender agent, on someone’s behalf | As much as the person who starts it. No more. | Never | |||||
Every room has keys. They come from your systems and never multiply on their own.
Only the quotes & tenders team opens the costing & margins room, price adjustment clause for copper and core steel included. In sales, the team for grid operators and utilities sees the quotes and prices for those accounts, not the ones for wind and solar farms.
An agent carries the keys of the person it works for. An AI coworker has its own, and always a person who is accountable for it. Every access is in the log.
The roadmap
The four steps shown dashed in the band above. Each one builds on data demi already knows.
Copper, core steel, transformer oil and vacuum interrupters: prices, delivery dates and successor parts per call-off. Purchasing sees which framework agreement draws which quantity before the purchase order goes out.
Winding data, drying and oil filling per serial number go into the record. Planning sequences the transformers of a call-off so that the test bay can test them at a steady pace.
The substation as built: torque values, photos and final assembly checks per serial number. Then service knows every bolt before it opens the door.
3Intelligence
AI coworker, accountable: head of service
AI coworker, accountable: head of test bay
AI coworker, accountable: head of service
Works for the person who starts it
AI coworker, accountable: technical documentation
Every price in a quote is the one Wattaris’ own costing in the ERP produces; for a transformer, it includes the price adjustment clause for copper and core steel. Switching at a substation is done only by a qualified electrician holding the grid operator’s switching authorisation.
Calculations run on Wattaris’ own rules and data, not in the language model. Anything that goes out or is written back to a system is approved by a person.
Sources
Through 2026, Gartner expects organisations to abandon 60% of AI projects that lack AI-ready data.
Gartner · 2025 · Forecast · on step 1, dataOpen the source (opens in a new tab)Share sensitive data in LLM apps on a least-privilege basis only, meaning just what a user or process needs.
OWASP GenAI Security Project · 2025 · on step 2, rightsOpen the source (opens in a new tab)70% of AI’s potential value sits in core functions such as sales, manufacturing and supply chain.
Boston Consulting Group · 2025 · on step 3, intelligenceOpen the source (opens in a new tab)In 20 minutes we show you demi on a case like yours: bring the data together, set the rights, let AI do the work.
Wattaris Energie SE is made up: a typical group in Energy & Utilities, not a real one. An estimate from our assumptions, not a promise. You can change every number in the configurator.