Skip to content
Service & spare partsWater & EnvironmentEnergy & Utilities

Plan meter exchanges by calibration expiry

demi finds every meter whose calibration validity runs out, bundles exchanges into routes, announces them and checks every exchange record.

Today

Electricity, gas, water and heat meters may only measure while their calibration is valid; in Germany that is five to sixteen years, depending on the meter type. A municipal utility has to exchange thousands of meters every year. Planning often happens in lists pulled from master data and sorted by street by hand. Meters slip through, customers are not home for the appointment, and swapped meter numbers or wrong final readings only surface with the annual bill, as complaints.

An example

Wattaris handles the scheduled exchange of electricity and gas meters for a municipal utility. In the utility's master data demi finds 2,990 meters whose calibration validity ends next year: 2,380 electricity meters that are replaced by modern metering devices straight away, and 610 gas meters. The agent bundles them into 52 routes by street, puts electricity and gas in the same basement on one appointment and proposes joint dates with the property manager for apartment blocks. After the first two months it flags 41 records, among them swapped meter numbers in a high-rise and a final reading below the last reading. The back office clears them before the data goes to billing.
Fictional company, typical workflow.

Your data, wherever it lives

A utility's meters live today in meter management or an old database, their locations in the GIS, readings in billing, exchange records as paper or app forms with photos, and cancelled appointments in a mailbox. demi reads, understands and links it all per meter, with your permissions. The AI plans routes and checks records in minutes instead of days, and your back office decides what goes into billing.

Where the data lives today

  • Databases
  • Legacy systems
  • ERP
  • Tickets
  • Scans & paper
  • Photos, video & audio
  • E-mails
Data LayerOne view of everything, with your rights

How demi solves it

Three layers in this order: connect the data first, then the rights, then the AI.

  1. 1 · ConnectData Layer

    The case needs data from meter management, billing, the GIS, field service planning and customer mail. demi replaces nothing and joins, per meter, number, type, year of calibration, validity period, location, access, customer and all previous readings. Exchange records, photos of the readings and customer replies are attached to the meter they belong to.

  2. 2 · PermitPermission Layer

    Fitters see their routes with address, access note and meter number, but no consumption or contract data. Customer data stays with the utility and under its permissions; a service provider sees only the meters in its orders. Announcements to customers and corrections to billing data go out only after an authorised person approves them.

  3. 3 · ActIntelligence Layer

    The agent calculates from the year of calibration and the validity period of each meter type when every meter must be exchanged and bundles the exchanges by street, building and fitter. It drafts the announcements and schedules new dates when customers cancel. After the exchange it checks every record against master data and consumption history: swapped numbers, implausible readings, missing photos. Whatever does not fit goes to the back office for clarification.

How it runs

  1. 1

    demi reads the meter master data and shows every meter whose calibration validity ends next year, by meter type and location.

  2. 2

    The agent bundles exchanges by street and fitter and adds electricity meters that are due to be replaced by modern metering devices anyway.

  3. 3

    It drafts the appointment notices for customers and schedules new dates when someone cancels.

  4. 4

    After each exchange it checks record and photos: meter numbers, final and initial readings, plausibility against past consumption.

  5. 5

    The back office clears the flagged cases and releases the exchange data for billing.

What changes

  • Every due meter in a route in good time

  • Fewer wasted trips, because customers know their date

  • Exchange data is right before the annual bill goes out

What does it bring you?

Check it with your own numbers

Every starting value is an assumption you can change. The calculation sits right below, step by step.

Assumption, editable

Your numbers

Result

+150 hfreed per year

Assumptions and calculation

demi plans exchanges by calibration expiry and checks every record; the back office releases the data.

10 min → 7 min per case

How does it run today?

What is already digital saves less: the factor lowers the share demi brings.

How we calculate

250 meter exchanges × 10 min × 30% × 1.0 (manual) × 12 months = 9,000 min = 150 h

Value per year, before demi costs

Freed per year+150 h

Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.

= Value per year, before demi costs

+€9,750

gained per year

150 h ÷ 1,760 h per role = 0.1 full-time roles

An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.

Combine with more cases and get the package

Questions about this use case

How does demi know the calibration periods of each meter type?

From the rules you store; in Germany they follow the Measurement and Verification Ordinance, for example eight years for electronic electricity meters and six for cold water meters. The agent calculates every due date from the year of calibration and the period and shows which rule applies. If the year is missing in the master data, it flags the meter instead of guessing.

Can the validity of whole lots be extended?

For lots of identical meters there is a sampling procedure. demi shows which meters form a lot and how large it is. Whether a sample test instead of a full exchange is worthwhile is your decision.

How do customers learn about the appointment?

demi drafts the notice as a letter, e-mail or text message, with a time window, access notes and a way to move the date. For apartment blocks the agent proposes joint dates with the property manager. Every notice goes out only after approval.

What does demi check on an exchange record?

Whether meter number, final and initial readings, date and photos are complete and consistent. The agent compares the final reading with the last reading and normal consumption and so spots swapped meters or typos. Corrections happen only after the back office has checked them.

See this case with your data

In the demo we show you the workflow on your own systems.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases