Skip to content
Knowledge & documentationMachinery & Plant EngineeringMetal & MachiningPlastics & PackagingChemicals & Process Industry+2

From whiteboard photo to minutes

A photo of a flipchart or whiteboard is enough: demi reads handwriting and sketches and turns them into minutes and dated tasks.

Today

After a workshop, a problem-solving round at the line or a meeting at the shop floor board, what remains is a flipchart or board full of handwriting. Someone takes a photo, and there it stays: on a phone, in a chat, in a folder. Nobody types up the actions, and at the next audit someone asks what came of the workshop.

An example

At Tarvina, three complaints that the remoulade is too thin lead to a problem-solving round at filling line 2. At the end, the flipchart is full: an Ishikawa diagram, six handwritten actions, initials instead of names. The shift leader photographs it and posts it in the line's Teams channel. demi writes the minutes, links them to line 2 and the item remoulade 250 g and creates six tasks, including calibrating the viscometer by Friday; for one set of initials that fits two employees, demi asks.
Fictional company, typical workflow.

Your data, wherever it lives

Workshop results sit as photos and scans on phones, in Teams chats and e-mails; shop floor boards are wiped after the shift; lines, machines and downtimes are in the MES. demi reads, understands and links them, with your rights. In minutes the AI turns a photo into minutes with tasks, owners and due dates, and the facilitator confirms before anything is created.

Where the data lives today

  • Photos, video & audio
  • Scans & paper
  • Chats
  • E-mails
  • MES
Data LayerOne view of everything, with your rights

How demi solves it

Three layers in this order: connect the data first, then the rights, then the AI.

  1. 1 · ConnectData Layer

    Data sources in this case: photos, scans, chat, e-mail and MES. demi replaces nothing and reads photos and scans of whiteboards, flipcharts and boards, handwriting, arrows and tables included. It links what is written there to the line, machine, item or project from the MES, so every action sits where it belongs.

  2. 2 · PermitPermission Layer

    The minutes are visible to the participants and to everyone who may see the line or project anyway. demi creates tasks only after the facilitator has confirmed the minutes, and every task has an owner who accepts it. Every change stays traceable.

  3. 3 · ActIntelligence Layer

    The agent reads handwriting, abbreviations and sketches and sorts them into decisions, actions, owners, due dates and open questions. Whatever it cannot read with confidence, it flags with the image detail instead of guessing. From each action it drafts a task with owner, due date and a link to the line or machine.

How it runs

  1. 1

    After the workshop, you photograph the flipchart, whiteboard or pinboard and send the photo to demi by chat or e-mail.

  2. 2

    The agent reads handwriting and sketches and flags uncertain passages with the image detail.

  3. 3

    It writes the minutes with decisions, actions and open questions and links them to the line, machine or project.

  4. 4

    The facilitator checks the flagged passages, corrects them and confirms.

  5. 5

    demi creates the tasks with owners and due dates and sends reminders before they are due.

What changes

  • Workshop results get acted on, not just photographed

  • Minutes on the same day, without typing

  • Actions sit with the line and machine and are quick to find at the audit

What does it bring you?

Check it with your own numbers

Every starting value is an assumption you can change. The calculation sits right below, step by step.

Assumption, editable

Your numbers

Result

+144 hfreed per year

Assumptions and calculation

demi turns the photo into minutes and tasks; the facilitator confirms.

30 min → 18 min per case

How does it run today?

What is already digital saves less: the factor lowers the share demi brings.

How we calculate

60 workshops and boards × 30 min × 40% × 1.0 (manual) × 12 months = 8,640 min = 144 h

Value per year, before demi costs

Freed per year+144 h

Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.

= Value per year, before demi costs

+€9,360

gained per year

144 h ÷ 1,760 h per role = 0.1 full-time roles

An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.

Combine with more cases and get the package

Questions about this use case

Can demi really read handwriting?

Yes, print and cursive, plus arrows, tables and simple sketches. Where a word is uncertain, demi flags the passage with the image detail, and the facilitator decides. Initials are matched through a list you store once.

Where do the tasks end up?

Where your team works today: in the ticket system, in Teams or in the line's action plan. Every task is linked to the photo, so its origin is always visible.

Does this work for shop floor boards and shift handovers too?

Yes. A photo of the board after the shift is enough: demi transfers figures, faults and actions, compares them with the downtimes in the MES and shows which points have been open for days.

What happens to the photos?

They stay with the minutes so every entry can be checked, and only people who may see the minutes can see them. You set once how long photos are kept.

See this case with your data

In the demo we show you the workflow on your own systems.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases