Skip to content
Product data & engineeringPumps & ValvesMachinery & Plant EngineeringMetal & MachiningTool & Mould Making+2

St37 becomes S235JR, everywhere

demi finds old material and standard-part designations in ERP, PLM, drawings and certificates and maps them to the current standard.

Today

One steel, three names: St37, S235JR and 1.0038. Old drawings still say Ck45 or GG25, the ERP holds sometimes the material number and sometimes a trade name, and the certificate uses the EN designation. Purchasing, stores and inspection count the same grade separately, and nobody sees how much of it is really used. Standard parts are no different: DIN 933 and ISO 4017 sit in stores as separate items, and at M10, M12 and M14 the spanner no longer fits.

An example

Norvelta keeps the hot-work steel 1.2343 in the ERP under four designations: 1.2343, X37CrMoV5-1, a dealer's trade name and 1.2343 ESR. The agent merges the first three but keeps the remelted ESR material as a separate item, and shows that 1.2343 round bar is bought under three item numbers from two dealers, 18 t a year in total. It also finds 140 fixture drawings specifying "St37" for base plates and 23 items of hexagon head screws to DIN 933, six of them in M12, where ISO 4017 has a width across flats of 18 instead of 19. The head of design releases the mapping, and purchasing pools the quantities.
Fictional company, typical workflow.

Your data, wherever it lives

Today material and standard-part names sit in the ERP item master, in bills of materials in the PLM, in the title blocks of CAD files and old scans, and in mill certificates as PDFs, often in three spellings for the same grade. demi reads, understands and links them, with your access rights. The AI then maps in hours what takes weeks by hand, and your engineering team decides which designation applies.

Where the data lives today

  • ERP
  • PLM
  • CAD & drawings
  • PDFs
  • Scans & paper
Data LayerOne view of everything, with your rights

How demi solves it

Three layers in this order: connect the data first, then the rights, then the AI.

  1. 1 · ConnectData Layer

    Data sources in this case: the ERP, PLM, CAD drawings, mill certificates as PDFs and old drawings as scans. demi replaces nothing and reads every material and standard-part designation from item master, bills of materials, title blocks, purchase orders and certificates. So for each grade and each standard part you see every name under which it is kept, bought and inspected.

  2. 2 · PermitPermission Layer

    Only the people responsible change master data; demi proposes. Every renaming and every merge is released by engineering or master data management, recorded, and can be undone. Prices and suppliers stay visible to purchasing only.

  3. 3 · ActIntelligence Layer

    The agent maps each designation to the current standard and material number through a fixed, maintained mapping table, such as Ck45 to C45E with 1.1191, GG25 to EN-GJL-250 or DIN 933 to ISO 4017. It shows real differences instead of glossing over them: changed widths across flats, tighter limits in the chemical composition, or a remelted steel that stays an item of its own. Where an entry is ambiguous, it asks instead of guessing.

How it runs

  1. 1

    The agent reads material and standard-part entries from item master, bills of materials, drawings, purchase orders and certificates.

  2. 2

    It maps each entry to the current standard and material number and flags what is ambiguous.

  3. 3

    For each grade and standard part it shows all names, item numbers, stock and annual quantities.

  4. 4

    Real differences, such as changed widths across flats, appear as a note on every proposal.

  5. 5

    Engineering and master data management release renaming and merges; purchasing pools the quantities.

What changes

  • One designation per material across all systems

  • Pooled quantities and fewer duplicate items in stores

  • Drawings and orders to the current standard

What does it bring you?

Check it with your own numbers

Every starting value is an assumption you can change. The calculation sits right below, step by step.

Assumption, editable

Your numbers

Result

+120 hfreed per year

Assumptions and calculation

demi maps every material and standard-part entry to the current standard and shows duplicates; you release.

10 min → 6 min per case

How does it run today?

What is already digital saves less: the factor lowers the share demi brings.

How we calculate

150 master records × 10 min × 40% × 1.0 (manual) × 12 months = 7,200 min = 120 h

Value per year, before demi costs

Freed per year+120 h

Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.

= Value per year, before demi costs

+€7,800

gained per year

120 h ÷ 1,760 h per role = 0.1 full-time roles

An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.

Combine with more cases and get the package

Questions about this use case

Where does demi get the current material designations from?

From a fixed mapping table based on the standards in force, such as EN 10027 for steel names and material numbers, EN 10025-2 for structural steels, EN 1561 and EN 1563 for cast iron, and the standards for bolts and nuts. Your engineering team can add its own rules, such as in-house standards. The table is versioned, and every mapping shows its source.

Are St37 and S235JR really the same?

Almost. St37-2 had material number 1.0037; today's S235JR to EN 10025-2 carries 1.0038, may not be rimmed and has tighter limits for phosphorus and sulphur. For most parts S235JR is the right replacement, but the agent shows the difference, and for critical parts your engineering team decides.

What changes when standard parts move from DIN to ISO?

Often just the number, sometimes more: hexagon head screws to ISO 4017 instead of DIN 933 have different widths across flats at M10, M12, M14 and M22, so the tool no longer fits. demi shows such differences per item and assembly before anything is switched. When existing stock is used up and replaced, you decide.

Does demi change master data in the ERP itself?

Only after release. demi proposes renaming and merges with evidence; the person responsible releases them, and only then does demi write them back where an interface exists. Every change is recorded and can be undone.

See this case with your data

In the demo we show you the workflow on your own systems.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases