Today
Space customers require a list of every material and process for each project, with outgassing data, approval status and evidence. Engineers go through the bill of materials down to the last adhesive, coating and heat-shrink sleeve and collect data sheets and test reports. That takes weeks per project, and a material without evidence often surfaces only in the customer's review.
An example
Rennhardt Aerospace has to deliver the declared materials and processes list to ECSS for a satellite harness. The agent pulls 46 materials from the BOM, from wire insulation to potting compound, and backs 43 of them with outgassing values, test reports or earlier approvals. It flags three: a heat-shrink sleeve with no outgassing test, connectors with pure-tin contacts that the project prohibits because of whiskers, and an adhesive with a CVCM of 0.14 % against a 0.10 % limit. The materials engineer in product assurance orders the sleeve test, swaps connectors and adhesive and releases the list after three days.
Your data, wherever it lives
What belongs in your materials list is scattered today: BOMs in PLM and ERP, data sheets as PDFs in folders and e-mails, outgassing reports in the DMS, earlier lists in spreadsheets, limits in standards and public databases. demi reads, understands and links them per material and use, with your rights. The list is ready in days instead of weeks, every value with its source, and your product assurance decides what goes to the customer.
Where the data lives today
- PLM
- ERP
- PDFs
- Office files
- DMS & archive
- E-mails
- Web & portals
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
Data sources in this case: PLM, ERP, DMS, PDF data sheets, earlier lists in spreadsheets and public outgassing data. demi replaces nothing and links every BOM item with its materials and processes, data sheets, in-house test reports, approvals from earlier projects and the customer's requirements. Each material gets a record with values, status and source.
- 2 · PermitPermission Layer
BOMs, test reports and customer requirements are often export-controlled and confidential. The agent shows them only to people cleared for the project. What goes to the customer is released by product assurance, and every release is recorded with version and name.
- 3 · ActIntelligence Layer
The agent reads BOM, data sheets and test reports, assigns each material to its use and checks it with fixed rules against the project's limits: outgassing, prohibited materials, stress corrosion cracking, approval status. It takes values only from documents, each with its source; where nothing is proven, it flags the gap instead of estimating. The language model reads and sorts; the rules do the assessment.
How it runs
- 1
The BOM, the design status and the customer's product assurance requirements are loaded.
- 2
The agent extracts every material and process, down to adhesive, coating, potting compound and solder.
- 3
For each material it finds the data sheet, outgassing values, test reports and earlier approvals in your sources and public data.
- 4
It checks against the project's criteria and flags what is missing, prohibited or needs a request for approval.
- 5
Product assurance resolves the flagged items and releases the list to the customer.
What changes
Materials and processes lists in days instead of weeks
Prohibited or untested materials are caught during design
Every value backed by a test report and its source
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+288 hfreed per year
Assumptions and calculation
demi gathers data sheet, outgassing values and status per material and checks them; you approve.
30 min → 18 min per case
How we calculate
120 materials × 30 min × 40% × 1.0 (manual) × 12 months = 17,280 min = 288 h
Value per year, before demi costs
Freed per year+288 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€18,720
gained per year
288 h ÷ 1,760 h per role = 0.2 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Where do the materials' outgassing values come from?
From your own test reports, for example to ECSS-Q-ST-70-02 or ASTM E595, from manufacturers' data sheets and from public outgassing data. Every value is listed with its source, test standard and date. If a value is missing, the material goes onto the test plan instead of being estimated.
Which rules does demi check the materials against?
The ECSS standards and your customer's product assurance requirements that you provide, such as outgassing limits, lists of prohibited materials and rules on stress corrosion cracking. Stricter customer values take precedence. Every check names the requirement it is based on.
What happens to a material without approval?
The agent prepares the request for approval: use, available data, missing tests and a proposed test plan. Product assurance decides whether to submit it or swap the material. demi tracks the status until the customer answers.
Can materials lists from earlier projects be reused?
Yes. Materials approved in earlier projects come with their status and evidence. The agent shows where conditions differ, such as temperature range, orbit or mission duration, so nothing is carried over unchecked.
