Today
Releases happen in PLM and QMS, but production works from whatever revision lies at the machine. Old drawings sit in workshop folders, on terminals on the shop floor and in e-mails to suppliers, and old forms are still being filled in. It shows only in the audit or on the wrong part.
An example
Before the IATF audit at Arnstein, demi checks 2,300 files in workshop folders, 64 documents on the shop-floor terminals and the drawing attachments in e-mails to 18 suppliers. demi finds 37 outdated copies, among them housing AH-2207 at revision C on the milling cell's terminal, although revision D with a changed M8 thread depth has applied since March. Quality assurance replaces the documents the same day.
Your data, wherever it lives
Your valid revisions live today in PLM and QMS, while the copies are everywhere: in workshop folders on the file share, as documents on the terminals in the MES and as attachments in e-mails to suppliers. demi reads, understands and links them, with your rights. The AI finds old copies in minutes instead of on a walk-through, and quality assurance decides what is replaced or withdrawn.
Where the data lives today
- Folders & drives
- E-mails
- PLM
- QM system
- MES
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
Data sources in this case: PLM, QMS, MES, the file share and e-mail. demi replaces nothing and reads drawing number, revision and version from every copy, whether a file in a workshop folder, a document on a terminal or an e-mail attachment. Each copy is linked, with its location, to the valid revision in PLM or QMS.
- 2 · PermitPermission Layer
Only the folders, terminals and mailboxes you approve are analysed, and in e-mail only attachments sent to suppliers. Only quality assurance may replace or withdraw documents, and every action is recorded.
- 3 · ActIntelligence Layer
The agent recognises documents even without a clean file name, by their title block, footer or content. The comparison with the valid revision follows fixed rules, not an estimate. It reports each outdated copy with its location, the difference to the valid revision and the orders affected, and proposes to replace or withdraw it.
How it runs
- 1
Connect PLM, QMS, MES, the file share and the supplier mailboxes
- 2
Recognise every copy of a drawing, form or instruction
- 3
Compare each copy with the valid revision in PLM or QMS
- 4
Report outdated copies with location, difference and affected orders
- 5
Quality assurance replaces or withdraws them, and demi keeps checking
What changes
Production works from the released revision
Less scrap and fewer complaints caused by old drawings
Document control proven in the audit
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+160 hfreed per year
Assumptions and calculation
demi checks every copy in folders, on terminals and in e-mails against the valid revision; you decide.
5 min → 3 min per case
How we calculate
400 document copies × 5 min × 40% × 1.0 (manual) × 12 months = 9,600 min = 160 h
Value per year, before demi costs
Freed per year+160 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€10,400
gained per year
160 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
How does demi recognise a copy's revision?
By the drawing's title block, by a form's footer with number and version, or by the content itself. If the content differs from the valid revision although the revision letter is the same, demi reports that too. Copies that cannot be assigned clearly go to review.
What about printouts at the machine?
A photo of the title block is enough: demi reads drawing number and revision and compares them with the valid one. For a walk-through before the audit, someone photographs the printouts in a hall one after another, and the list of old revisions is ready when the walk ends.
What happens with suppliers who hold an old revision?
demi shows which supplier last received which revision by e-mail and whether open orders depend on it. Purchasing or quality assurance sends the new revision after approval, and demi records who received it and when.
Does demi check once or continuously?
Continuously. As soon as PLM or QMS releases a new revision, demi looks for copies of the old one and reports them to whoever is responsible. The pre-audit check becomes an ongoing comparison.
