Skip to content
Quality, standards & complianceMetal & Machining

Compile welding documentation per component

demi collects material certificates, WPS, welder qualifications and test reports per component and shows gaps before delivery.

Today

Steel structures and welded components need a complete documentation pack per order. Today someone collects material certificates, welding procedures and welder qualifications from folders, inboxes and spreadsheets. An expired qualification often surfaces only when the customer asks.

An example

Rabenhammer Präzisionsteile builds a welded S355 frame for a plant manufacturer. The agent compiles 36 documents, from EN 10204 3.1 certificates to the visual inspection reports. It flags a weld from 14 May, made two days after the welder's qualification expired, and holds the pack until the welding coordinator has decided.
Fictional company, typical workflow.

Your data, wherever it lives

Today material certificates arrive as PDFs by e-mail or on paper with the delivery, welding procedure specifications sit in the DMS, welder qualifications in spreadsheets or the quality system, test reports as scans and orders in the ERP. demi reads, understands and links them per weld via heat number, welder and date, with your rights. The AI assembles the pack per component in minutes instead of an hour of searching, flags every expired welder qualification before shipping, and the welding coordinator approves.

Where the data lives today

  • PDFs
  • E-mails
  • Scans & paper
  • DMS & archive
  • Office files
  • QM system
  • ERP
Data LayerOne view of everything, with your rights

How demi solves it

Three layers in this order: connect the data first, then the rights, then the AI.

  1. 1 · ConnectData Layer

    The case needs data from the ERP, DMS, QMS and spreadsheets. demi replaces nothing and links orders, components, heat numbers, material certificates, welding procedure specifications (WPS), welder qualifications and test reports; every weld is tied to its welder, procedure and date. demi writes back only after approval.

  2. 2 · PermitPermission Layer

    The welding coordinator approves the pack and is the only one who sees personal qualification data. The customer's pack contains only what the customer is meant to receive, and every step is recorded.

  3. 3 · ActIntelligence Layer

    The agent collects the required documents per component and checks deterministically that every weld was made by a welder qualified on the weld date, using a valid WPS. It lists gaps before delivery, pointing to the missing document.

How it runs

  1. 1

    Take the order and its components from the ERP

  2. 2

    Match material certificates by heat number

  3. 3

    Check every weld against the welder qualification and WPS valid on the weld date

  4. 4

    Add test reports and flag gaps

  5. 5

    The welding coordinator releases the pack

What changes

  • Complete packs at delivery

  • Expired qualifications caught before shipping

  • No more hunting for documents at the end of an order

What does it bring you?

Check it with your own numbers

Every starting value is an assumption you can change. The calculation sits right below, step by step.

Assumption, editable

Your numbers

Result

+144 hfreed per year

Assumptions and calculation

demi gathers certificates, welding procedures and test reports per component and shows gaps; you release.

60 min → 36 min per case

How does it run today?

What is already digital saves less: the factor lowers the share demi brings.

How we calculate

30 component files × 60 min × 40% × 1.0 (manual) × 12 months = 8,640 min = 144 h

Value per year, before demi costs

Freed per year+144 h

Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.

= Value per year, before demi costs

+€9,360

gained per year

144 h ÷ 1,760 h per role = 0.1 full-time roles

An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.

Combine with more cases and get the package

Questions about this use case

Which standards does demi check against?

Against the requirements you store, for example from EN 1090, from the order's execution class or from customer specifications. Your welding coordinator defines which documents each execution class requires. The technical assessment stays with them.

How does demi check welder qualifications?

Every qualification has a process, a material group, a scope and a validity, including extensions. For each weld the agent checks that the qualification was valid on the weld date and covers the process. That is a rule, not an estimate.

Can demi include test reports?

Yes: visual, radiographic, ultrasonic or dimensional inspection, as PDFs from the DMS or by e-mail from the testing provider. The agent assigns them to component and weld and flags any required report that is missing.

How does demi know who made which weld?

From what you already record: weld logs, route cards, ERP confirmations or spreadsheets. If the assignment is missing, the agent shows the gap instead of guessing a welder.

See this case with your data

In the demo we show you the workflow on your own systems.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases