Changeovers cost machine hours every day. Yet a changeover analysis today means someone watches a 90-minute video, times every move and types it into a spreadsheet. That takes a whole day, so it happens once in a workshop and never again. The changeover instruction stays as it was, and every shift does it differently.
An example
At Polivo Kunststoffverpackungen, a setter films the mould change on injection moulding machine SG 7 from VS-38 closures to lids for cream jars: 96 minutes. demi breaks the video into 47 steps and shows that 28 minutes go on fetching, searching and waiting, and that the mould is only brought to temperature after it is installed. The agent proposes preheating the mould outside the machine, staging clamps and hoses on a changeover cart and loading the saved settings from this mould's last run, and writes the instruction with 16 stills. At the next changeover demi measures 61 minutes.
Your data, wherever it lives
What happens during a changeover sits today in videos on smartphones and network drives and in the setters' heads; changeover times are in the MES, the instruction is a Word file in the DMS. demi reads, understands and links videos, times and instructions, with your rights. The AI breaks down a changeover video in minutes instead of a whole day, and your team decides which sequence becomes the standard.
Where the data lives today
- Photos, video & audio
- MES
- Office files
- DMS & archive
- Folders & drives
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
Data sources in this case: videos, the MES, spreadsheets, the DMS and the file share. demi replaces nothing and links the changeover video with machine, mould, order and past changeover times from the MES, and puts the current changeover instruction from the DMS next to it. You see how long this changeover usually takes and what the instruction prescribes.
- 2 · PermitPermission Layer
Filming follows rules you agree with the works council; demi blurs faces and analyses steps, not people. Only those involved in the changeover project see the video. Production management releases the new changeover standard, and the release is recorded.
- 3 · ActIntelligence Layer
The agent recognises the individual steps in the video, such as fetching the mould, loosening clamps, disconnecting hoses, changing the mould, setting parameters and checking the first part, and times them. It marks what could be done while the machine runs and shows walking, searching and waiting. From that it drafts the new sequence and the changeover instruction with stills from the video; the times come from the video, not from estimates.
How it runs
- 1
Someone films a changeover with a smartphone or a fixed camera at the machine.
- 2
demi breaks the video into steps, times each one and separates internal from external set-up.
- 3
The agent marks walking, searching and steps that can happen before or after the stop.
- 4
It drafts the new sequence and the changeover instruction with stills from the video.
- 5
The team checks, production management releases the standard, and the next video shows whether it works.
What changes
Shorter changeovers and more machine hours
One changeover standard every shift follows the same way
Changeover analyses in hours, not once a year in a workshop
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+144 hfreed per year
Assumptions and calculation
demi breaks the video into steps and drafts the standard instead of someone timing every move; you release.
5 h → 3 h per case
How we calculate
6 changeover analyses × 5 h × 40% × 1.0 (manual) × 12 months = 144 h
Value per year, before demi costs
Freed per year+144 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€9,360
gained per year
144 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Does demi rate the people doing the changeover?
No. demi analyses steps, walking and waiting, not the performance of individuals, and blurs faces. You agree with the works council what is filmed and how long videos are kept, and demi follows those rules.
What camera do I need?
A smartphone on a tripod is enough. If you also want to capture the walks to the mould store, film with a second camera or carry the smartphone along. Sound helps recognition but is not required.
How does demi know what can be done as external set-up?
From the rule that only steps requiring a stopped machine must be internal, and from what happens in the video: a mould that is only preheated during the stop, or hoses that first have to be found, are typical candidates. Every shift to external set-up is a proposal with its reasons; you decide whether it is technically possible.
What happens with the new changeover standard?
demi writes it as a changeover instruction with stills from the video and files it in the DMS after release, translated for every shift if you wish. With each new video demi measures whether the changeover time drops and shows steps that are taking longer again.