Today
A haul truck tyre costs as much as a small car, and in a quarry it fails in many ways: cuts from sharp rock on the haul road, heat on long climbs, low pressure, fast cornering with a full load. The data exists in telematics, tyre pressure monitoring, workshop lists and invoices, but never side by side. So nobody sees which road eats the tyres until the next one fails and the truck stands still.
An example
At Montanis Hartsteinwerke, six haul trucks with a 55 t payload run between the face and the primary crusher. The agent shows that the tyres of the two trucks working the new bench 3 are scrapped after 2,900 instead of 4,600 operating hours on average. The causes are a 900 m climb on which the rear tyres run above their TKPH rating and a bend with spilled rock where two thirds of the cuts occur. At about 15,000 euros per tyre that costs some 55,000 euros a year. Site management has the bend graded daily and limits speed on the climb; the workshop tracks in the agent whether tyre life rises again.
Your data, wherever it lives
Tyre data is scattered today: serial numbers, positions and tread depths in spreadsheets and on the workshop's check sheets, payload, roads and speed in telematics, pressure and temperature in the tyre pressure monitoring, invoices and framework agreements in the ERP, damage photos on phones. demi reads, understands and links them per tyre, with your rights. The AI sees in minutes which haul roads and driving styles eat tyres; your site management decides what changes on the road.
Where the data lives today
- Telematics
- Machines & sensors
- ERP
- Office files
- Scans & paper
- Photos, video & audio
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
The case needs data from telematics, tyre pressure monitoring, maintenance, the ERP and the workshop's tyre lists. demi replaces nothing and links every tyre by its serial number to vehicle, position, fitting date, operating hours, pressure and temperature, tread depth, payload, haul roads and cost. Every tyre gets a record from fitting to scrapping.
- 2 · PermitPermission Layer
Workshop and site management see tyres, vehicles and haul roads; purchase prices and framework agreements only purchasing and plant management. The analysis covers vehicles, roads and driving patterns, not individual drivers; an analysis per person exists only if a works agreement allows it. Tyre changes, orders and changes to haul roads are decided by authorised people.
- 3 · ActIntelligence Layer
The agent computes for every vehicle and haul road the actual tyre load in tonne-kilometres per hour (TKPH) and compares it with the value the tyre is rated for. Across the fleet it spots patterns: cuts on one haul road, heat on long runs, slow pressure loss before a failure, uneven wear on one axle. From this it proposes pressure, rotation, speed on individual sections or haul road maintenance. Values come from measurements and telematics; the language model only explains.
How it runs
- 1
demi reads the workshop's tyre lists and creates every tyre with serial number, vehicle, position and fitting date.
- 2
Telematics and tyre pressure monitoring add payload, road, speed, pressure and temperature for every cycle.
- 3
The agent computes the load per tyre and haul road and compares it with the value the tyre is rated for.
- 4
At every check and after any damage the workshop records tread depth and a photo, and the agent shows which roads and driving styles wear tyres out early.
- 5
Workshop and site management decide on pressure, rotation, speed and road maintenance; purchasing places the orders.
What changes
Every tyre with its record, load and cost per operating hour
Causes on the road and in driving visible before the next tyre fails
Longer tyre life and fewer unplanned stops
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+108 hfreed per year
Assumptions and calculation
demi keeps every tyre with load, findings and cost and finds the cause; the workshop decides.
30 min → 21 min per case
How we calculate
60 tyre findings × 30 min × 30% × 1.0 (manual) × 12 months = 6,480 min = 108 h
Value per year, before demi costs
Freed per year+108 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€7,020
gained per year
108 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Our trucks have no tyre pressure monitoring. Is telematics enough?
For payload, speed, roads and operating hours, yes. Pressure and temperature then come from the workshop's checks, recorded by voice or a photo of the gauge. With pressure monitoring the agent sees slow pressure loss days before a failure.
What does a tyre's TKPH rating mean?
For every tyre the maker states how many tonne-kilometres per hour it can take before it gets too hot. The agent computes the actual value per vehicle and haul road from payload, speed and cycle time. If it is higher, the tyre risks heat separation, and the agent shows which section drives the value.
Is driving style judged per driver?
No. The analysis covers vehicles, haul roads and sections. An analysis per driver exists only if a works agreement explicitly allows it. Advice on driving goes to the whole shift, for example on the speed in one particular bend.
How does the workshop record tread depth and damage?
Right at the truck: the mechanic speaks tyre, position and tread depth and photographs cuts or bulges. The agent assigns everything by serial number and position to the right tyre and asks back if a value does not fit the last one.
