Skip to content
Service & spare partsAerospace

Check airworthiness directives for your fleet

Each new directive is checked by part and serial number, with work orders ready as drafts.

Today

For every new directive, someone checks by hand which aircraft, engines or components it applies to. That means matching its effectivity against configuration and modification status. Repeat inspections and proof of closure are tracked in spreadsheets.

An example

A maintenance organisation for a regional fleet receives a directive on hydraulic pump HP-7741, serial numbers 2100 to 2450. The agent finds four affected pumps, one of them already modified and released with an EASA Form 1. For the other three it drafts work orders with due dates by flight hours, each citing the paragraph of the directive.
Fictional company, typical workflow.

Your data, wherever it lives

Today directives and bulletins arrive as PDFs from authority and manufacturer portals, while configuration, flight hours and cycles sit in the maintenance system, work orders in the ERP, logbooks and records in the DMS and repeat inspections in spreadsheets. demi reads, understands and links them per component and serial number, with your rights. For every new directive, the AI shows in minutes instead of hours which components are affected and when they fall due, and certifying staff sign off.

Where the data lives today

  • PDFs
  • Web & portals
  • Databases
  • ERP
  • DMS & archive
  • Office files
Data LayerOne view of everything, with your rights

How demi solves it

Three layers in this order: connect the data first, then the rights, then the AI.

  1. 1 · ConnectData Layer

    The case needs data from the maintenance system, ERP and DMS. demi replaces nothing and links directives and bulletins to component configuration by serial number, logbooks, work orders and records; every component is one record with its modification status and history. demi drafts work orders and writes back only after approval.

  2. 2 · PermitPermission Layer

    Airworthiness staff see their own fleet, and certifying staff sign off every task. The agent's output never replaces the official record of compliance, and every step is recorded.

  3. 3 · ActIntelligence Layer

    The agent extracts effectivity and compliance times, matches them exactly to part number, serial number and modification status and computes due dates from recorded flight hours and cycles. For every finding it cites the paragraph of the directive and the record.

How it runs

  1. 1

    A new directive or bulletin comes in as a PDF.

  2. 2

    The agent extracts part numbers, serial range, modification status and compliance times.

  3. 3

    demi matches them against the configuration of every component.

  4. 4

    For affected components, the agent computes the due date from flight hours and cycles and drafts the work order.

  5. 5

    Certifying staff review and sign off; the record sits in the maintenance system.

What changes

  • Every new directive checked against the whole fleet

  • Due dates follow actual utilisation

  • Audit-ready proof of closure

What does it bring you?

Check it with your own numbers

Every starting value is an assumption you can change. The calculation sits right below, step by step.

Assumption, editable

Your numbers

Result

+162 hfreed per year

Assumptions and calculation

demi checks each directive against part and serial number and drafts the work orders; you approve.

90 min → 63 min per case

How does it run today?

What is already digital saves less: the factor lowers the share demi brings.

How we calculate

30 airworthiness directives × 90 min × 30% × 1.0 (manual) × 12 months = 9,720 min = 162 h

Value per year, before demi costs

Freed per year+162 h

Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.

= Value per year, before demi costs

+€10,530

gained per year

162 h ÷ 1,760 h per role = 0.1 full-time roles

An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.

Combine with more cases and get the package

Questions about this use case

Who signs off compliance?

Always certifying staff, as your approval requires. The agent prepares the match, the due date and the work order and names its sources. The official record is made in the maintenance system by a person, and the airworthiness assessment stays with your experts.

Can demi read directives from different authorities and manufacturers?

Yes. The agent reads directives and bulletins as PDFs, whichever authority or manufacturer issues them, and puts them into the same structure. Part numbers and serial ranges are copied exactly. If the effectivity is unclear, it flags the directive for review.

How are repeat inspections tracked?

Every repeat inspection is a task on the component, with its interval in flight hours, cycles or calendar time. demi computes the next due date from recorded utilisation and shows open inspections before they fall due. You no longer need separate tracking spreadsheets.

What if the configuration in the system is wrong?

The agent matches only against what is recorded and shows the record it used. If logbook, work order and configuration contradict each other, it flags the component instead of marking it as not affected. Resolving it stays with your experts.

See this case with your data

In the demo we show you the workflow on your own systems.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases