Today
Since 6 August 2026, furniture and wood-based articles in the EU may release no more than 0.062 mg/m³ of formaldehyde in the test chamber, half the E1 level, measured on the finished article. For the US the boards need TSCA Title VI certification and every piece a label, with records kept for three years; customers in Japan ask for F☆☆☆☆. The proof sits per board batch in delivery notes, invoices and test reports, and nobody links it to the furniture the boards went into. A gap shows only when a customer or an authority asks.
An example
Tannried Möbelwerk is loading 240 TI 1800 tables (1,800 × 900 mm) for Chicago and 120 cabinets for Lyon. For the tables, every particleboard batch has an invoice with the TSCA statement and the certifier's number, and the agent drafts the label with maker, month and year of production. For the cabinets, one MDF batch comes from a back-up supplier whose delivery note only says E1, which is no longer enough as proof for the EU limit. The head of quality holds the 36 cabinets made from that batch, and the request to the supplier is ready as a draft.
Your data, wherever it lives
Today the proof sits in the board suppliers' delivery notes and invoices, in test reports as PDFs or scans, in e-mails and the DMS, while batches and production orders live in the ERP. demi reads and understands these papers and links every board batch to the furniture it went into, with your access rights. The AI then checks each shipment in minutes against the rules of its market, and your quality team decides what gets loaded.
Where the data lives today
- ERP
- PDFs
- Scans & paper
- E-mails
- DMS & archive
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
Data sources in this case: the ERP, e-mail, the DMS and the board suppliers' papers as PDFs and scans. demi replaces nothing and links every board batch to its delivery note, invoice, emission class, test report and certificate, and through the production orders to every piece of furniture it went into. So each shipment shows which proof exists for its target market.
- 2 · PermitPermission Layer
Test reports and supplier certificates are visible to quality, purchasing and shipping. Only the head of quality decides whether a shipment with missing proof is loaded; every release and every hold is recorded with name and date.
- 3 · ActIntelligence Layer
The agent reads emission class, test method, test date and certificate number from every supplier document, scans included, and checks them against the rules of the target market. These rules are fixed and versioned; the language model only explains why a proof falls short. Where one is missing, the agent drafts the request to the supplier.
How it runs
- 1
Every board delivery comes with delivery note, invoice and test report, by e-mail or on paper.
- 2
The agent reads emission class, test method and certificate number and links them to the board batch from the ERP.
- 3
Through the production orders it links each batch to the furniture it goes into.
- 4
Before loading it checks each shipment against the rules of its target market and drafts labels and statements.
- 5
Quality assesses every gap and releases or holds the shipment.
What changes
Every shipment with the proof its market asks for
Gaps found before loading, not by the customer
Records for customers and authorities on demand
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+144 hfreed per year
Assumptions and calculation
demi links every board batch to its proof and checks each shipment against its market; you release.
30 min → 18 min per case
How we calculate
60 shipments × 30 min × 40% × 1.0 (manual) × 12 months = 8,640 min = 144 h
Value per year, before demi costs
Freed per year+144 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€9,360
gained per year
144 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Which rules does demi know per market?
The rules your quality team sets for each market, such as the EU limit of 0.062 mg/m³ for furniture and wood-based articles under REACH, certification, labelling and record keeping under TSCA Title VI for the US, and F☆☆☆☆ for Japan. Your customers' requirements come on top. When a rule changes, the new version applies from then on, and earlier checks stay traceable under the old one.
Is the board's proof enough for the finished furniture?
Not always. The EU limit applies to the finished article, and lacquers, adhesives and edges release formaldehyde too. demi shows for each piece which proof exists for boards and coatings and whether the finished item has been tested. Your quality team decides whether a piece also needs a chamber test.
What happens if a supplier only states E1?
The agent flags the batch for every market whose rules ask for more and shows every shipment it goes into. It drafts the request for a current test report, which you release before it goes to the supplier. The head of quality decides what happens to the goods.
Can demi produce the labels for the US?
Yes. For every shipment to the US the agent drafts the label with maker, month and year of production and the statement that the goods are TSCA Title VI compliant, and attaches the invoices with the suppliers' statements. Nothing is printed before release. The records stay on hand for three years, as the rule requires.
